# Verde Solaire: full text of the guides > Verde Solaire Private Limited is an ISO 9001:2015 engineering and construction company that designs and installs rooftop and ground-mounted solar for homes, housing societies, factories and institutions across Delhi NCR, with enquiries now open in West Bengal. More than 50 MW delivered; team experience above 2,000 MW; registered PM Surya Ghar vendor in Delhi and Uttar Pradesh; offices in Noida (head office, D-2, 2nd Floor, Sector 47, Noida 201303) and New Delhi (registered office, C-213, Basement, Sarvodaya Enclave, New Delhi 110017). Phone 080 4889 0647, WhatsApp +91 88263 18849, email info@verdesolaire.com, GSTIN 09AAGCV4977Q1Z6. - PM Surya Ghar central subsidy: ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third kW; ₹78,000 is the maximum, including above 3 kW (PIB, 29 Feb 2024; BSES FAQ, Sep 2025). - Delhi state subsidy: ₹26,000 per kW, capped at ₹78,000, on top of the central subsidy. Eligible residential consumers using up to 400 units a month can use Delhi’s current free 2–3 kW ULA route, subject to the portal check and technical feasibility; do not budget a GBI for new applications. - Uttar Pradesh state subsidy: ₹15,000 per kW capped at ₹30,000, on top of the central subsidy (UP Solar Energy Policy 2022). - PM Surya Ghar loan: collateral-free, repo rate + 0.5% = 5.75% (28 Jul 2026), 10 years. The "7%" figure is from 2024. - Noida city is served by PVVNL (UPPCL); Greater Noida and Greater Noida West by NPCL; Ghaziabad by PVVNL. West Bengal currently has no state solar-subsidy top-up. - Delhi net metering (DERC guidelines, 16 Jul 2026): connection within 10 days up to 10 kW, 25 days above; no application fee for domestic systems up to 10 kW. - GST on a rooftop solar plant: about 8.9% effective since 22 Sep 2025 (5% on panels and inverter, 70% of value; 18% on balance of system and installation, 30%). ALMM List-II (approved cells) mandatory for subsidised net-metering systems commissioned from 1 Jun 2026. Scheme ends 31 Mar 2027. --- # 1 kW solar system price with subsidy Source: https://www.verdesolaire.com/pricing/1-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A 1 kW system is for a compact home with fans, lights, a fridge and a television, rather than regular air-conditioner use. The published price is ₹70,000 to ₹80,000 before subsidy. After the central subsidy and state top-up, the estimated amount is ₹25,000 to ₹35,000 in Noida and ₹14,000 to ₹24,000 in Delhi. It produces about about 113 units a month in Noida or about 109 units a month in Delhi. Use this as a starting point for your decision. The sections below explain output, subsidy and why a slightly larger system often delivers better value. Your written quote follows a roof survey. The published range includes panels, inverter, mounting structure, net metering, installation and warranty. Verde Solaire's published residential range starts at this size: home systems from 1 kW to 50 kW. ## What a 1 kW system is: panels, size and roof area A 1 kW system is two panels. Verde Solaire's recent installations used modules of 530 to 545 Wp, so two 540 Wp panels make a shade over 1 kW. On a raised metal structure they take about 100 to 117 square feet of shadow-free roof, a third of the published 300 to 350 square feet for 3 kW. Almost any independent house, and most builder floors with roof rights, has that much space. The rest of the system, an on-grid inverter, cabling, earthing, distribution boxes and the bidirectional meter, is the same as on a larger installation, which is why the price per kW is higher at 1 kW than at 3 kW. ## How many units a 1 kW system generates The planning figure on Verde Solaire's published savings pages is 1,500 units per kW per year in Noida and 1,450 in Delhi. With a 10% derate for dust, heat and the monsoon, that gives about 113 units a month in Noida and about 109 units a month in Delhi, or between 3.5 and 4 units a day averaged over the year. The average hides the seasons: a clear day in May produces well above it, a foggy week in January well below it. Net metering carries credit from month to month, so the yearly total is what matters. Shading, and panels facing east or west rather than south, reduce the figure on a real roof; a survey catches both. The [monsoon and dust page](/learn/monsoon-and-dust-generation-ncr) has the seasonal picture. ## The subsidy on 1 kW The central subsidy under PM Surya Ghar: Muft Bijli Yojana is ₹30,000 per kW for the first 2 kW, then ₹18,000 for the third, capped at ₹78,000 for 3 kW and above. On 1 kW that is ₹30,000, the same anywhere in India. Both state subsidies sit on top of the central one. The scheme's official end date is 31 March 2027. The subsidy is credited to your bank account after commissioning, not deducted from the quote; the [subsidy guide](/subsidy) explains who pays whom and when. ## Why most homes outgrow 1 kW The subsidy formula rewards the second kW as much as the first. Both are subsidised at ₹30,000 per kW, and Uttar Pradesh's top-up reaches its cap at exactly 2 kW. So a 2 kW system in Noida nets to ₹45,000 to ₹60,000 against ₹25,000 to ₹35,000 for 1 kW: the second kilowatt costs less than the first. In Delhi the comparison is ₹23,000 to ₹38,000 against ₹14,000 to ₹24,000. Per kW, 2 kW is the cheapest size after subsidy in both states. Consumption also grows, and adding panels later means a second application, a second inspection and possibly a larger inverter. Whether a household that took the subsidy on 1 kW can later claim the balance on an expansion is not addressed in the published rules, so size the first application to the consumption you expect in three years. The published sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. ## Who 1 kW suits, and who should size up 1 kW is the right size when three things are true. - **Your average is about 100 to 150 units a month across the whole year.** Add up twelve bills and divide by twelve; summer bills alone overstate it. - **You do not run an air conditioner through the summer.** One in regular use through May and June usually takes a home out of this band. - **The roof or the sanctioned load limits you.** A small terrace with a water tank in the middle, or a sanctioned load of 1 kW, can make 1 kW the practical maximum. Size up when the average is above 150 units, when an air conditioner or an electric vehicle is on the way, or when the roof has room for three panels more. The [3 kW page](/pricing/3-kw) covers the size most Delhi NCR homes are quoted, and the [3 kW versus 5 kW guide](/learn/3-kw-vs-5-kw) the step after that. ## What happens to the bill In Uttar Pradesh a 1 kW system generating about 113 units a month removes almost the whole energy charge for a home using about that much. The fixed charge on the sanctioned load remains, because solar does not remove it. On the published slab rates the net cost in Noida is recovered in roughly three and a half to five years; the [bill calculator](/tools/electricity-bill-calculator) shows the arithmetic for your own units and sanctioned load. Delhi's Cabinet has also approved a scheme offering a 2 or 3 kW rooftop system at no cost to households below a consumption threshold that every home in the 1 kW band is well inside. If it is notified as reported, a self-funded 1 kW system in Delhi would be hard to justify; the [zero-upfront scheme page](/subsidy/delhi-zero-upfront-scheme) tracks what is approved against what is notified. ## Paying for it At this size most customers pay cash, because the net figure is small. The alternative is the PM Surya Ghar concessional loan: collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. On a 1 kW net figure the EMI is a few hundred rupees a month. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the paperwork with you; the [EMI calculator](/tools/emi-calculator) takes any principal, rate and tenure. ## Net metering for a 1 kW system The paperwork is the same as for 3 kW, and Verde Solaire files it as a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. In Delhi the DERC guidelines give the electricity board 10 days to connect a system up to 10 kW, with no application fee for domestic consumers; see the [Delhi net-metering page](/net-metering/delhi). In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits; the [Noida net-metering page](/net-metering/noida) walks through PVVNL's process. Verde Solaire has published a [2 kW installation in Varanasi](/projects/varanasi-2-kw-pm-surya-ghar) under PM Surya Ghar, with Adani 540 Wp modules and a KSolare inverter. Rakhi Sharma, whose 2 kW system was installed under the subsidy scheme, wrote: "The staff of Verde Solaire was very cooperative and helpful. Their installation was top class and was as per their promise." ## Equipment and compliance at 1 kW The rules do not relax for a small system. Subsidised installations must use panels where both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on the ALMM List-II as well as the modules. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). The panels in Verde Solaire's July 2025 price posts carried 25-year performance warranties on all three panel types. A 1 kW quote should still name the panel make, model and wattage, the inverter make and rating, and who pays the meter charges. What [ALMM List-II](/learn/almm-list-ii-explained) means for your subsidy, and how to read a datasheet, are on the [solar panels page](/equipment/solar-panels). ## 1 kW prices by city The system and the central subsidy are the same in every city. The state subsidy, the electricity board and the tariff differ, which is why each city has its own page: [Delhi](/pricing/delhi), [Noida](/pricing/noida), [Greater Noida](/pricing/greater-noida), [Ghaziabad](/pricing/ghaziabad) and [Varanasi](/pricing/varanasi). The neighbouring sizes are the [2 kW page](/pricing/2-kw), the [3 kW page](/pricing/3-kw) and the [5 kW page](/pricing/5-kw). The calculator below gives savings, payback and EMI in one place. ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **1 kW solar panel produces how many units?** On the published planning yield with a 10% derate for dust and monsoon, a 1 kW system in Noida generates about 1,350 units a year, or about 113 units a month. In Delhi it is about 1,305 units a year, or about 109 units a month. Summer months give more and the monsoon and winter give less. **How many units does a 1 kW solar panel produce per day?** About 3.6 to 3.7 units a day averaged across the year in Delhi NCR (1,305 to 1,350 units a year). A clear May day gives more than that and a foggy January day gives less; size the system on the yearly average, not on the best day. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **What is the 1 kW solar panel price in Noida?** ₹70,000 to ₹80,000 published, and ₹25,000 to ₹35,000 after the ₹30,000 central subsidy and the ₹15,000 Uttar Pradesh subsidy. Net metering in Noida city is through PVVNL; Greater Noida and Greater Noida West are on NPCL. **How many solar panels are needed for 1 kW?** Two panels of about 540 Wp, the module size on Verde Solaire's recent installations. They need roughly 100 to 117 square feet of shadow-free roof, a third of the published 300 to 350 square feet for 3 kW. **Is a 1 kW solar system enough for a home?** It suits a home using about 100 to 150 units a month with no air conditioner in regular use. The PM Surya Ghar sizing guide puts 0 to 150 units at 1 to 2 kW and 150 to 300 units at 2 to 3 kW. Because the central subsidy is ₹30,000 per kW for the first 2 kW, most homes in Delhi NCR are quoted 2 or 3 kW rather than 1 kW. --- # Rooftop solar for homes, 1 to 50 kW Source: https://www.verdesolaire.com/solutions/residential Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installs home systems from 1 kW to 50 kW in Delhi, Noida, Greater Noida and Ghaziabad, with enquiries now open in West Bengal. The sizes most homes ask about are 3 kW and 5 kW. A 3 kW system costs ₹1,99,000 to ₹2,10,000 on our published price list and nets to ₹43,000 to ₹54,000 in Delhi or ₹91,000 to ₹1,02,000 in Noida after the central and state subsidy. That size suits a home using 300 to 400 units a month. A bigger bill, a builder floor or a flat changes the answer, and this page covers each case. ## Which size fits your home The government's own guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. Take twelve months of bills, add up the units and divide by twelve, because a size chosen from a June bill will sit half idle in January. - **1 kW and 2 kW** suit small households and second homes using under 150 units a month, and the central subsidy covers a large share of the cost. See [1 kW](/pricing/1-kw) and [2 kW](/pricing/2-kw). - **3 kW** is the most common choice in Delhi NCR. It generates about 338 units a month from about 300 to 350 square feet of shadow-free roof, and it is the size at which the central subsidy reaches its cap of ₹78,000. See [3 kW](/pricing/3-kw). - **5 kW** is for homes with three or more air conditioners running through the summer, or above 400 units a month. The subsidy is the same rupee amount as on 3 kW, so the net cost per kW is higher, but the bill it removes is larger. See [5 kW](/pricing/5-kw) and [3 kW vs 5 kW](/learn/3-kw-vs-5-kw). - **10 kW and above** are for large independent houses. We have published homes at 10, 12, 20 and 30 kW, all quoted per site because structure, cable runs and the inverter choice vary far more between roofs. See [10 kW](/pricing/10-kw). The [system size calculator](/tools/system-size-calculator) turns your monthly units and roof area into a recommended size. An engineer then confirms it on the roof with a shadow analysis before anything is quoted. ## The subsidy in Delhi and Uttar Pradesh PM Surya Ghar: Muft Bijli Yojana pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, so the central subsidy is ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or anything larger. It is a fixed amount by capacity, not a percentage of your quote, and it is paid to your bank account after the net meter is commissioned. To qualify you must be an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy; both the modules and the cells must be made in India; and the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. The [subsidy guide](/subsidy) has a page for each state, the [eligibility checker](/subsidy/eligibility-checker) takes two minutes, and [who pays whom](/subsidy/who-pays-whom) explains why you pay the installer and the government pays you. Delhi's Cabinet also approved, on 1 September 2026, a scheme for eligible residential consumers using up to 400 units a month. Its detailed rules have not been notified yet; the [Delhi zero-upfront page](/subsidy/delhi-zero-upfront-scheme) lists what is known and what is still open. ## Independent houses, builder floors and society flats **An independent house** is the simple case. The roof is yours, the connection is yours, and in Delhi no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. The application goes through the national portal like any other. **A builder floor** needs two things settled before the survey: the right to use the terrace, in writing, from the other owners, and a look at the sanctioned load on your connection. BSES Rajdhani's FAQ says a consumer may install up to or beyond the sanctioned load, with service-line charges above it. The full picture, including who signs when a terrace is shared, is on [solar on builder floors and shared roofs](/learn/solar-on-builder-floors-and-shared-roofs). **A flat in a society** has two routes. The society can put a common-area plant on the shared roof under the RWA provisions of PM Surya Ghar, which pay ₹18,000 per kW for common facilities, up to 500 kW (3 kW per house), EV charging included; Delhi adds ₹2,000 per kW, up to 500 kW. That plant reduces the society's common-area bill, not the bill for your flat. In Delhi there is now a second route: the Seventh Amendment of 20 January 2026 opens virtual net metering to all Delhi consumers, with DISCOMs bearing line and network costs up to set caps, so a group of flat owners can share one plant and have its generation credited to their own connections in an agreed proportion. Uttar Pradesh has not introduced an equivalent scheme yet. The [housing societies page](/solutions/housing-societies) covers both routes. ## What an installation includes The published price for 1 to 5 kW covers panels, inverter, mounting structure, net metering, installation and warranty. On a home roof that scope means: - **Modules.** Recent home installations in Noida and Delhi used Adani and Vikram Solar modules of 530 to 545 Wp. The quote names the make, model and wattage so you can check them against ALMM List-II, which has applied to net-metering projects since 1 June 2026. A 3 kW system needs six panels of this size. - **Inverter.** An on-grid string inverter matched to the array; recent homes used KSolare and Delta. - **Structure.** A galvanised steel mounting structure, raised where the customer wants the terrace usable underneath. The 10 kW Janakpuri system was built on an elevated structure, and the 30 kW residence needed a structure designed so that it did not disturb the exterior of the house. - **Cabling, earthing and protection.** DC and AC cabling, earthing for the array and the inverter, and the protection devices the electricity board inspects before it commissions the meter. - **Net metering.** We file the PM Surya Ghar application, submit the plant details, attend the inspection and follow the bidirectional meter through to activation. In Delhi the regulator now sets 10 days for a connection up to 10 kW, with no application fee for domestic consumers. - **Subsidy claim.** After commissioning we upload the bank details and the claim. The official payout is "within 30 days" of the claim; about 15 days on average. Before any of that, an engineer visits for a free site evaluation and no-obligation proposal, including the shadow analysis. The July 2025 price posts state 25-year performance warranties on all three panel types; the inverter and workmanship terms are set out in the written quote. ## On-grid or hybrid Every system described above is on-grid. It feeds the house by day, exports the surplus through the net meter, and switches off during a power cut because the inverter must not push power into a dead line. If outages are your reason for going solar, you need a hybrid inverter and a battery, which costs more and is not what the published prices describe. The trade-off, and when an ordinary inverter-battery set is the better buy, is worked through on [rooftop solar or inverter battery](/learn/rooftop-solar-or-inverter-battery) and the [off-grid and hybrid page](/solutions/off-grid-hybrid). ## Homes we have installed Published residential work includes a 10 kW system at Greater Kailash on Adani 530 Wp bifacial modules, a 10 kW system at Janakpuri on Vikram modules with a KSolare inverter, a 30 kW residence, homes of 4, 6, 7, 9 and 20 kW across Noida including Sectors 25 and 41, and a 2 kW PM Surya Ghar system in Varanasi on Adani 540 Wp modules. The [projects section](/projects) has a page for each. The oldest of these are the useful ones. S. C. Garg, whose Greater Kailash system was installed when the company still traded as Sirius Electric, wrote that it had been "working continuously without a single day breakdown since 2017". Two Delhi customers say the same thing in different words: the installation was quick, and the only wait was the electricity board's net meter, about which the team kept them informed. ## Paying for it There are three ways. Pay in full against the milestones set out in the quote. Take the PM Surya Ghar concessional loan, which is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, 5.75% on 28 July 2026, over 10 years; Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the paperwork with you. Or, in Delhi, wait for the zero-upfront scheme if your usage is within its limit and you are prepared to wait for rules that are not yet published. The [EMI calculator](/tools/emi-calculator) and the [solar loan page](/solar-loan) cover the first two. ## Questions **What size solar system does a home need?** The PM Surya Ghar sizing guide is 1 to 2 kW for up to 150 units a month, 2 to 3 kW for 150 to 300 units, and above 3 kW for more than 300 units. Average twelve months of bills, not the summer ones. A 3 kW system needs about 300 to 350 square feet of shadow-free roof and generates 360 to 400 units a month in Delhi NCR. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **How much subsidy does a home get in Noida or Ghaziabad?** The same ₹78,000 central subsidy for 3 kW or more, plus the Uttar Pradesh subsidy of ₹15,000 per kW capped at ₹30,000, so ₹1,08,000 on a 3 kW system. September 2026 news reports confirm the state amount is still being paid; UPNEDA has not published a separate 2026 notice. **Can I install solar on a builder floor or in a flat?** On a builder floor, yes, once the right to use the terrace is agreed in writing and the size suits your connection's sanctioned load. In a flat, the society can install a common-area plant with the RWA subsidy of ₹18,000 per kW, and in Delhi flat owners can share one plant through virtual net metering, opened to all consumers by the DERC amendment of 20 January 2026. **Does rooftop solar work during a power cut?** An on-grid system does not. The inverter shuts down when the grid fails so that it does not feed a dead line. If backup matters, you need a hybrid inverter with a battery, which costs more than the published on-grid prices. **What is included in the price?** Verde Solaire's published prices for 1 to 5 kW cover panels, inverter, mounting structure, net metering, installation and warranty. The written quote names the make and model of every component. A 10 kW or larger home system is quoted after a site survey. **How long does a home installation take?** Customers in Noida and Delhi describe the installation itself as quick, a matter of days, and the wait as the electricity board's net meter. In Delhi the DERC now sets 10 days for a connection up to 10 kW from a complete application. Verde Solaire files the application and follows the meter through to activation. --- # Solar for housing societies and RWAs Source: https://www.verdesolaire.com/solutions/housing-societies Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) ## What the subsidy covers: common facilities, not flats The PM Surya Ghar: Muft Bijli Yojana pays two kinds of subsidy. A household gets up to ₹78,000 on its own connection. A society gets ₹18,000 per kW on a plant connected to the meter that runs the lifts, pumps, corridor and campus lighting, the clubhouse and, as the rule says explicitly, EV charging. The rate is the one the scheme pays for the third kilowatt of a home, and the only ceiling is the capacity cap. The cap is worked out per house: a society of 100 flats can claim on up to 300 kW, and the 500 kW ceiling is reached at 167 houses. The Delhi solar portal and the BSES Rajdhani FAQ both add a detail that surprises committees: the cap is inclusive of rooftop plants installed by individual residents. The BSES FAQ also settles who can apply. Any consumer can take net metering, but the subsidy goes only to residential consumers and to society connections for common facilities. A flat owner with a separate meter is a residential consumer and can claim if there is a roof to install on. Where there is not, the same FAQ says installations under group and virtual net metering are eligible, which is where Delhi's 2026 amendment matters. Systems must use both the modules and the cells must be made in India, from 1 June 2026 the cells must appear on the ALMM List-II, and the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. ## Delhi adds a capital subsidy and a five-year incentive Where to apply: start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. The zero-upfront scheme approved by the Delhi Cabinet on 1 September 2026 was described for households; nothing reported covers society common areas. The [Delhi subsidy page](/subsidy/delhi) tracks it. Uttar Pradesh is simpler and less generous. The state subsidy of ₹15,000 per kW is capped at ₹30,000 per consumer, on top of the central subsidy, and the policy describes it as a residential subsidy per consumer. Uttar Pradesh has not published a subsidy for a society's common-area plant. A society in Noida, Greater Noida or Ghaziabad should plan on the central ₹18,000 per kW and the saving on its common-area bill, and treat any state money as a bonus if a notice appears. ## Group and virtual net metering in Delhi Ordinary net metering ties one plant to one meter, and a society, where the roof belongs to everyone and most consumption is inside the flats, rarely fits that shape. DERC's 2019 guidelines created two answers. Group net metering lets one consumer set the credit from a plant at one connection against its other connections in the same electricity board's area. Virtual net metering lets several consumers share one plant's output, each connection credited with an agreed proportion of the units. The Seventh Amendment of 20 January 2026 changed three things: - Virtual net metering now applies to all consumers of Delhi, including consumers on a single point of supply. - Participants may change the share of credit, or add connections to the arrangement, twice in a financial year with two months' notice. - The electricity board bears the service-line and network-augmentation cost on the 11 kV and lower network, recovered through its aggregate revenue requirement, until cumulative virtual and group net-metering capacity reaches 110 MW for BSES Rajdhani, 100 MW for Tata Power-DDL, 30 MW for BSES Yamuna and 10 MW for NDMC. The BSES FAQ's own example is two neighbours jointly applying under virtual net metering on a common roof, with the credit split in the proportion they decide; a society is the same arrangement with more parties. Two other DERC rules shape a society plant. no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade, so a common-area plant above 10 kW, which most are, still goes through a feasibility check, and the 2026 connection timeline above 10 kW is 25 days. Surplus is treated as it is for homes: credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. The [Delhi net-metering page](/net-metering/delhi) lists the portal for each board. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The state's regulations do not describe a virtual net-metering framework of Delhi's kind, so a Noida society's plant is designed around the common-facilities connection: it sits behind that meter and offsets that bill, and each flat's bill is untouched. ## What the society resolution needs to cover The application is made in the name of one connection and the subsidy is paid to one bank account, so the general body has to decide six things before a survey is worth doing: 1. **The connection.** Which common-facilities connection the plant is registered on, and whether any flats join through virtual net metering. In Delhi the shares of credit, and the rule for changing them twice a year, belong in the participants' agreement. 2. **The roofs.** Which terraces are used, who keeps access, and what happens to water tanks, mobile towers and the drying area. Disagreements over roof rights can stop a project before money is discussed. 3. **Capacity and phasing.** The 3 kW per house cap, less any plants residents already have, and whether the society builds in one go or tower by tower. 4. **Money.** Whether the cost comes from the corpus, a one-time contribution or a loan, and who signs the quote. The quote should show the gross price, each subsidy and the net figure on separate lines. 5. **The signatory and the bank account.** Who operates the portal login and whose cancelled cheque goes in, because the subsidy arrives after commissioning, not before. 6. **Maintenance.** Who cleans the panels, how the inverter is monitored and how a fault is reported; the [maintenance and cleaning](/solutions/maintenance-and-cleaning) page explains what a service contract covers. With those points minuted, the process is the standard one: a survey and load study of the common meters, a proposal naming the make and model of every component, the portal application, installation, the board's inspection and net meter, then the subsidy. ## What we have built on shared buildings Verde Solaire has not published a housing-society project. The closest published work is on institutional rooftops, which share what makes a society different from a home: one connection for a building used by many people, a committee as the customer, and a plant well above 10 kW. Mr. P. Sharma, on a 35 kW college in Greater Noida installed in 2019, wrote that "this solar panel system is working very well and has resulted in huge savings in electricity bill to the college". Mr. Atul Singh, on a 20 kW school in Ayodhya, wrote that "the installation by Verde was very smooth and we have been able to reduce our electricity bill". The published list also includes 20 kW at the National Institute of Secondary Steel Technology in Punjab on CEL panels, 147 kW at C-MET Pune on a CPWD order and 170 kW for a Patna division won on tender. In August 2024 the company reported installing 350 kW across 29 schools and 3 colleges in one month for a West Bengal government programme, at 10 kW per school and 20 kW per college. The company is ISO 9001:2015 certified and has delivered more than 50 MW of solar projects. The institutional work is described on the [institutions page](/solutions/institutions) and the [Greater Noida college project](/projects/greater-noida-college-35-kw). There is no published price for a society plant; the company's price list stops at 5 kW because structure, cabling and inverter choice on a 50 kW to 300 kW roof vary too much for a list price. The proposal follows a free site evaluation and no-obligation proposal. For the payback arithmetic on a common-area bill, use the commercial payback tool. ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Can an individual flat owner claim the PM Surya Ghar subsidy?** The subsidy is paid to residential consumers and to society or RWA connections for common facilities. A flat owner with a separate electricity connection can apply as a residential consumer if there is a roof to install on, or a share of a common roof under virtual net metering in Delhi. Plants installed by individual residents count towards the society's 500 kW cap. **What is virtual net metering in Delhi?** Several consumers share the output of one solar plant on a common roof, and each connection is credited with an agreed share of the units. DERC's Seventh Amendment of 20 January 2026 opened it to all Delhi consumers, including single-point supply. Shares can be changed, or connections added, twice a financial year with two months' notice. **Is there a state subsidy for societies in Noida, Greater Noida or Ghaziabad?** The Uttar Pradesh subsidy of ₹15,000 per kW, capped at ₹30,000, is paid per residential consumer. Uttar Pradesh has not published a subsidy for a society's common-area plant, so a Noida or Ghaziabad society should plan on the central ₹18,000 per kW only. **What should the society resolution cover?** Which connection the plant is registered on, which roofs are used, the capacity and any phasing, how the cost is paid, who signs the portal application and which bank account receives the subsidy, the share of credit for each connection if flats participate, and who is responsible for cleaning and maintenance. **How long does the net-meter connection take for a society plant in Delhi?** DERC's Second Amendment Guidelines of 16 July 2026 give the electricity board 25 days for connections above 10 kW. Up to 10 kW the timeline is 10 days and no feasibility study is needed on the same supply type. **Has Verde Solaire installed solar for a housing society?** No housing-society project is published on Verde Solaire's site. The closest published work is institutional rooftops on shared buildings: a 35 kW college in Greater Noida, 20 kW schools in Ayodhya and Punjab, 147 kW at C-MET Pune, 170 kW for a Patna division and 350 kW across 29 schools and 3 colleges in one month. --- # Commercial and industrial rooftop solar Source: https://www.verdesolaire.com/solutions/commercial-industrial Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A factory, office or warehouse roof in Delhi NCR or Uttar Pradesh pays for its solar plant in under four years on Verde Solaire's published model: a 200 kW plant at per kW costs , generates 1,500 units per kW a year, and at a tariff of per unit saves a year, giving a payback of 3.87 years with a loan and a project internal rate of return (IRR) of about 34%. That is the model the company published on its commercial savings pages in May and June 2023, and it is labelled as that model throughout. The rest of this page shows the model with and without a loan, the plants Verde Solaire has actually built, how a business pays for one, and how it connects to the grid in Delhi, Uttar Pradesh and Haryana. Verde Solaire has delivered more than 50 MW of solar projects and has built commercial installations up to 16 MW; it is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. ## The published 200 kW model The May 2023 savings pages for Noida and Delhi run the same 200 kW plant twice: once paid entirely from the company's own funds, and once with 75% of the cost borrowed for five years at 9.25%. Both runs use the same inputs: 1,500 units per kW a year, a contracted tariff of per unit, a 25-year project life, and a project cost of . | Published input or result (2023 model) | Own funds only | 75% loan over five years | |---|---|---| | Total project cost | | | | Debt | none | | | Equity | | | | Annual saving on the electricity bill | | | | Annual loan instalments | none | | | Project IRR | 31.66% | 33.94% | | Equity IRR | 31.66% | 59.85% | | Project payback | 4.09 years | 3.87 years | The point the pages make is that the annual instalment is smaller than the annual saving, so a financed plant is cash-positive from its first year, and the return on the owner's own money is higher because most of the cost is the lender's. Three things have changed since. GST on a rooftop solar plant is now about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). Module prices and commercial tariffs have both moved. And for net-metering projects commissioned from 1 June 2026, the cells must be on the ALMM List-II, the Approved List of Models and Manufacturers. The [commercial payback calculator](/tools/commercial-payback) reruns the arithmetic with your own tariff, load, capital cost and loan terms; the 2023 table is a worked example, not a quote. ## Jindal Prefab, Dharuhera: 430 kW, almost entirely on loan The model is not only on paper. Verde Solaire's largest published factory plant is 430 kW at Jindal Prefab in Dharuhera, Haryana, announced on 30 March 2023 and built with Adani modules, Havells inverters, a module cleaning system and walkways between the rows. SIDBI, the Small Industries Development Bank of India, financed around 95% of the project cost over seven years. The company's June 2023 page says Jindal Prefab pays the instalment out of the reduction in its electricity bill and still saves each month, that the plant is debt-free once the seven-year loan is repaid, and that the small equity share was recovered through accelerated depreciation in the first year. The full published record is on the [Dharuhera project page](/projects/jindal-prefab-dharuhera-430-kw). ## Paying for it: own funds, a loan, and the tax treatment **Capex.** The business buys the plant, owns it from the first day and keeps the whole saving. On the 2023 model that is a payback of just over four years, after which every unit the roof produces has no fuel cost. The company's June 2024 post puts the typical commercial and industrial payback at two to four years, against three to five for homes. **Financed.** Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans. The June 2023 page's argument for borrowing is that many businesses do not want to pull cash out of their operations, and a loan sized so that the instalment sits below the bill saving lets the plant pay for itself. For micro, small and medium enterprises (MSMEs) in manufacturing, the company published in June 2023 that YES Bank had launched YES KIRAN, a six-year term loan with a six-month moratorium for rooftop or ground-mounted plants that supply the manufacturer's own consumption. The cap, rate and eligibility are the bank's and change; the [solar loan page](/solar-loan) covers the application, and the [EMI calculator](/tools/emi-calculator) takes any rate and tenure. **Accelerated depreciation.** Verde Solaire's savings pages describe accelerated depreciation as a tax benefit for businesses that own a solar plant, and the June 2023 page quotes a 40% rate. Depreciation rates are set under the Income Tax Act and depend on when the plant is put to use and on your company's tax position, so confirm the current rate with your chartered accountant before counting it in the payback. **GST.** GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). A GST-registered business may be able to take input tax credit on the plant; whether it can depends on how the plant is used and on its registration, which is again a question for your accountant, not an installer. ## Connecting the plant: net metering, net feed-in and zero-export How the plant connects decides what happens to the units the site does not use at the moment they are generated. Which arrangement applies depends on the state and the electricity board. **Zero-export.** A zero-export device measures the site load and holds the inverters at or below it, so no solar power flows out to the grid. Verde Solaire's 200 kW plant at Jama Corporation, Kanpur, was connected this way because, as the published case study says, Uttar Pradesh did not have net metering for that connection at the time. For a factory that runs through the day the limit costs little, because most of the output is used as it is made. **Net feed-in in Uttar Pradesh.** On 13 May 2023 Verde Solaire posted that the Uttar Pradesh Electricity Regulatory Commission (UPERC) had approved a net feed-in process for rooftop solar, under an order dated 20 March 2023, with exported units paid at the weighted average tariff of large solar projects of 5 MW and above plus a 25% incentive, and expected commercial and industrial installations in the state to rise as a result. Under the Third Amendment of the UPERC rooftop regulations, the compensation for injected units is the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). **Net metering in Delhi.** Delhi's rules are the Delhi Electricity Regulatory Commission (DERC) net-metering regulations. For a connection above 10 kW the July 2026 guidelines set a connection timeline of 25 days, and credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. The board-by-board detail, including the BSES and Tata Power-DDL portals, is on the [net-metering guide](/net-metering). **Haryana.** The 110 kW plant at Marwar Carpets, Panipat, is grid-connected, and the case study records that the factory exported its solar units to the grid while it was shut during the Covid restrictions. UHBVN and DHBVN, the two Haryana boards, are among the registrations listed above. **Diesel generator synchronisation.** A standard on-grid inverter shuts down when the grid drops, which is exactly when a factory is running its generators. DG sync lets the solar plant run alongside them and hold its share of the load. Jama Corporation's plant was built with it; its owner, Rajiv Jalan, wrote that "this solar plant was installed with DG sync and we are able to save hugely on our electricity bills". ## What Verde Solaire has built for businesses Every plant below has its own page on this site, which also lists what was not published. | Site | Capacity | Published detail | |---|---|---| | [Jindal Prefab, Dharuhera](/projects/jindal-prefab-dharuhera-430-kw) | 430 kW | Adani modules, Havells inverters, about 95% SIDBI finance over seven years | | [Jama Corporation, Kanpur](/projects/jama-corporation-kanpur-200-kw) | 200 kW | 598 Waaree modules, three Delta 70 kW inverters, 289,345 units a year, zero-export, DG sync | | [Marwar Carpets, Panipat](/projects/marwar-carpets-panipat-110-kw) | 110 kW | 334 Vikram modules, Schneider inverters, 159,417 units a year, grid-connected | | [Patna division](/projects/patna-division-170-kw) | 170 kW | Won on the customer's tender; "working well and is giving desired generation" | | [C-MET, Pune](/projects/c-met-pune-147-kw) | 147 kW | CPWD order, Emmvee modules, Delta inverter | The two full case studies give measured yields of about 1,447 units per kW a year at Kanpur and 1,449 at Panipat, close to the 1,500 the 2023 model assumes before any allowance for dust. They also give the published saving per unit: about at Kanpur and at Panipat, both rising as the tariff rises. Nikunj Aggarwal of Marwar Carpets gave the factory order after Verde Solaire had installed a plant at his New Delhi home, "when I started getting lower electricity bill at my residence", and wrote that "the company completed the work in record time with high quality solar panels from Vikram and solar inverters from Schneider". **Petrol pumps.** Verde Solaire is registered with Indian Oil for solar plants at petrol pumps, and its April 2024 post adds a Bharat Petroleum registration, noting that the oil companies had asked their fuel stations to put up solar. Referrals of factory, commercial and institutional sites of 50 kW minimum for factory, commercial and institutional referrals (pan-India) qualify for the [referral programme](/referral). ## What the site survey settles Whether the published figures hold for your roof comes down to four things measured on site. Verde Solaire's published offer is a free site evaluation and no-obligation proposal. - **Load profile.** Units used by hour and by season. A plant sized to the daytime load works behind a zero-export device; a larger plant needs net metering or net feed-in to earn on the surplus. - **Roof.** Shadow-free area, the structure it sits on, and room for walkways and cleaning. The two case studies used about 95 square feet per kW with 330 to 335 Wp modules; higher-wattage modules need less. - **Connection.** Sanctioned load, the board's rules for the connection type, and the transformer capacity the board will allow. - **Tariff.** The saving per unit is the tariff you actually pay, including surcharges, which is why the two published sites differ. ## Questions **How much does a commercial solar plant cost per kW?** Verde Solaire's published 2023 model used ₹41,000 per kW, so ₹82 lakh for a 200 kW plant. Prices for a plant of this size are quoted per site after a survey, and GST on modules and cells has since fallen to 5%. **What is the payback period for a factory solar plant?** In Verde Solaire's published 200 kW model the payback is 4.09 years when paid from own funds and 3.87 years with a 75% five-year loan, at a tariff of ₹7.50 per unit. The company's 2024 post gives two to four years as typical for commercial and industrial users. **Can a factory get a loan for a solar plant?** Yes. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs. Its 430 kW plant at Jindal Prefab, Dharuhera, was financed about 95% by SIDBI over seven years. For MSME manufacturers the company published YES Bank's YES KIRAN term loan of up to ₹3 crore for six years with a six-month moratorium; current terms are the bank's. **What is a zero-export device and when is it used?** It measures the site's load and holds the inverters at or below it, so no solar power flows to the grid. Verde Solaire used one at Jama Corporation's 200 kW Kanpur plant because Uttar Pradesh did not offer net metering for that connection at the time. **Does Uttar Pradesh pay for surplus units from a commercial rooftop plant?** Verde Solaire reported in May 2023 that UPERC had approved a net feed-in process with exported units paid at the weighted average large-solar tariff plus a 25% incentive. Under the Third Amendment of the UPERC rooftop regulations, in force from July 2025, the compensation is the weighted-average large-solar tariff plus 25%. **What is accelerated depreciation on a solar plant?** A tax benefit for businesses that own a solar plant, letting a large share of its cost be written off early. Verde Solaire's June 2023 page quotes a 40% rate. The current rate and its value to your company depend on the Income Tax rules and your tax position; confirm with a chartered accountant. **How large a plant has Verde Solaire built?** The company states commercial installations up to 16 MW and more than 50 MW delivered in total. Plants with a published record on this site are 430 kW at Dharuhera, 200 kW at Kanpur, 170 kW at Patna, 147 kW at Pune and 110 kW at Panipat. **Can a petrol pump get solar through Verde Solaire?** Yes. Verde Solaire is registered with Indian Oil for solar plants at petrol pumps, and its April 2024 post says it is also registered with Bharat Petroleum. --- # C-MET Pune: 147 kW for CPWD Source: https://www.verdesolaire.com/projects/c-met-pune-147-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 147 kW rooftop solar plant at C-MET in Pune on an order from CPWD, using Emmvee solar panels and a Delta solar inverter. The customer's review describes the installation work as "very good". This case study covers what has been published about the project: the capacity, client, panel make, inverter make and installation feedback. ## Who the client was C-MET is the Centre for Materials for Electronics Technology, a government research institution with a laboratory in Pune. CPWD is the Central Public Works Department, the agency that builds and maintains central government premises. The order for the plant came through CPWD, which makes this a government works contract rather than a private commercial sale. Verde Solaire is ISO 9001:2015 certified and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. It has delivered more than 50 MW of solar projects. Institutional and government work of this kind is described on the [institutions page](/solutions/institutions). ## What was installed The review names two components: Emmvee solar panels and a Delta solar inverter. Emmvee is an Indian module maker. Delta inverters also appear on Verde Solaire's 200 kW plant for Jama Corporation in Kanpur, so this is a make the company has used on more than one large roof. The review does not give the module wattage, the number of modules, the inverter model or the number of inverters, so those are left out here. What the makes mean, and how to read a specification sheet that names them, is covered under [solar panels](/equipment/solar-panels) and [solar inverters](/equipment/solar-inverters). ## What the customer said Naresh Garg's published feedback praises the quality of Verde Solaire's installation work. The project is a useful example of the components and delivery approach used for institutional rooftop solar. For the arithmetic on a building of your own, use the [commercial payback tool](/tools/commercial-payback) with your monthly units and tariff. Explore more installations on the [projects page](/projects). ## Questions **How big is the solar plant at C-MET Pune?** 147 kW. Verde Solaire installed it on an order from CPWD, the Central Public Works Department, according to the customer review published on Verde Solaire's testimonials page. **Which panels and inverter were used at C-MET Pune?** Emmvee solar panels and a Delta solar inverter, as stated in Naresh Garg's review. Model numbers, module wattage and the number of modules were not published. **Who was the client for the C-MET Pune project?** The order came from CPWD, the Central Public Works Department, for C-MET, the Centre for Materials for Electronics Technology, in Pune. **How was the C-MET Pune installation received?** The customer review describes Verde Solaire's installation work as very good. **Does Verde Solaire install outside Delhi NCR?** Yes. Its offices are in Noida, Delhi and Varanasi, and its published projects include Pune, Punjab, Patna, Kanpur, Panipat and Dharuhera. **What did the C-MET Pune plant cost and how much does it save?** Neither figure has been published, so this page does not estimate them. The commercial payback tool on this site works out the arithmetic for your own building from your bill. --- # Solar for schools, colleges and institutions Source: https://www.verdesolaire.com/solutions/institutions Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire builds grid-connected solar plants for schools, colleges and government buildings, from 10 kW on a school roof to 170 kW at a divisional office. Its published record includes 350 kW installed across 29 schools and 3 colleges in one month under a West Bengal government programme, a 147 kW plant at C-MET Pune ordered through CPWD, and a 20 kW plant at NISST Punjab for Central Electronics Limited. An institution is a different buyer from a homeowner: there is no household subsidy, the order often comes through a tender, and the load runs in daylight and stops at the weekend. This page covers what the company has built, how the arithmetic differs, what tenders check, and where an export limit is needed. ## What we have built for institutions Every project below is one Verde Solaire has published, in a customer's review or in its own updates. Where a make, a year or a result is missing, it has not been published, and the project page says so. | Site | Capacity | Route to the order | What is published | |---|---|---|---| | [School, Ayodhya](/projects/ayodhya-school-20-kw) | 20 kW | Direct | Installed four years before the review; bill reduced, in the school's words | | [College, Greater Noida](/projects/greater-noida-college-35-kw) | 35 kW | Direct, 2019 | "Working very well", with savings on the college's bill | | [NISST, Punjab](/projects/nisst-punjab-20-kw) | 20 kW | Order from Central Electronics Limited | On-grid plant on CEL panels; Verde Solaire is a CEL-registered firm | | [C-MET, Pune](/projects/c-met-pune-147-kw) | 147 kW | Order through CPWD | Emmvee panels, Delta inverter; the electricity board's net meter was delayed | | [Patna division](/projects/patna-division-170-kw) | 170 kW | Customer's tender | "Working well and giving desired generation" | | 29 schools and 3 colleges, West Bengal | 350 kW in one month | State government programme | 10 kW per school, 20 kW per college, within a 2 MW rooftop project | The West Bengal figures come from the company's update of 26 August 2024, which also said it was supplying panels, inverters and structures for a further 850 kW by the second week of that September. A November 2024 update repeated the pattern: 10 kW at schools, 20 kW at colleges. Across all its work the company reports more than 50 MW of solar projects, is ISO 9001:2015 certified, and works with a team with combined experience of more than 2,000 MW. ## Why an institution's load suits solar A school, college or office draws most of its electricity between morning and late afternoon: classrooms, laboratories, fans, lights, computer rooms and pumps run while the sun is up and are largely off at night. A home does the opposite, using much of its power in the evening and relying on net metering to bank the daytime surplus. An institution therefore consumes a large share of its own generation directly, and the metering arrangement matters less to the case. The subsidy arithmetic is also different, because there is no subsidy. Eligibility under PM Surya Ghar: Muft Bijli Yojana is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy, which rules out a school, a college and a government office. An institutional plant is priced on the plant alone, with GST on a rooftop solar plant at about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). The case rests on three numbers: daylight units bought, the tariff paid for them, and the price per kW of the plant. The [commercial payback model](/tools/commercial-payback) takes a monthly bill and a tariff and returns a payback estimate; the same arithmetic for factories and offices is on the [commercial and industrial page](/solutions/commercial-industrial). Two features of institutional loads change the sizing. Schools close for summer holidays in the months of highest generation, and most institutions are shut on Sundays. A plant sized to the roof rather than the load exports heavily on those days, and what that earns depends on the board's rules. Size to the weekday daytime load and treat the holiday surplus as a bonus. ## Net metering, export limits and zero-export Where the electricity board allows net metering at the site, surplus generation goes to the grid and is set off against later consumption. In Delhi, the DERC guidelines amended in July 2026 set a connection timeline of 25 days for a plant above 10 kW, and credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. At institutional size the board may ask for a feasibility check on the local transformer, and the sanctioned load sets the ceiling on capacity. The board pages for [BSES Rajdhani](/net-metering/board/bses-rajdhani), [BSES Yamuna](/net-metering/board/bses-yamuna) and [Tata Power-DDL](/net-metering/board/tata-power-ddl) list what each asks for. In Uttar Pradesh the licensee depends on the address: PVVNL for Noida city, NPCL for Greater Noida and Greater Noida West, PUVVNL for Varanasi. The [Noida](/net-metering/noida) and [Greater Noida](/net-metering/greater-noida) net-metering pages set out the stages for each. Some sites cannot export at all: the board may refuse net metering because the transformer is loaded, the connection may be on a tariff category the regulations do not cover, or a tender may specify that no power leaves the premises. The answer is a zero-export system. An export-limiting controller reads the meter at the point of supply and holds the inverter's output to what the building is using at that moment. The plant is then sized to the daytime base load rather than the roof, and the generation model must exclude the hours when the load falls below the plant's output; a zero-export plant built to a rooftop rule of thumb spends its holidays throttled. Whichever route applies, the net meter is installed and sealed by the electricity board, not the installer. The C-MET Pune review records a long wait for the meter after Verde Solaire and CPWD had filed the documents on time. A tender timeline should allow for that stage. ## How tenders and government orders work Public bodies publish a tender that fixes the capacity, the technical specification, the warranty terms and the completion period, and check bidders against those conditions before price is opened. An award says as much about a firm's paperwork as its engineering. Verde Solaire is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. Three of its published institutional plants came through that kind of route: the Patna plant on the customer's own tender, the C-MET plant on a CPWD order, and the NISST plant on an order from Central Electronics Limited, whose officer wrote that "Verde is a CEL registered firm for solar panel installation and we were very happy with their work". For an institution that is not tendering, the route is the one every customer gets: a free site evaluation and no-obligation proposal. The evaluation needs twelve months of electricity bills, the sanctioned load and tariff category, a look at the roof, and a decision on whether the plant must be zero-export. The proposal that follows names the make and model of every major component, the structure design, the metering route and the commissioning period. ## What to write into a specification Whether the document is a tender or a purchase order, the same lines protect the buyer. - **Modules and cells.** For a net-metering plant commissioned from 1 June 2026, the cells must appear on ALMM List-II. Name the list, not a brand, so bids are comparable. [ALMM List-II explained](/learn/almm-list-ii-explained) sets out what the list covers. - **Inverter.** Make, model, number of units and the warranty in years; [solar inverters](/equipment/solar-inverters) explains the options. - **Structure.** The design wind speed, the material and coating, and whether it is elevated; an elevated frame keeps a school terrace usable. - **Generation.** A units-per-kW-per-year figure or capacity utilisation factor the plant will be measured against, and how. The Patna customer's remark that the plant gives the "desired generation" is a statement against such a figure. - **Metering.** Who files the net-metering application, who follows it up, and what happens to the schedule if the board is late. - **Operation and maintenance.** Cleaning frequency, fault response time and the service term; the [maintenance page](/solutions/maintenance-and-cleaning) lists what a visit covers. The eight checks that apply to any installer, institutional or not, are on [how to choose a solar company](/learn/how-to-choose-a-solar-company). ## What the institutions said The two educational customers who wrote reviews describe plants that had run for years. Atul Singh wrote that the 20 kW plant at the Ayodhya school had been installed "four years back", that the installation "was very smooth", and that the school had "been able to reduce our electricity bill". Mr. P. Sharma wrote that the 35 kW system at the Greater Noida college, installed in 2019, "is working very well and has resulted in huge savings in electricity bill to the college". Both reviews are on the [reviews page](/reviews) in full. ## Questions **Does Verde Solaire install solar for schools and colleges?** Yes. Published institutional work includes a 20 kW plant at a school in Ayodhya, a 35 kW plant at a college in Greater Noida (2019), 20 kW at NISST Punjab for Central Electronics Limited, 147 kW at C-MET Pune on a CPWD order, 170 kW at a Patna division won on tender, and 350 kW across 29 schools and 3 colleges in one month under a West Bengal government programme. **Can a school or college get the PM Surya Ghar subsidy?** No. The central subsidy under PM Surya Ghar: Muft Bijli Yojana is for an Indian citizen who owns a house with a suitable roof and a domestic electricity connection. A school, college or government building is priced without it, and its case rests on daytime consumption, the tariff it pays and net metering. **What size solar plant does a school need?** It depends on the daytime load and the roof. Verde Solaire's published programme work used 10 kW plants at schools and 20 kW at colleges; its other institutional plants range from 20 kW to 170 kW. Twelve months of electricity bills and the sanctioned load fix the size, and a free site evaluation confirms the roof. **Is Verde Solaire registered for government solar tenders?** Verde Solaire's About page says it is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations, is ISO 9001:2015 certified, and has delivered more than 50 MW of solar projects. A 170 kW plant in Patna was won on the customer's tender and a 147 kW plant at C-MET Pune came through CPWD. **What is a zero-export solar system, and when does an institution need one?** A zero-export system uses an export-limiting controller so the plant never sends power to the grid; it only covers the building's own load at that moment. It is used where the electricity board will not allow net metering at the site, or where the sanctioned load or local transformer caps what may be exported. The plant is then sized to the daytime base load, not the roof. **How long does a net-metering connection take for a plant above 10 kW in Delhi?** The DERC guidelines amended in July 2026 set 25 days for a connection above 10 kW, against 10 days for smaller systems. For a school or college in Uttar Pradesh the timeline depends on the electricity board; PVVNL serves Noida and NPCL serves Greater Noida. **Did the Ayodhya and Greater Noida institutions report savings?** Both did, in their own words on Verde Solaire's testimonials page. The Ayodhya school said the plant was installed four years earlier and reduced its electricity bill; the Greater Noida college said its 2019 system was working very well with large savings on the bill. Neither published a rupee figure, so this site does not give one. --- # Ground-mounted solar plants on open land Source: https://www.verdesolaire.com/solutions/ground-mounted Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A ground-mounted solar plant is the right choice when you have open land and the roof cannot do the job: it is too small, cannot carry a structure, is shaded, or faces the wrong way. Verde Solaire lists ground-mounted grid-connected plants as a product, carries the civil foundations, galvanised iron structure, DC and AC wiring, earthing and commissioning in its own scope, and has delivered more than 50 MW of solar projects with a team with combined experience of more than 2,000 MW. This page explains when the ground beats the roof, what a plant on land needs, what Verde Solaire's scope covers, and which panels suit an open site. There is no published per-kW price for ground-mounted work; every plant is quoted after a free site evaluation and no-obligation proposal. ## When ground mount beats rooftop Four things change when the array leaves the roof. **Tilt and orientation are yours to set.** On a roof the structure follows the roof: a sloping tin shed fixes the tilt, a parapet or water tank fixes where the rows can go, and a north-facing slope costs output all year. On the ground the rows face south at the tilt the site's latitude favours, and the gap between rows is chosen so that the low winter sun does not throw one row's shadow onto the next. Verde Solaire's product page gives this freedom as the reason a ground-mounted plant produces more units than a rooftop plant receiving the same sunlight. **Cleaning is done standing up.** Dust is the main loss on any plant in north India, and on a roof every wash means a ladder and someone walking on a sheet roof. On the ground the panels are at waist to shoulder height, with a walkway between rows and a water line along the array. The [maintenance and cleaning page](/solutions/maintenance-and-cleaning) covers the schedule; the [dust and monsoon page](/learn/monsoon-and-dust-generation-ncr) covers what dust costs. **Nothing rests on the building.** A roof structure adds load to the slab or the purlins, which on an old building means a structural check, and it means holes through the waterproofing or ballast to avoid them. A ground-mounted plant needs neither. **The size follows the land, not the roof.** On land the limit is the plot, the sanctioned load on the connection and what the electricity board's transformer can take, which is usually a larger number. Rooftop still wins in two cases. The first is land with a better use, since a plant occupies its plot for the life of the panels. The second is a small home system, because the central subsidy under PM Surya Ghar: Muft Bijli Yojana is written for an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy, which points at a roof. ## What a ground-mounted plant needs **Land.** Verde Solaire's rooftop planning figure is 300 to 350 square feet of shadow-free area for 3 kW. On the ground the same capacity needs more, because row spacing, a cable trench, an inverter room and cleaning access all take area a roof does not need. Treat the rooftop figure as the floor; the survey fixes the number for your plot. **Foundations.** The galvanised iron structure stands on concrete footings, one per column, designed after a look at the soil. Loose fill, black cotton soil and a high water table each change the footing, which is why civil work is a separate line in Verde Solaire's scope. **The cabling run.** On a roof the inverter sits a few metres from the array. On land the array may be a hundred metres or more from the inverter room and further from the metering point. That distance decides the DC cable size, the trench, and whether the AC side runs at low voltage or needs its own transformer. Ask for the single-line diagram with the quote. **Fencing, water and a watch.** An open plot needs a boundary wall or fence, a gate wide enough for a water tanker, and a water point for cleaning. Larger plants add a weather station, as in the photograph below, so that output can be checked against the sun the plant received. ## What Verde Solaire's scope covers Verde Solaire's services page lists the installation and commissioning scope its team takes responsibility for. On a ground-mounted plant it reads as follows. 1. Procurement help 2. Civil work 3. Structure 4. Panels 5. Inverter and ACDB 6. DC electrical work 7. Earthing 8. Commissioning and handover The company is ISO 9001:2015 certified and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. The process from survey to handover is on [how we work](/about/how-we-work); after-sales cover is on [warranty and after-sales](/about/warranty-and-after-sales). ## Panel choice: mono, bifacial or poly Verde Solaire's ground-mounted product page describes three panel types. Polycrystalline panels are the cheapest to make and the page puts their efficiency at 16 to 17%. Monocrystalline panels are cut from a single silicon crystal and the page gives 19 to 20%. Bifacial panels take direct light on the front and reflected light on the rear face. The company's June 2025 comparison for homes adds that bifacial panels reach 19 to 22% and give 10 to 15% more output when the installation lets light reach the back, and warns that on a flat concrete roof the gain may be small. That warning matters on the ground too. Dark bare earth reflects little; a raised structure over light gravel, pale soil or grass gives the rear face something to see. Whether bifacial pays on your plot is a design question, and the quote should say which panel was assumed and why. Verde Solaire's recent installations have used Adani and Vikram modules of 530 to 545 Wp; the [solar panels page](/equipment/solar-panels) explains what those names and figures mean. Two compliance points apply to any grid-connected plant. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). For subsidised net-metering projects commissioned from 1 June 2026, the cells as well as the modules must be on ALMM List-II; the [ALMM List-II page](/learn/almm-list-ii-explained) explains the lists. ## Grid connection and the money A ground-mounted plant connects to the grid the way a rooftop plant does, through the electricity board's net-metering or gross-metering application. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. In Delhi, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade, and the July 2026 guidelines give the board 25 days to connect a plant above 10 kW. The [net-metering section](/net-metering) has the board-by-board process. PM Surya Ghar is a residential scheme for a house with a suitable roof. Most ground-mounted plants sit at a factory, a school, a petrol pump or a farm on a commercial or institutional connection, where no capital subsidy applies and the case rests on the tariff the plant displaces; the [commercial payback tool](/tools/commercial-payback) works that out from your load, tariff and plant size. Whether an array inside a house compound counts as a rooftop system under the scheme is decided by the electricity board at the feasibility stage, and this page does not claim an answer. ## What Verde Solaire has built Verde Solaire has delivered more than 50 MW of solar projects, with commercial installations up to 16 MW. The photographs on this page are from the company's own gallery. The [projects section](/projects) lists the published plants with their capacities, panels and inverters; the [commercial and industrial](/solutions/commercial-industrial) and [institutions](/solutions/institutions) pages cover the connection types most ground-mounted plants sit on. ## Questions **Is a ground-mounted solar plant better than rooftop?** It is better when you have open land and the roof is small, weak, shaded or badly oriented. On the ground the tilt, orientation and row spacing are set for output rather than for the roof, cleaning is done at waist height, and nothing rests on the building. Rooftop wins when land is scarce or the system is a small home system, because the PM Surya Ghar subsidy is written for a house with a suitable roof. **How much land does a ground-mounted solar plant need?** Verde Solaire's rooftop planning figure is 300 to 350 square feet of shadow-free area for 3 kW. A ground-mounted plant needs more than that per kW, because the rows are spaced so that one does not shade the next in winter, and room is left for a cable trench, an inverter room and cleaning access. The survey fixes the figure for your plot. **What does Verde Solaire's scope include on a ground-mounted plant?** As listed on its services page: help with procurement, civil work for the foundations of the module mounting structure, erection of the galvanised iron structure, panel installation, inverter and ACDB installation, DC-side electrical work and wiring, earthing as required, and final commissioning and handover. **Which solar panels are used on a ground-mounted plant?** Monocrystalline or bifacial. Verde Solaire's product page gives monocrystalline efficiency as 19 to 20% and polycrystalline as 16 to 17%; its June 2025 comparison gives bifacial as 19 to 22% with 10 to 15% more output when light can reflect onto the rear face. Subsidised net-metering projects commissioned from 1 June 2026 need cells on ALMM List-II. **Can I get the PM Surya Ghar subsidy on a ground-mounted plant?** The scheme's published eligibility is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has taken no earlier solar subsidy. Ground-mounted plants at factories, institutions and farms are normally unsubsidised commercial connections. Whether an array in a house compound qualifies is decided at the DISCOM feasibility stage, not by the installer. **How long does the grid connection take for a plant above 10 kW in Delhi?** The DERC guidelines of 16 July 2026 set 25 days for connections above 10 kW and 10 days for connections up to 10 kW. In Uttar Pradesh the DISCOM allows capacity within transformer limits under the UPERC rooftop solar regulations of 2019. --- # Off-grid and hybrid solar with batteries Source: https://www.verdesolaire.com/solutions/off-grid-hybrid Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A hybrid solar system gives you backup during a power cut and cuts the electricity bill; an off-grid system does the same job with no grid connection at all. Both cost more than on-grid solar because of the battery, and the PM Surya Ghar: Muft Bijli Yojana subsidy is paid on the solar capacity only: ₹78,000 at 3 kW plus the Delhi or Uttar Pradesh top-up, and nothing on the battery. Verde Solaire's June 2025 explainer put the hybrid or battery add-on for a 3 kW home at to on top of the on-grid price of ₹1,99,000 to ₹2,10,000. For most homes in Delhi NCR the order is on-grid first and backup second, and this page is about the second part: which system does what, when a battery earns its cost, how to size it, and what a hybrid quote must say. If you are still weighing solar against the inverter battery you already own, start with [rooftop solar or an inverter battery](/learn/rooftop-solar-or-inverter-battery). ## On-grid, hybrid or off-grid One point decides everything else. An on-grid system needs no battery because the grid does the storing: the day's surplus goes out through the net meter and comes back at night as credit. In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. A battery only earns its place when the grid is not there, which in a city means during a cut. ## What the subsidy covers, and what it does not Eligibility for the central scheme is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The valid connection is not a formality: the scheme is built around net metering, and the subsidy is calculated per kilowatt of panels, ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000. Delhi adds up to up to ₹78,000 and Uttar Pradesh up to ₹30,000 per consumer, on top of the central subsidy. Three things follow, and Verde Solaire's own May and June 2025 posts say each of them plainly. The battery is not subsidised, whatever its size. A hybrid system is subsidised on its solar capacity, so a 3 kW hybrid in Noida receives the same ₹1,08,000 as a 3 kW on-grid system, and the battery is paid for in full by you. An off-grid system has no net meter, so it receives no subsidy at all. The equipment rules do not change with the inverter type. For a subsidised system both the modules and the cells must be made in India, and for net-metering systems commissioned from 1 June 2026 the cells must be on ALMM List-II. The hybrid inverter model also has to be the one named in the electricity board's feasibility approval, which is why a change of mind after installation costs more than a decision before it. ## When backup makes sense in Delhi NCR Verde Solaire's published advice for Delhi, Noida, Ghaziabad and Varanasi is that supply is "mostly stable", so the recommended route is on-grid with net metering and the subsidy, with batteries added "only if frequent power cuts are a concern". A hybrid earns its extra cost in two situations. The first is a street where the summer cuts run for an hour or more most evenings, when the air conditioners are on and the panels are not. The second is a load that must not stop: a home office, a lift, medical equipment, a shop's refrigeration. Off-grid belongs to a third, a site with no connection at all, and to nothing else in a city, because a battery bank large enough to replace a grid you already have is the most expensive way to own solar. No published source counts cuts by locality in Delhi NCR, so the measurement is yours. Keep a note for one summer month of the date, start time and length of every cut. Two short cuts a month is an inverter-battery problem, and the one you own is probably enough. An hour most evenings is a hybrid problem, and the note becomes the sizing brief. ## Sizing the battery for essential loads only The cost of a hybrid is decided by one choice: which circuits go on backup. A battery sized to run the whole house is an off-grid battery with a grid attached, and it is priced like one. A battery sized to the essential loads is a fraction of that. The arithmetic is short. List the appliances that must run in a cut, with their wattage and the hours you need. Lights, ceiling fans, a router and a refrigerator come to about 400 W, and four hours of that is 1.6 kWh. Lead-acid batteries are designed to use about half their nominal capacity each cycle, so that load needs roughly 3 kWh of nominal storage, which is two 150 Ah batteries in a 24 V bank. Lithium discharges deeper and can be smaller for the same job, at a higher price per kWh. A 1.5 kW air conditioner on the same circuit would empty that lead-acid bank in a little over an hour, which is why the air conditioner is the first question an engineer asks. The hybrid inverter is sized to the largest load that will start while the grid is down, not to the panel capacity. Every figure here is an assumption for the example; on the survey the engineer measures your appliances and writes the real ones into the design. ## What it costs Verde Solaire's published figures are from 2025 and are indicative; the written quote after a survey is the price. A 3 kW on-grid system was published at ₹1,99,000 to ₹2,10,000, which nets to ₹91,000 to ₹1,02,000 in Noida and ₹43,000 to ₹54,000 in Delhi after subsidy. The June 2025 explainer put the hybrid or battery add-on for that 3 kW home at to , and a 5 kW off-grid system with batteries at to . The May 2025 post put a 3 kW off-grid system with batteries at to , with no subsidy. The battery's capacity and chemistry decide where in those ranges a quote lands, and the battery is the one part of the system that will be replaced within the life of the panels. Treat its cost as the price of backup, judged against a generator or the inverter battery you own, and keep the solar arithmetic separate: the panels and the subsidy pay back on their own, the battery does not. The [3 kW page](/pricing/3-kw) has the on-grid figures for every city. ## What Verde Solaire supplies and installs Verde Solaire installs home systems from 1 kW to 50 kW and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, so the solar part of a hybrid system goes through the same portal and net-metering route as any subsidised installation. The company is an authorised solar solutions partner of Luminous, and every quote names the make and model of the panels, the inverter and the battery, which is what lets you check the bill of materials against the words used on the phone. The [inverter page](/equipment/solar-inverters) explains how a hybrid inverter differs from an on-grid one, and the [battery page](/equipment/solar-batteries) covers lead-acid against lithium. The work runs in the same order for every home. An engineer visits, and Verde Solaire offers a free site evaluation and no-obligation proposal. You agree the list of backup circuits and the hours they must run. The design fixes the panel capacity to your bills, the battery to that list and the hybrid inverter to the largest load. For a hybrid system the net-metering application names that inverter, and the installation, inspection and commissioning follow the [nine steps](/subsidy/how-to-apply). For an off-grid system there is no application, and commissioning is a load test with the grid absent. ## How to read a hybrid quote Backup is the part of a solar sale most often promised in speech and absent on paper, because a standard on-grid quote has no line for it. Ask for five things in writing before the advance: backup during a power cut, yes or no; the battery's make, model and capacity in kWh; the circuits it carries and the hours it is designed for; which part of the price the subsidy applies to; and the hybrid inverter model, matching the feasibility approval. A quote that lists an on-grid string inverter and no battery gives no backup, whatever was said. The [before you pay the advance](/learn/before-you-pay-the-advance) checklist has a line for each. ## Questions **What is the difference between on-grid, hybrid and off-grid solar?** On-grid solar is connected to the electricity board's supply through a net meter and has no battery, so it saves money but switches off in a power cut. Hybrid solar is grid-connected and adds a battery, so it saves money and gives backup. Off-grid solar has no grid connection at all and runs the house from panels and batteries alone. **Is there a subsidy on a hybrid solar system?** The PM Surya Ghar subsidy is worked out on the solar capacity: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000, plus up to ₹78,000 more from Delhi or ₹30,000 from Uttar Pradesh at 3 kW. The battery and the extra cost of a hybrid inverter get nothing. An off-grid system, which has no net meter, gets no subsidy at all. **How much does a hybrid solar system cost for a 3 kW home?** Verde Solaire's June 2025 explainer put the hybrid or battery add-on for a 3 kW home at ₹1 lakh to ₹1.5 lakh on top of the published on-grid price of ₹1.99 lakh to ₹2.10 lakh. The battery's size and chemistry decide the real figure, so it should appear as a separate line in the written quote. **How much does an off-grid solar system cost?** Verde Solaire's May 2025 post put a 3 kW off-grid system with batteries at ₹2.5 lakh to ₹3.2 lakh, and its June 2025 explainer put a 5 kW off-grid system with batteries at ₹3.5 lakh to ₹4.5 lakh. Neither carries any subsidy. **Do I need a battery if I live in Noida or Delhi?** Usually not. Verde Solaire's own advice is that supply in Delhi, Noida, Ghaziabad and Varanasi is mostly stable, so an on-grid system with net metering and the subsidy comes first, and batteries are added only where power cuts are frequent. Keep a note of cuts for one summer month before deciding. **How big a battery do I need for backup?** Size it for the essential loads only. Lights, fans, a router and a fridge come to roughly 400 W; four hours of that is 1.6 kWh, which needs about 3 kWh of lead-acid storage because those batteries are sized to use about half their capacity. One 1.5 kW air conditioner on the backup circuit would need several times that. **Can I add a battery to my on-grid solar system later?** Yes, but the on-grid inverter usually has to be replaced by a hybrid inverter, and the electricity board's net-metering approval must name the new model. It is cheaper to decide before the first installation than to convert afterwards. --- # 10 kW solar system: price, subsidy, savings Source: https://www.verdesolaire.com/pricing/10-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose 10 kW only when your home has substantial daytime use and roughly 1,000 to 1,167 square feet of shadow-free roof. A roof survey is essential at this size, so Verde Solaire prices it individually rather than from a standard list. The subsidy is fixed at ₹1,08,000 in Uttar Pradesh and ₹1,56,000 in Delhi. Your final figure is the survey-based quote, less that subsidy: quoted per site in Noida and quoted per site in Delhi. ## Why 10 kW is quoted per site Verde Solaire published prices for 1, 2, 3 and 5 kW in July 2025 and none for 10 kW. A 10 kW array is 19 panels of 540 Wp, and on most Delhi NCR terraces that means an elevated structure so the floor stays usable, longer DC cable runs, a larger inverter and sometimes a load change with the electricity board. Those items move the price more than the panels do, so the company surveys the roof first and then writes the quote. The quote should still read like the published ranges for smaller systems: panels, inverter, structure, net metering, installation and warranty in one number, GST at about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%) shown separately, and the make, model and wattage of every component named so you can check the modules against the ALMM List-II. Read [what an all-inclusive quote should contain](/pricing) before comparing two quotes. ## The subsidy is the same as on 3 kW The central subsidy under PM Surya Ghar: Muft Bijli Yojana is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and stops at ₹78,000. Nothing is paid on the seven kilowatts above that. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under its Solar Energy Policy 2022. Delhi adds ₹26,000 per kW, capped at up to ₹78,000. The combined subsidy on 10 kW is ₹1,08,000 in Uttar Pradesh or ₹1,56,000 in Delhi, the same rupee amount each state's own 3 kW system receives, against a much higher price. Three conditions apply at any size. On a subsidised system both the modules and the cells must be made in India, and the cells must be on the ALMM List-II for systems commissioned from 1 June 2026 ([what that list is](/learn/almm-list-ii-explained)). The installer must be a registered vendor; Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. And the scheme's official end date is 31 March 2027. ## How many units a 10 kW system generates On the planning yield from Verde Solaire's savings pages, 1,500 units per kW a year in Noida and 1,450 in Delhi, less a 10% derate for dust and the monsoon, a 10 kW system produces about 13,500 units a year in Noida and 13,050 in Delhi. That is about 1125 units a month and about 1088 units a month, or roughly 36 to 37 units a day averaged across the year. Greater Noida, Ghaziabad and Varanasi use the Noida figure on this site. The daily number is an average, not a promise: April to June run well above it, the monsoon and the December fog below. If a quote promises a higher monthly figure, ask which yield and which derate it assumes. ## Who a 10 kW system suits The published sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW, which only says that anyone above 300 units a month needs more than 3 kW. Where 10 kW starts to make sense is a connection using around 1,000 units a month averaged over the year, because that is roughly what it generates. A system sized far above annual consumption earns only the settlement rate on the excess; in Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. Average twelve months of bills before you decide; summer alone will oversize the system. Three kinds of buyer end up here: - **Large independent houses** with several air conditioners, a lift or a pump, and bills of four figures in units. Verde Solaire's published 10 kW homes are in Greater Kailash, Janakpuri and Chattarpur in Delhi, and in Greater Noida. - **Builder floors with one high-load connection**, where the owner holds the roof right for the whole terrace. Roof area is usually the constraint; read [solar on builder floors and shared roofs](/learn/solar-on-builder-floors-and-shared-roofs) first. - **Small businesses on a house-sized roof**: a clinic, a shop with cold storage or a guest house. The residential subsidy does not apply to a commercial connection, but daytime load matches solar output well; the [commercial payback tool](/tools/commercial-payback) is built for them. ## Net metering at 10 kW: the last size in the fast lane In Delhi, 10 kW is the upper edge of the simplest process. Under the DERC guidelines amended in July 2026, a domestic connection up to 10 kW has no application fee and a connection timeline of 10 days; above 10 kW it is 25 days. Since the 2024 amendment, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. The [Delhi net-metering guide](/net-metering/delhi) has the source and steps. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The transformer limit is what matters at 10 kW, so get the board's answer on capacity before you pay an advance. Noida city is on PVVNL and Greater Noida on NPCL, with different portals; the [Noida](/net-metering/noida) and [Greater Noida](/net-metering/greater-noida) pages walk through each. One bill item survives solar: the fixed charge, billed on sanctioned load. In Delhi it is ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month, so a 10 kW sanctioned load pays a month before surcharges; in Uttar Pradesh it is ₹110 per kW per month. Solar removes the energy charge, not the charges that come with the connection, which is why a "zero bill" claim does not hold up. The [bill calculator](/tools/electricity-bill-calculator) shows both for your units and load. ## Paying for it The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Check the current rate in your loan offer, as it moves with the repo rate. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans. Because the subsidy stays at ₹1,08,000 while the price scales with capacity, the loan covers a much larger share of a 10 kW system than of a 3 kW one, and the EMI is less likely to sit below the monthly saving. Put the quoted net price into the [EMI calculator](/tools/emi-calculator) and compare the result with the saving the [solar calculator](/tools/solar-calculator) shows for 10 kW in your city. ## 10 kW systems Verde Solaire has installed The company's published 10 kW work is residential and in Delhi NCR. In [Greater Kailash, New Delhi](/projects/greater-kailash-delhi-10-kw-bifacial), the system used 530 Wp Adani bifacial panels, and the owner, Jai Kumar Manghnani, wrote that "they installed a better bifacial solar panel of Adani without charging anything extra from us" and that the company helped with the central subsidy application. In [Janakpuri](/projects/janakpuri-delhi-10-kw), Navin Verma's system used Vikram panels and KSolare inverters on an elevated module mounting structure; he described the installation as very good quality and quick, and noted that the net meter was delayed on the electricity board's side. In Chattarpur, K. K. Sharma wrote that he "was highly impressed with their shadow analysis process". A 10 kW plant in [Greater Noida](/projects/greater-noida-10-kw), published in April 2023, was in the company's words installed in record time, with the net meter fitted quickly. ## The same 10 kW in each city ## Questions **How much does a 10 kW solar system cost in Delhi or Noida?** Verde Solaire quotes 10 kW per site after a roof survey; its July 2025 price list covers 1 to 5 kW only. The subsidy is fixed at ₹78,000 central plus ₹78,000 from Delhi (₹1.56 lakh in all) or ₹30,000 from Uttar Pradesh (₹1.08 lakh in all), and the net payable is the written quote less that amount. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **How many units does a 10 kW solar system generate per day?** About 1,125 units a month in Noida and about 1,088 in Delhi on Verde Solaire's planning yield with a 10% derate, which is roughly 36 to 37 units a day averaged over the year. April to June run higher; the monsoon and December fog run lower. **How much roof area is needed for 10 kW solar panels?** About 1,000 to 1,167 square feet of shadow-free roof for 19 panels of 540 Wp, scaled from Verde Solaire's published 300 to 350 square feet for 3 kW. On a terrace, an elevated structure keeps the floor usable underneath. **How long does net metering take for a 10 kW system in Delhi?** The DERC guidelines amended on 16 July 2026 set a 10-day connection timeline and no application fee for domestic systems up to 10 kW; above 10 kW the timeline is 25 days. Since the July 2024 amendment, no feasibility study is needed up to 10 kW on the same supply type. **Is 10 kW too big for my house?** If your bills average under about 600 units a month across twelve months, 5 kW covers most of it and has a published price. 10 kW suits a connection using around 1,000 units a month or more. Add twelve months of bills, divide by twelve, and check the result in the system size calculator. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # 2 kW solar system price with subsidy Source: https://www.verdesolaire.com/pricing/2-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A 2 kW system suits a smaller home using about 150 to 300 units a month. The published price is ₹1,35,000 to ₹1,50,000. After the central subsidy and state top-up, the estimated amount is ₹45,000 to ₹60,000 in Noida and ₹23,000 to ₹38,000 in Delhi. Expect about about 225 units a month in Noida or about 218 units a month in Delhi. See the figures for all five cities, what four panels can generate over a year and when 2 kW is a better fit than 1 kW or 3 kW. ## What the subsidy does to a 2 kW price The central subsidy is ₹30,000 per kW for the first 2 kW, so a 2 kW system receives ₹60,000. The third kilowatt adds ₹18,000, and the total stops at ₹78,000 for any system of 3 kW or more. Remember that ₹78,000 is a cap, not a rate, and the scheme's “300 units” describes what a roughly 3 kW system can generate—not free units credited to your bill. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy. A 2 kW system reaches that cap, so the state pays ₹30,000 in Noida, Greater Noida, Ghaziabad and Varanasi, and the combined subsidy of ₹90,000 covers about two-thirds of the published price. ## How many units a 2 kW solar panel system produces Verde Solaire's planning yield is 1,500 units per kW per year in Noida and 1,450 in Delhi. With a 10% derate for dust and monsoon, a 2 kW system produces about 225 units a month in Noida and the other Uttar Pradesh cities, and about 218 units a month in Delhi. Averaged over the year that is 7 to 8 units a day. April to June run higher, the monsoon months and December to January lower; the [monsoon and dust page](/learn/monsoon-and-dust-generation-ncr) shows the seasonal shape. Four panels make up the system. Recent Verde Solaire installations used modules of 530 to 545 watt-peak (Wp), and at 540 Wp a 2 kW array is four panels needing about 200 to 233 square feet of shadow-free roof, scaled from the published 300 to 350 square feet for 3 kW. Four panels in one row is a small footprint, which is why 2 kW is often the size a [builder floor with a shared roof](/learn/solar-on-builder-floors-and-shared-roofs) can accommodate. ## Who a 2 kW system suits The official sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. Take twelve months of bills, add up the units and divide by twelve; a summer bill on its own will oversize the system. If the average lands between 150 and 300 units, 2 kW is the right size. In practice that is a flat or a small floor with fans, lights, a refrigerator, a washing machine and one air conditioner run for a few hours on summer evenings. A house that runs two or more air conditioners through May and June usually averages above 300 units and should read the [3 kW](/pricing/3-kw) or [5 kW](/pricing/5-kw) page. A home under 150 units, or a roof with room for only two panels, is a [1 kW](/pricing/1-kw) case. Two points apply only in Delhi. The free-power subsidy is worked out on net units, that is import minus export, so a home using 300 units with 2 kW of solar is billed on about 80 net units, inside the lowest slab of the DERC schedule. And eligible residential consumers using up to 400 units a month are the stated audience of the zero-upfront scheme the Delhi Cabinet approved on 1 September 2026, which offers a 2 or 3 kW rooftop system at no cost. If that describes you, read [what is approved and what is notified](/subsidy/delhi-zero-upfront-scheme) before paying for a 2 kW system. The [system size calculator](/tools/system-size-calculator) takes your monthly units and sanctioned load and returns the size; [what size solar system do I need](/learn/what-size-solar-system-do-i-need) explains the reasoning behind it. ## The step from 2 kW to 3 kW The third kilowatt is the last one the subsidy pays for, so price it before settling on 2 kW. On the published list, moving from 2 kW to 3 kW adds to to the gross price. The central subsidy rises by ₹18,000, and in Delhi the state subsidy rises by another to reach its up to ₹78,000 cap, so the net cost of the third kilowatt works out at about to in Delhi and to in Noida, where the state cap is already reached at 2 kW. For that you get roughly 110 more units a month on the same planning basis. Above 3 kW neither government adds anything, which is why 3 kW, not 4 kW, is the usual upgrade. If your bills sit near the top of the 150 to 300 band, or you expect to add an air conditioner or an electric vehicle within a few years, 3 kW is usually the better buy. If they sit near the bottom, the extra kilowatt would mostly export rather than replace units you buy. In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost, rather than at your retail tariff. In that case 2 kW is enough. [3 kW vs 5 kW](/learn/3-kw-vs-5-kw) carries the same argument one step up. ## Net metering for a 2 kW system A 2 kW on-grid system needs a net meter and the electricity board's approval like any other size. In Delhi the Delhi Electricity Regulatory Commission (DERC) guidelines of July 2026 set a connection timeline of 10 days for systems up to 10 kW, with no application fee for domestic consumers, and since the 2024 amendment the DISCOM handles any load increase itself. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company), while Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited); the name on your bill decides which portal your application uses. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, files the application on the national portal, attends the inspection and follows the meter through to activation. The [net-metering guides](/net-metering) cover each board, and [installed but not activated](/learn/installed-but-not-activated) covers a meter that stalls after commissioning. ## Paying for a 2 kW system At ₹45,000 to ₹60,000 net, many 2 kW customers pay cash. The full price is paid first and the subsidy is credited to your bank account after commissioning, officially "within 30 days" of the claim; about 15 days on average; [who pays whom](/subsidy/who-pays-whom) sets out the sequence. On the calculator's assumptions the net price in Noida is recovered in about three to four years. If you would rather borrow, the PM Surya Ghar concessional loan is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. A loan of on those terms is an equated monthly instalment (EMI) of about a month, less than the energy charge a 2 kW system removes from a Noida bill. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans. The [EMI calculator](/tools/emi-calculator) takes any principal, rate and tenure, and the [solar loan page](/solar-loan) lists the paperwork. ## Equipment and compliance on a 2 kW system For a subsidised system, both the modules and the cells must be made in India, and since 1 June 2026 the cells must also appear on the Approved List of Models and Manufacturers (ALMM) List-II. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), shown as a separate line on the quote. Verde Solaire's 2 kW system in Varanasi used Adani 540 Wp panels with a KSolare inverter, and its published price posts carry 25-year performance warranties on all three panel types. Two searches around this size deserve a straight answer. A "2 kW solar inverter price" is not a separate purchase: the published range includes an on-grid inverter rated for the array, and the quote names it. A "2 kW solar battery price" belongs to a different system: an on-grid 2 kW system has no battery and stops during a power cut, so a home that wants backup needs a [hybrid system](/solutions/off-grid-hybrid), which is quoted per site because the battery drives the cost. [Panels](/equipment/solar-panels), [inverters](/equipment/solar-inverters) and [batteries](/equipment/solar-batteries) explain what the names on a quote mean. ## What a 2 kW customer said Rakhi Sharma had a 2 kW rooftop system installed under the subsidy scheme and wrote that "The staff of Verde Solaire was very cooperative and helpful. Their installation was top class and was as per their promise." More reviews, sorted by city, are on the [reviews page](/reviews), and the Varanasi installation pictured above is written up under [projects](/projects/varanasi-2-kw-pm-surya-ghar). ## The same 2 kW in each city The city pages add the electricity board, the tariff that decides the saving, and local installation notes. ## Questions **How much does a 2 kW solar system cost with subsidy?** On Verde Solaire's published July 2025 range of ₹1,35,000 to ₹1,50,000, a 2 kW system nets to ₹45,000 to ₹60,000 in Noida, Greater Noida, Ghaziabad and Varanasi after the ₹60,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy, and to ₹23,000 to ₹38,000 in Delhi after ₹60,000 central and ₹52,000 Delhi subsidy. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **What is the 2 kW solar panel price in Noida?** ₹1,35,000 to ₹1,50,000 before subsidy and ₹45,000 to ₹60,000 after the ₹60,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy. Net metering for Noida city goes through PVVNL; Greater Noida and Greater Noida West go through NPCL. **How many units does a 2 kW solar panel produce per day?** About 7 to 8 units a day averaged over the year: about 225 units a month in Noida and 218 in Delhi on Verde Solaire's planning yield with a 10% derate for dust and monsoon. April to June run higher; the monsoon months and December to January run lower. **How much subsidy do I get on a 2 kW solar system in Uttar Pradesh?** ₹90,000 in total: ₹60,000 from the central PM Surya Ghar scheme, which pays ₹30,000 per kW for the first 2 kW, plus ₹30,000 from Uttar Pradesh, which pays ₹15,000 per kW capped at ₹30,000. Both are credited to your bank account after commissioning. **How many solar panels are in a 2 kW system and how much roof do they need?** Four panels of 540 Wp, needing about 200 to 233 square feet of shadow-free roof. Verde Solaire's 2 kW installation in Varanasi used Adani 540 Wp panels with a KSolare inverter. **Is a 2 kW solar system enough for a home with an AC?** It depends on your units, not the appliance list. The official sizing guide puts 150 to 300 units a month at 2 to 3 kW. A home with one air conditioner used for a few hours a day usually stays in that band; two or more run through summer usually push the average above 300 units, where 3 kW fits better. **Should I install 2 kW or 3 kW?** Average your last twelve bills. If the average is close to what 2 kW generates, about 225 units, 2 kW covers you. Near 300 units or above, take 3 kW: the third kilowatt still earns ₹18,000 more central subsidy, and up to ₹26,000 more state subsidy in Delhi, costs about ₹16,000 to ₹46,000 net depending on the city, and adds about 110 units a month. Above 3 kW the subsidy stops. --- # 3 kW or 5 kW solar: which should you buy? Source: https://www.verdesolaire.com/learn/3-kw-vs-5-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Buy 3 kW if the average of your last twelve bills is between 200 and 400 units a month, and 5 kW if it is between 400 and 600. On Verde Solaire's published July 2025 prices a 3 kW system costs ₹1,99,000 to ₹2,10,000 and nets to ₹91,000 to ₹1,02,000 after subsidy; a 5 kW system costs ₹3,25,000 to ₹3,50,000 and nets to ₹2,17,000 to ₹2,42,000. The subsidy on both sizes is the same within each state — ₹1,08,000 in Noida and ₹1,56,000 in Delhi — so the two extra kilowatts are bought at full price and only pay off if you use what they generate. That is the short answer. The rest of this guide puts the two systems side by side, explains why the subsidy stops at 3 kW, and works through the four things that decide between them: units, air conditioners, roof and sanctioned load. In Delhi there is a fifth, the per-unit incentive, and it favours 3 kW. ## Side by side | | 3 kW | 5 kW | |---|---|---| | Published price, July 2025 | ₹1,99,000 to ₹2,10,000 | ₹3,25,000 to ₹3,50,000 | | Central subsidy | ₹78,000 | ₹78,000 | | State subsidy, Uttar Pradesh | ₹30,000 | ₹30,000 | | State subsidy, Delhi | ₹78,000 | ₹78,000 | | Net payable in Noida | ₹91,000 to ₹1,02,000 | ₹2,17,000 to ₹2,42,000 | | Net payable in Delhi | ₹43,000 to ₹54,000 | ₹1,69,000 to ₹1,94,000 | | Generation in Noida | about 338 units a month | about 563 units a month | | Generation in Delhi | about 326 units a month | about 544 units a month | | Panels of 540 Wp | 6 | 10 | | Shadow-free roof | 300 to 350 square feet | about 500 to 580 square feet | ## Why the subsidy is the same on both The PM Surya Ghar: Muft Bijli Yojana pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and nothing after that, so the central subsidy stops at ₹78,000. Delhi's top-up of ₹26,000 per kW is capped at up to ₹78,000, and Uttar Pradesh's ₹15,000 per kW at ₹30,000 per consumer, on top of the central subsidy. Every cap is reached by 3 kW. The arithmetic follows from that. The published price of 5 kW is to more than 3 kW in every city, and none of the difference is subsidised. In Uttar Pradesh, the first three kilowatts cost about to each after subsidy and the fourth and fifth about to each; the subsidy covers roughly half the price of 3 kW and roughly a third of 5 kW. In Delhi, the larger state top-up covers more of the price: the first three kilowatts cost about to each after subsidy, and the subsidy covers roughly three-quarters of the price of 3 kW and roughly half of 5 kW. That is why 3 kW is the size most homes in Delhi NCR settle on, and why 5 kW has to justify itself on consumption alone. ## Who should buy 3 kW - **Units.** A twelve-month average of 200 to 400 units. The scheme's own guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. A 3 kW system generates about 338 units a month in Noida, so a 300-unit home is covered and a 400-unit home mostly so. - **Air conditioners.** One or two, run at night through summer. On the estimate in the [summer AC bill guide](/learn/cut-your-summer-ac-bill-delhi-noida), 3 kW covers the base load and one air conditioner run through the night, or two run for fewer hours. - **Roof.** 300 to 350 square feet without midday shade, the figure the company publishes for 3 kW: six panels of about 540 Wp, the module size on recent Noida and Delhi installations. A [builder floor with a shared roof](/learn/solar-on-builder-floors-and-shared-roofs) often has this much and no more. - **Sanctioned load.** A 3 kW system sits inside a connection sanctioned at 3 kW or more, so nothing on the bill changes. ## Who should buy 5 kW - **Units.** A twelve-month average of 400 to 600 units. 5 kW generates about 563 units a month in Noida and about 544 units a month in Delhi; a 3 kW system on a 550-unit home would leave about 200 units a month on the bill, at the dearest slab. - **Air conditioners.** Two or three run through the night from April to September, which is the usual reason a home crosses 400 units. - **Roof.** About 500 to 580 square feet without shade, scaled from the published 3 kW figure, for ten panels of 540 Wp. - **Sanctioned load.** A connection sanctioned below 5 kW is not a barrier, but the fixed charge rises with the load; see below. - **Budget.** The extra to is unsubsidised. On the PM Surya Ghar loan at 5.75% over 10 years, the [EMI calculator](/tools/emi-calculator) shows what it adds to the monthly instalment. Do not size on June. A home that reads 250 units in winter and 800 in June averages perhaps 450, and the [size calculator](/tools/system-size-calculator) works from that average. A 5 kW system bought for the summer peak spends the winter exporting credit rather than saving money, and in Delhi credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. ## Delhi's per-unit incentive favours 3 kW On this site's generation estimate a 3 kW system earns a year and a 5 kW system : two-thirds more generation for about a tenth more incentive. Over the five years that is against . It does not reverse the decision for a 550-unit home, whose bill saving is far larger than the incentive, but for a home on the 400-unit boundary it tips the balance towards 3 kW. The incentive and the state subsidy are claimed on solar.delhi.gov.in; the [Delhi subsidy page](/subsidy/delhi) explains how. In Delhi, eligible residential consumers using up to 400 units a month should also read about the Cabinet's decision of 1 September 2026, which offers a 2 or 3 kW rooftop system at no cost; the detailed rules have not been notified yet. It covers 3 kW, not 5. ## Sanctioned load and the fixed charge Both sizes go through the electricity board's feasibility check, and the sanctioned load on your bill is what it checks against. In Delhi, under the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade, so a 5 kW system on a 3 kW connection is not refused. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits, which is where a 5 kW request on a crowded transformer may be trimmed. What a higher load changes is the fixed charge, billed per kW of sanctioned load every month whatever the system generates. Delhi's schedule is ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month: a month for a 3 kW load and for 5 kW, before the regulatory surcharge and the monthly fuel surcharge. Uttar Pradesh charges ₹110 per kW per month, so against . Small beside the energy charge, but they are why no on-grid system brings a bill to zero. ## Sizes in between, and above Verde Solaire publishes prices for 1, 2, 3 and 5 kW. A 4 kW system can be installed and is quoted per site; it collects the same subsidy as 3 kW. Whatever the size, generation is an annual average: April to June run above it, and the monsoon and December fog below, as the [seasonal generation guide](/learn/monsoon-and-dust-generation-ncr) shows. The [3 kW page](/pricing/3-kw) and the [5 kW page](/pricing/5-kw) carry each system's full figures. ## Questions **Is a 3 kW or a 5 kW solar system better for a home?** Go by the average of your last twelve electricity bills. 3 kW suits 200 to 400 units a month and 5 kW suits 400 to 600. Within each state the subsidy is the same on both sizes: ₹1,08,000 in Uttar Pradesh and ₹1,56,000 in Delhi, so the extra 2 kW is paid for in full and only pays off if you use what it generates. **Is the subsidy on a 5 kW solar system more than on 3 kW?** No. The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, capped at ₹78,000. Uttar Pradesh's top-up is capped at ₹30,000 and Delhi's at ₹78,000. Every cap is reached at 3 kW, so within each state 3 kW and 5 kW receive the same total: ₹1,08,000 in Uttar Pradesh and ₹1,56,000 in Delhi. **How much more does 5 kW cost than 3 kW after subsidy?** On Verde Solaire's July 2025 price list, 3 kW nets to ₹91,000 to ₹1,02,000 in Noida (₹43,000 to ₹54,000 in Delhi) and 5 kW to ₹2,17,000 to ₹2,42,000 in Noida (₹1,69,000 to ₹1,94,000 in Delhi), so the extra 2 kW costs ₹1,26,000 to ₹1,40,000 in either state, none of it subsidised. That is about ₹63,000 to ₹70,000 per extra kW against about ₹30,000 to ₹34,000 per kW for the first three in Noida, or about ₹14,000 to ₹18,000 per kW for the first three in Delhi. **How many units do 3 kW and 5 kW solar systems generate a month?** On the published planning yield less a 10% derate for dust and monsoon, 3 kW generates about 338 units a month in Noida and 326 in Delhi; 5 kW about 563 in Noida and 544 in Delhi, averaged over the year. Summer months run above the average and the monsoon and winter fog below it. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Do I need to increase my sanctioned load for a 5 kW solar system?** In Delhi, under the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type and the DISCOM handles any load increase as part of the net-metering application. In Uttar Pradesh the DISCOM allows capacity within transformer limits. The fixed charge on the bill is per kW of sanctioned load, so it rises with the load: ₹150 to ₹250 a month in Delhi and ₹330 to ₹550 in Uttar Pradesh for 3 kW and 5 kW. **How much roof do 3 kW and 5 kW need?** Verde Solaire publishes 300 to 350 square feet of shadow-free roof for 3 kW, which is six panels of about 540 Wp. Scaled from that, 5 kW needs about 500 to 580 square feet for ten panels. A raised structure keeps the terrace usable underneath. --- # 3 kW solar panel price in Delhi 2026 Source: https://www.verdesolaire.com/pricing/delhi/3-kw Updated: Sun Sep 20 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose 3 kW for a Delhi home using about 300 to 400 units a month. It is the size that receives the full central and Delhi state subsidy. For every Delhi capacity, see [rooftop solar prices in Delhi](/pricing/delhi). To compare 3 kW across cities, see [the 3 kW page](/pricing/3-kw). ## The price, and the two subsidies on top of it | System | Published price | Central subsidy | State subsidy | Net payable | |---|---|---|---|---| | 1 kW | ₹70,000–₹80,000 | ₹30,000 | ₹26,000 | ₹14,000–₹24,000 | | 2 kW | ₹1,35,000–₹1,50,000 | ₹60,000 | ₹52,000 | ₹23,000–₹38,000 | | 3 kW | ₹1,99,000–₹2,10,000 | ₹78,000 | ₹78,000 | ₹43,000–₹54,000 | | 5 kW | ₹3,25,000–₹3,50,000 | ₹78,000 | ₹78,000 | ₹1,69,000–₹1,94,000 | | 10 kW | on request | ₹78,000 | ₹78,000 | quote-based | The published range covers panels, inverter, mounting structure, net metering, installation and warranty. The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, and stops at ₹78,000. Delhi adds ₹26,000 per kW, capped at up to ₹78,000. The two are cumulative: the state amount is paid on top of the central one, not instead of it. The table shows 2 kW and 5 kW alongside 3 kW for a reason. Below 3 kW you leave part of both subsidies unclaimed. Above 3 kW every extra kilowatt is paid in full, because neither subsidy grows past the third. That is why 3 kW is the size at which the subsidy covers the largest share of the price. If your consumption is well above 400 units a month, [3 kW against 5 kW](/learn/3-kw-vs-5-kw) works through the arithmetic and the [5 kW Delhi page](/pricing/delhi/5-kw) has the figures. ## The Delhi detail most quotes leave out: the per-unit incentive ## The roof Verde Solaire's published figure for 3 kW is 300 to 350 square feet of shadow-free roof. On the 540 Wp modules this site uses for planning that is six panels, usually on an elevated structure so the roof underneath stays usable. Shadows from tanks, a lift room or a neighbour's upper floor matter most in winter, when the sun sits low, so the survey is a shadow analysis rather than a tape measure. One Chattarpur customer, K. K. Sharma, wrote that he "was highly impressed with their shadow analysis process". Verde Solaire offers a free site evaluation and no-obligation proposal. On a builder floor the roof right decides whether you can install at all. [Solar on builder floors and shared roofs](/learn/solar-on-builder-floors-and-shared-roofs) covers the agreement you need from the other floors before anyone drills. ## The panels A subsidised system must use panels where both the modules and the cells must be made in India, and since 1 June 2026 the cells must also appear on ALMM List-II, the approved list of cell makers. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), and the quote should show it as its own line. Verde Solaire's recent Delhi homes used Adani and Vikram modules of 530 to 545 Wp with KSolare inverters, including a [10 kW bifacial system in Greater Kailash](/projects/greater-kailash-delhi-10-kw-bifacial) and a [10 kW system in Janakpuri](/projects/janakpuri-delhi-10-kw). The July 2025 price posts state 25-year performance warranties on all three panel types. Every written quote names the make, model and wattage; [ALMM List-II explained](/learn/almm-list-ii-explained) shows how to check them. ## Monthly units On the planning yield this site uses for Delhi, 1,450 units per kW a year less a 10% allowance for dust and monsoon, a 3 kW system generates about 326 units a month. Verde Solaire's own June 2025 post for this size gave 360 to 400 units a month; the difference is the derate, applied so the estimate errs low. Generation is highest from March to June and lowest in the monsoon and in December and January, so the annual figure is the one to plan on; [monsoon and dust in Delhi NCR](/learn/monsoon-and-dust-generation-ncr) has the month-by-month pattern. The official sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. In practice a Delhi home averaging 250 to 400 units a month, with two to four air conditioners in summer, is the household for which 3 kW is the right answer, and the average of twelve bills, not the July bill, is the number to size from. ## Sanctioned load Your electricity bill shows a sanctioned load in kW, and two things depend on it. First, the fixed charge: Delhi bills ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month of sanctioned load, so a 3 kW connection sits in the second band. Second, the rooftop capacity the electricity board will connect. Since the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. If your connection is sanctioned at 2 kW and you want 3 kW of solar, the load increase is handled inside the same application rather than as a separate hurdle. ## The electricity board process Delhi has three distribution licensees, BSES Rajdhani, BSES Yamuna and Tata Power-DDL, plus the NDMC area, and the name printed on your bill tells you which one you deal with. Under the DERC guidelines of July 2026, PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. There is no application fee for domestic systems up to 10 kW, and the guideline timeline for the connection is 10 days. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. It files the portal application, attends the inspection and follows the meter through to activation. A Janakpuri homeowner, Navin Verma, wrote that "The installation of solar plant by Verde was of very good quality and their installation of solar system was also very quick", and added that the net-metering step was then delayed on the electricity board's side. A Greater Kailash customer, Jai Kumar Manghnani, wrote that the company "helped in applying for central subsidy for solar power plant". The [Delhi net-metering guide](/net-metering/delhi) sets out each stage with the board's own timelines, with separate pages for [BSES Rajdhani](/net-metering/board/bses-rajdhani), [BSES Yamuna](/net-metering/board/bses-yamuna) and [Tata Power-DDL](/net-metering/board/tata-power-ddl). Once connected, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. ## What the bill looks like afterwards Delhi's domestic energy charges are still the DERC schedule for FY 2021-22, the last tariff order published: ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit. On top come the fixed charge, a regulatory surcharge of 8% and a fuel surcharge that changes month to month. A 3 kW system generating about 326 units a month removes most of the energy charge of a home using 300 to 400 units; the fixed charge stays. Delhi's free-power subsidy is 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in. With solar it is worked out on net units, that is import minus export, so a home that imports 350 units and exports 200 has the subsidy worked out on 150 net units, inside the free band. The [Delhi tariff explainer](/learn/delhi-electricity-tariff-explained) walks through the slabs, and the [bill calculator](/tools/electricity-bill-calculator) does the arithmetic for your own units. ## The zero-upfront scheme, and whether to wait On 1 September 2026 the Delhi Cabinet approved a second amendment to the solar policy offering a 2 or 3 kW rooftop system at no cost to eligible residential consumers using up to 400 units a month. If your average is above 400 units, or you want more than 3 kW, the paid route on this page is the one that applies to you. Under 400 units, the scheme exists in a Cabinet decision and not yet at the portal. [What is approved and what is notified](/subsidy/delhi-zero-upfront-scheme) tracks the scheme as the rules appear. ## Paying for it ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Is the Delhi solar subsidy ₹78,000?** There are two ₹78,000 amounts on a 3 kW Delhi system: the central PM Surya Ghar cap and the Delhi state subsidy. The Delhi Cabinet approved a zero-upfront route on 1 September 2026 for homes averaging 400 units a month or less, but its operating rules have not yet been announced. **How much roof does a 3 kW system need in Delhi?** Verde Solaire's published figure is 300 to 350 square feet of shadow-free roof, which is about six panels of 540 Wp on an elevated structure. **How many units does 3 kW generate per month in Delhi?** About 326 units a month on the planning yield this site uses for Delhi (1,450 units per kW a year less a 10% allowance for dust and monsoon). Verde Solaire's June 2025 post for this size gave 360 to 400 units a month. Summer months run higher and the monsoon and December to January lower. **How long does net metering take in Delhi for 3 kW?** The DERC guidelines of 16 July 2026 set a 10-day timeline for connections up to 10 kW with no application fee for domestic consumers. PM Surya Ghar applicants apply through the national portal; the electricity board inspects and installs the meter. **Should I wait for Delhi's free 3 kW solar scheme?** If your home averages more than 400 units a month, or you want more than 3 kW, the scheme does not cover you and the paid route applies. If you are under 400 units, the scheme was Cabinet-approved on 1 September 2026, but the detailed rules have not yet been announced and registration has not opened. **What loan is available for a 3 kW system in Delhi?** The PM Surya Ghar concessional loan is collateral-free from nationalised banks at the repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. The scheme's end date is 31 March 2027. --- # 3 kW solar panel price in Noida 2026 Source: https://www.verdesolaire.com/pricing/noida/3-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose 3 kW for a home using roughly 300 to 400 units a month, with 300 to 350 square feet of shadow-free roof. The published Noida price is ₹1,99,000 to ₹2,10,000. After the central and Uttar Pradesh subsidy, the estimated amount is ₹91,000 to ₹1,02,000. Together, the two subsidies come to ₹1,08,000. For every Noida size, see the [Noida price page](/pricing/noida). To compare 3 kW across the cities Verde Solaire serves, see the [3 kW page](/pricing/3-kw). ## What the published price includes The range of ₹1,99,000 to ₹2,10,000 covers panels, inverter, mounting structure, net metering, installation and warranty. It is a range rather than a single figure because roofs differ: a raised structure that keeps the terrace usable underneath takes more steel than a low-tilt frame. The written quote after a site survey is the price. For planning we assume 540 Wp modules, which makes a 3 kW system six panels; the quote names the actual module. For a subsidised system, both the modules and the cells must be made in India, and from 1 June 2026 the cells must also appear on ALMM List-II, the approved list of cell makers. Verde Solaire's published home installations in Delhi NCR have used Adani and Vikram modules with KSolare inverters, and the July 2025 price posts state 25-year performance warranties on all three panel types. Ask for the inverter and workmanship warranty in writing as well. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%); a quote or an online estimate built on the older rate is out of date. ## The subsidy split for 3 kW in Noida The central PM Surya Ghar: Muft Bijli Yojana subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, which is how a 3 kW system reaches the cap of ₹78,000. The formula behind those figures is 60% of the benchmark cost for the first 2 kW and 40% for the part between 2 and 3 kW, capped at 3 kW. Uttar Pradesh adds ₹15,000 per kW under the state's Solar Energy Policy 2022, capped at ₹30,000 per consumer, on top of the central subsidy. News reports in September 2026 describe combined central-plus-state totals of ₹45,000, ₹90,000 and ₹1.08 lakh for 1, 2 and 3 kW, paid by direct bank transfer 30–45 days after verification. | System | Central | State | Total | |---|---|---|---| | 1 kW | ₹30,000 | ₹15,000 | ₹45,000 | | 2 kW | ₹60,000 | ₹30,000 | ₹90,000 | | 3 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | | 5 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | | 10 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | Both amounts go to you, not to the installer, after the board has inspected the system and the commissioning certificate is on the portal. Officially the central subsidy is paid "within 30 days" of the claim; about 15 days on average. Until it lands, you or your lender carry the full published price. ## Two things about this size that trip people up in Noida ### The state cap is reached at 2 kW Because the Uttar Pradesh subsidy is ₹15,000 per kW with a ceiling of ₹30,000 per consumer, on top of the central subsidy, the ceiling is hit at 2 kW. The third kilowatt brings in ₹18,000 from the centre and nothing from the state. Compare the published prices for 2 kW, ₹1,35,000 to ₹1,50,000, and for 3 kW, ₹1,99,000 to ₹2,10,000: most of that step is paid by you. Size to twelve months of bills, not to the subsidy table. The published sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW, and Verde Solaire's own post pitches 3 kW at homes using 200 to 400 units a month with two to four air conditioners. ### Noida city is PVVNL, not NPCL Noida city's electricity distributor is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). NPCL (Noida Power Company Limited) serves Greater Noida and Greater Noida West. They are different companies, and the feasibility approval, the inspection and the net meter all come from whichever one prints your bill. The distinction matters because your application must go to the board that holds your connection. Verde Solaire's head office is in Sector 47, Noida, inside the city that PVVNL serves. ## Roof and panels: what 3 kW needs Verde Solaire's published figure is 300 to 350 square feet of shadow-free roof for 3 kW. Shadow-free is the part that matters. Six panels are usually wired as one string into the inverter, so a water tank, a lift room or a neighbour's parapet that shades one panel in the afternoon pulls down all six for that hour. On an independent house the roof is yours. On a builder floor the roof right in the sale deed, the other floors' consent and the sanctioned load on your own connection decide whether 3 kW is possible, so bring those papers to the survey. ## Units a month, and what the electricity bill does Verde Solaire's published planning figure for 3 kW in Noida is 360 to 400 units a month. The calculator at the foot of this page is more cautious: it removes 10% from the published yield for dust and monsoon, an editorial assumption, and shows about 338 units a month. Budget on the lower number. Uttar Pradesh urban domestic tariffs for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, plus a fixed charge of ₹110 per kW per month. A home using 350 units a month sits in the third slab. A 3 kW system producing a little under that removes most of the energy charge; what remains is the fixed charge on your sanctioned load plus whatever the system did not cover in a cloudy month. The bill after solar is small, not nil, and the fixed charge is billed whether or not the sun shines. ## Sanctioned load and the connection Your sanctioned load is printed on the bill in kW. On the regulatory side, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The connection feeds two separate decisions: the board's feasibility check, which looks at your sanctioned load and the local transformer, and the fixed charge, billed per kW of sanctioned load at ₹110 per kW per month. If your sanctioned load is below 3 kW, raise it with the engineer at the survey. Surplus units exported in a sunny month are credited against later consumption. For what is left over, UPERC set a compensation rate of the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). ## The PVVNL process, step by step 1. Register on pmsuryaghar.gov.in with Uttar Pradesh, PVVNL, your consumer number and mobile number. 2. Apply for rooftop solar and choose the vendor: the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. 3. Wait for PVVNL's feasibility approval. 4. Installation. 5. Submit the plant details and apply for the net meter. 6. PVVNL inspects the installation. 7. The commissioning certificate is issued on the portal. 8. Submit bank details and a cancelled cheque. 9. The subsidy is credited: officially "within 30 days" of the claim; about 15 days on average; reported as 30–45 days after verification in practice. Verde Solaire files the application, attends the inspection and follows the net meter through to activation. Brij Lal Bhardwaj, who installed 4 kW at his Sector 25 home, wrote that the team handled the paperwork and the liaison with the electricity board for the net meter, and had his subsidy processed. Mr. L. R. Singh, on a 6 kW system, wrote: "I was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". The stage-by-stage timeline is on the [Noida net-metering page](/net-metering/noida). ## Paying for it: loan or cash The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the application with you. Because the subsidy arrives after commissioning, the loan bridges the gap between the published price and the net figure, then spreads the net cost over the tenure. ## 3 kW or 5 kW in Noida? At 5 kW the subsidy is the same rupee total, ₹78,000 central plus ₹30,000 per consumer, on top of the central subsidy state, against a published price of ₹3,25,000 to ₹3,50,000, so the net cost of ₹2,17,000 to ₹2,42,000 is higher per kilowatt. Scaling the published 3 kW figure, it needs roughly 500 to 580 square feet of roof, and a sanctioned load to match. If twelve months of bills average above about 400 units, read the [5 kW page for Noida](/pricing/noida/5-kw) first; below that, 3 kW lets the subsidy do the most work. ## Keep your Noida 3 kW quote comparable Compare a complete system, not a headline price. Your quote should show the branded panel and inverter models, mounting structure, installation work, net-metering support and the state and central subsidy separately. Noida city is on PVVNL, not NPCL; the name on your electricity bill confirms the portal and process for your application. ## Questions **How much does a 3 kW solar system cost in Noida with subsidy?** Verde Solaire's published July 2025 range for 3 kW is ₹1,99,000 to ₹2,10,000 including panels, inverter, structure, net metering and installation. After the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy, the net cost is ₹91,000 to ₹1,02,000. The written quote after a site survey is the actual price. **What is the total subsidy on a 3 kW solar system in Noida?** ₹1,08,000: ₹78,000 from PM Surya Ghar (₹30,000 per kW for the first 2 kW plus ₹18,000 for the third) and ₹30,000 from the Uttar Pradesh state subsidy, which is ₹15,000 per kW capped at ₹30,000. Both are paid into your bank account after the electricity board inspects the system. **Is the UP subsidy ₹30,000 for 3 kW or only for 2 kW?** It is ₹15,000 per kW capped at ₹30,000 per consumer, so a 2 kW and a 3 kW system get the same ₹30,000. The third kilowatt earns only the ₹18,000 central subsidy. Size the system to your consumption, not to the subsidy. **Is Noida under PVVNL or NPCL for net metering?** Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), a UPPCL company. NPCL (Noida Power Company Limited) serves Greater Noida and Greater Noida West. Check the name printed on your electricity bill before choosing a portal. **How many units does a 3 kW system generate per month in Noida?** Verde Solaire's published planning figure is 360 to 400 units a month. The calculator on this page takes 10% off the published yield for dust and monsoon and shows about 338 units a month, which is the safer number to budget with. **How much roof space does 3 kW need in Noida?** About 300 to 350 square feet of shadow-free roof, which is six panels of around 540 Wp. Shade from a water tank or a neighbouring parapet matters more than the area, so the engineer checks shadows at the free site survey. **Can I take a loan for a 3 kW solar system in Noida?** Yes. The PM Surya Ghar concessional loan is collateral-free from nationalised banks at the repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs and helps with the application. --- # 3 kW solar system: price, subsidy, savings Source: https://www.verdesolaire.com/pricing/3-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A 3 kW system is a practical fit for a home using around 300 to 400 units a month. It needs about six panels and 300 to 350 square feet of shadow-free roof. Expect about about 338 units a month in Noida or about 326 units a month in Delhi on the planning assumptions used here. 3 kW is the size Verde Solaire's price posts recommend for a home with two to four air conditioners, and the largest system that collects the full central subsidy, so the subsidy covers roughly half the price. The rest of this page covers panels and roof area, the units, and what the bill does in Delhi and in Uttar Pradesh. ## Why 3 kW is the subsidy sweet spot PM Surya Ghar: Muft Bijli Yojana pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and nothing above that, so the central subsidy stops at ₹78,000. A 5 kW system collects the same amount against a much higher price, so the net cost per kW rises past 3 kW. ## What you get for the money Verde Solaire's July 2025 price posts describe the same 3 kW package in Delhi, Noida and Ghaziabad: panels, inverter, mounting structure, net metering, installation and warranty, with 25-year performance warranties on all three panel types. Modules on the company's recent Noida and Delhi installations were 530 to 545 Wp, so a 3 kW system today is six panels of about 540 Wp on a 3 kW on-grid inverter, needing the 300 to 350 square feet of shadow-free roof the company publishes for this capacity. The written quote states which structure is priced, since an elevated frame like the one in the photo uses more steel than a flush one. The published price is for an on-grid system without a battery; hybrid systems are quoted per site, and [rooftop solar or inverter battery](/learn/rooftop-solar-or-inverter-battery) explains when one is worth it. Two compliance points decide whether the subsidy is paid at all: for a subsidised system, both the modules and the cells must be made in India, and from 1 June 2026 the cells must also appear on ALMM List-II. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), shown as its own line on the quote. Ask for the panel and inverter make and model in writing and check them on [panels, inverters and batteries](/equipment). ## How many units a 3 kW system generates Verde Solaire's published planning figure for Delhi, Noida and Ghaziabad is 360 to 400 units a month. This site's calculator is more conservative: it removes 10% from the company's planning yield for dust and the monsoon and arrives at about 338 units a month in Noida and about 326 units a month in Delhi, roughly 11 to 13 units a day across the year. The annual figure matters more than any month. April to June produce well above the average; the monsoon loses output to cloud, and December and January to fog and short days. Net metering evens it out: in Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost; in Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. [Monsoon and dust generation in NCR](/learn/monsoon-and-dust-generation-ncr) has the month-by-month shape. Generation varies with the roof, shade, orientation and season. The figures here use one published planning yield and show the assumptions behind the estimate, so you can compare it with your own roof survey. ## Who this size suits, and who should size up or down The company's published guide fits 3 kW to a home with two to four air conditioners using 200 to 400 units a month, and the PM Surya Ghar guide is similar: 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. A household averaging around 300 units a month is fully covered, one around 400 units largely, and one that regularly bills 450 units or more should look at 5 kW. Use the average of twelve bills, not the summer peak; with net metering, the May surplus pays for the December shortfall. Two other limits apply: the system cannot exceed the sanctioned load on your connection without a load increase, and midday shade from a water tank or a neighbour's wall costs more than a smaller system would. The [system-size calculator](/tools/system-size-calculator) turns your units or bill amount into a size, panel count and roof area; [what size solar system do I need](/learn/what-size-solar-system-do-i-need) works through examples. [3 kW or 5 kW](/learn/3-kw-vs-5-kw) sets the two most common sizes side by side, the [5 kW page](/pricing/5-kw) has the full figures, and homes using under 150 units a month are better served by the [2 kW page](/pricing/2-kw). ## What happens to the bill in Delhi Delhi's domestic tariff is telescopic, so solar removes imports from the top slabs first and the saving per unit is higher than the bill's average rate. What does not disappear is the fixed charge, ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month on the DERC schedule, or the surcharges that ride on it. Delhi's free-power subsidy, for households that opt into it, is worked out on net units, that is import minus export, so a home that nets under 200 units keeps it. On top of the energy saving comes the GBI, credited monthly for five years. The net meter comes from BSES Rajdhani, BSES Yamuna or Tata Power-DDL, and DERC's 2026 guidelines give the DISCOM 10 days to connect a system up to 10 kW, with no application fee for domestic consumers; the [Delhi net-metering page](/net-metering/delhi) has the process and the documents. ## What happens to the bill in Uttar Pradesh Noida, Greater Noida, Ghaziabad and Varanasi have no GBI, so the whole saving is on the energy charge, which is also telescopic. The fixed charge of ₹110 per kW per month stays. The [bill calculator](/tools/electricity-bill-calculator) applies the slab rates to your own units and sanctioned load. The right electricity board keeps your application moving. Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company), Greater Noida and Greater Noida West by NPCL (Noida Power Company Limited), Ghaziabad by PVVNL and Varanasi by PUVVNL. Check the name on your bill before you apply; each city page explains that board's process. ## Paying for it Verde Solaire's July 2025 posts put the payback on a subsidised 3 kW system at about three years; the calculator on this page, with its 10% derate and today's slabs, lands a little later. The PM Surya Ghar loan is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. On the mid-point of the 3 kW net price the EMI is close to the monthly saving. The [EMI calculator](/tools/emi-calculator) takes any rate and tenure, and the [solar loan page](/solar-loan) lists the banks. The subsidy is paid into your bank account after commissioning whether or not you took a loan; [who pays whom](/subsidy/who-pays-whom) has the sequence. ## Three details that protect your 3 kW savings - **Understand the Delhi top-up.** Delhi's state subsidy is up to ₹78,000, not a second central subsidy. The zero-upfront scheme, a 2 or 3 kW rooftop system at no cost, was approved by the Delhi Cabinet on 1 September 2026, but the detailed rules have not yet been announced and registration is not yet open. - **Use the right central-subsidy figure.** ₹78,000 is the total cap for 3 kW and above, not a per-kW rate. - **Plan finance on the current terms.** The concessional loan rate is 5.75% rather than the older around 7% (February 2024 figure, superseded) figure. GST is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), and the scheme runs to 31 March 2027. Use your last 12 electricity bills and a roof survey to turn these planning figures into a system recommendation. ## The same 3 kW, city by city ## Questions **How much does a 3 kW solar system cost with subsidy?** On Verde Solaire's published July 2025 range of ₹1,99,000 to ₹2,10,000, a 3 kW system nets to ₹43,000 to ₹54,000 in Delhi after the ₹78,000 central subsidy and the ₹78,000 Delhi state subsidy, and to ₹91,000 to ₹1,02,000 in Uttar Pradesh after the ₹78,000 central subsidy and the ₹30,000 state subsidy. The written quote after a site survey is the price. **How many units does a 3 kW solar system generate per day?** Roughly 11 to 13 units a day averaged across the year in Delhi NCR. Verde Solaire's published planning figure is 360 to 400 units a month; this site's calculator, which removes 10% for dust and the monsoon, gives about 330 units in Delhi and 340 in Noida. Expect more from April to June and less in the monsoon and in December and January fog. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **What is the 3 kW solar panel price in Noida with subsidy?** ₹91,000 to ₹1,02,000 after the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy. Noida city's net meter comes from PVVNL; Greater Noida and Greater Noida West are served by NPCL. The name on your bill settles which. **How many solar panels are in a 3 kW system, and how much roof area does it need?** Six panels of about 540 Wp, the module size on Verde Solaire's recent installations, on 300 to 350 square feet of shadow-free roof. **Is a 3 kW solar system enough for a home with two ACs?** Usually. Verde Solaire's published guide fits 3 kW to homes with two to four air conditioners using 200 to 400 units a month. If the average of your last twelve bills is above 400 units, look at 5 kW instead. **What is the 3 kW solar inverter price?** Verde Solaire does not publish a separate inverter price. The published 3 kW system price of ₹1,99,000 to ₹2,10,000 includes the inverter, panels, mounting structure, net metering, installation and warranty, and the written quote names the inverter make and model. **How much does a 3 kW solar system with battery cost?** The published price is for an on-grid system without a battery. Hybrid and off-grid systems are quoted per site, because the battery size depends on what you want to run during a power cut and for how long. --- # 30 kW residential plant completed Source: https://www.verdesolaire.com/updates/30-kw-residential-plant Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire has completed a 30 kW rooftop solar plant on a private residence. Its engineers designed the mounting structure so that the existing exterior of the house was left as it was, which the customer had set as a condition of the job. The company published the announcement on 16 February 2026. ## What was published The original post is short. It says the plant is 30 kW, that it was installed in a residence, that the structure design was unique, and that the engineers took care not to disturb the exterior of the house at the customer's request. It refers to a video, which is not reproduced here. It does not name the city, the module or inverter make, the number of modules, the annual yield or the saving on the bill. None of those figures appears on this page, because none was published. ## Why the structure is the point On most home installations the frame is a standard rail kit bolted to the terrace at a fixed tilt. This owner wanted the array kept out of the view of the house from outside, so the frame had to be designed around the parapets and roofline rather than across them. At 30 kW that is a large array, and it still has to clear water tanks, staircase heads and the roof edge while sitting where it generates well. ## What 30 kW on a house means Verde Solaire publishes home systems from 1 kW to 50 kW, so this plant sits near the top of its residential range. The PM Surya Ghar: Muft Bijli Yojana sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW; a home that needs 30 kW uses many times that, usually a large house with several air conditioners running through the summer. The subsidy does not scale with it. The central subsidy is capped at ₹78,000 for any home system of 3 kW or more, so a 30 kW plant receives the same amount as a 3 kW one. A system of this size is paid for almost entirely by the owner, and the case for it rests on the bill it removes. The full write-up, with the subsidy arithmetic and the net-metering timelines that apply above 10 kW, is on the [project page](/projects/30-kw-residence). The [residential solutions page](/solutions/residential) covers what an installation involves, and the [system size guide](/learn/what-size-solar-system-do-i-need) shows how roof area and monthly units set the capacity. To ask about your own roof, use the [contact page](/contact). ## Questions **What did Verde Solaire announce on 16 February 2026?** That it had completed a 30 kW rooftop solar plant on a private residence. The mounting structure was designed by its engineers so that the existing exterior of the house was not disturbed, which the customer had asked for. **Where is the 30 kW residential solar plant?** Verde Solaire's published page does not name the city, so this update does not name one either. **Is 30 kW a normal size for a house?** It is large but inside Verde Solaire's published residential range of 1 kW to 50 kW. A home that justifies 30 kW uses far more than the 300 units a month at which the PM Surya Ghar guide suggests going above 3 kW. **Does the PM Surya Ghar subsidy cover a 30 kW home system?** Only up to the cap. The central subsidy is capped at ₹78,000 for any home system of 3 kW or more, so a 30 kW plant receives the same ₹78,000 as a 3 kW plant. The rest is paid by the owner. **Which panels and inverters were used?** Not published. The announcement gives the capacity, the residential setting and the structure requirement, and refers to a video. It does not name the module or inverter make, the yield or the saving. --- # 30 kW residential plant, custom structure Source: https://www.verdesolaire.com/projects/30-kw-residence Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 30 kW rooftop solar plant on a private residence, on a mounting structure its engineers designed so that the house's existing exterior was left as it was. The customer had set that as a requirement, and the company published the project on 16 February 2026. The published project focuses on the 30 kW capacity and its custom structure. Equipment models, generation and savings were not included, so the details below stay with the design brief and the information available for this home. ## What Verde Solaire published | Item | Published detail | |---|---| | Setting | A private residence | | Rated system power | 30 kW | | Structure | A unique design; the engineers took care not to disturb the existing exterior of the house, at the customer's request | | Published | 16 February 2026 | | Video | Referred to on the page; not available here | | Not published | City, modules, inverters, annual yield, bill before and after | ## Why the structure was the story On most home installations the mounting structure is the least discussed part of the system: a standard frame bolted to the roof at a fixed tilt. This roof was different because the owner cared how the house looked from outside. Verde Solaire's page describes the structure design as unique and says its engineers "took care to not tamper with the existing exterior beauty of the residence". In practice that means designing the frame around the parapets, terraces and roofline rather than across them, and at 30 kW that is not a small frame. Verde Solaire has published one other home installation where a customer singled out the structure. Navin Verma, writing about his 10 kW system in Janakpuri, New Delhi, said: > "I used Vikram solar panels and KSolare inverters with an elevated module mounting structure. The installation of solar plant by Verde was of very good quality and their installation of solar system was also very quick." > > Navin Verma That is a different, smaller project, quoted only because it is the company's published example of an elevated structure on a house; its page is at [Janakpuri, Delhi, 10 kW](/projects/janakpuri-delhi-10-kw). ## What 30 kW on a house means Verde Solaire publishes home systems from 1 kW to 50 kW, so a 30 kW plant sits near the top of its residential range. The PM Surya Ghar: Muft Bijli Yojana sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW; a home that justifies 30 kW uses many times the consumption that guide was written for. The subsidy arithmetic changes at this size. The central subsidy is capped at ₹78,000 for any system of 3 kW or more, so a 30 kW home receives the same amount as a 3 kW home, not ten times it. The Delhi top-up is capped at up to ₹78,000 and the Uttar Pradesh top-up at ₹30,000 per consumer, on top of the central subsidy. A plant of this size is therefore paid for almost entirely by the owner, and the case for it rests on the bill it removes. Net metering also takes longer above 10 kW in Delhi: the DERC guidelines of 16 July 2026 give the electricity board 25 days for such a connection, against 10 days below it. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. ## If your roof is like this one The two questions that decide a system of this size are how much shadow-free roof you have and how many units you use in a month; the [system size guide](/learn/what-size-solar-system-do-i-need) covers both, and the [residential solutions page](/solutions/residential) covers the installation itself. Verde Solaire offers a free site evaluation and no-obligation proposal, which is where a structure like this one gets designed. The [subsidy guide](/subsidy) explains what a home above 3 kW can claim, the announcement of this plant is under [updates](/updates/30-kw-residential-plant), and the [contact page](/contact) is the place to ask about your own roof. ## Questions **Where is Verde Solaire's 30 kW residential solar plant?** Verde Solaire's published page says only that the plant was installed in a residence. The city was not published, so this page does not name one. **Can a house have a 30 kW solar system?** Yes. Verde Solaire publishes home systems from 1 kW to 50 kW, so 30 kW sits inside its residential range. The usable roof area and the home's monthly consumption decide the size, and the electricity board approves capacity within its own limits. **Does the PM Surya Ghar subsidy apply to a 30 kW home system?** The central subsidy is capped at ₹78,000 for any system of 3 kW or more, so a 30 kW home system receives the same ₹78,000 as a 3 kW one, not a multiple of it. The state top-up is also capped at 3 kW: ₹78,000 in Delhi and ₹30,000 in Uttar Pradesh. **What is a custom mounting structure on a rooftop solar plant?** A steel frame designed for one roof rather than a standard rail kit: raised, angled or set back so the panels sit where they generate well without changing how the house looks. On this project Verde Solaire's engineers designed the structure so the residence's existing exterior was not disturbed, which the customer had asked for. **Which panels and inverters were used on the 30 kW residence?** Not published. Verde Solaire's page gives the capacity, the setting and the structure requirement, and refers to a video; it does not name the module or inverter make, the yield or the savings. **Is there a video of the 30 kW residential plant?** The published page says 'Watch the video here', but the video is not reproduced on this site. --- # 430 kW plant commissioned at Dharuhera Source: https://www.verdesolaire.com/updates/dharuhera-430-kw-commissioned Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) On 30 March 2023 Verde Solaire announced that it had installed a 430 kW rooftop solar power plant at a factory in Dharuhera, Haryana, built with Adani solar modules and Havells inverters. This page is the announcement rewritten in plain language; the full account, including the financing, is on the [Jindal Prefab project page](/projects/jindal-prefab-dharuhera-430-kw). ## What was published The post gave five facts about the plant. Its rated power is 430 kW. The modules are from Adani Solar. The inverters are from Havells and, as published at the time, carry a 10-year warranty. A module cleaning system was installed, with walkways between the rows. And the factory is paying the EMI on the loan it took for the plant out of the reduction in its electricity bill. The post also described the equipment as above the industry standard. That is the company's own description, not a measured figure, and it is repeated here only as such. ## What was not published The announcement did not name the customer, and it gave no module wattage or count, no inverter sizes, no annual yield, no project cost and no loan terms. A later Verde Solaire page from June 2023 identified the site as Jindal Prefab and described the loan; those details are on the [project page](/projects/jindal-prefab-dharuhera-430-kw) with their own source, and are not repeated here because they were not part of this announcement. ## Why the cleaning system matters A factory roof in Haryana collects dust for most of the year, and dust is the main reason a plant produces less than its rating suggests. On a roof of this size, panels cannot be reached from the edge, so the plant was built with walkways between the rows and a cleaning system, so that washing does not mean walking on the glass. What cleaning does to output in this region is covered on the [monsoon and dust page](/learn/monsoon-and-dust-generation-ncr). ## For factories considering the same route The point the post makes is that a solar loan can be serviced from the bill saving while the plant is still being repaid. The [solar loan page](/solar-loan) explains how such a loan is applied for, the [commercial and industrial page](/solutions/commercial-industrial) covers how a plant of this size is sized and connected, and the [commercial payback calculator](/tools/commercial-payback) does the arithmetic with your own tariff, load and loan terms. Every published installation is listed on the [projects page](/projects); other announcements are under [updates](/updates). ## Questions **What did Verde Solaire announce on 30 March 2023?** A 430 kW rooftop solar power plant installed at a factory in Dharuhera, Haryana, using Adani solar modules and Havells inverters, with a module cleaning system and walkways between the rows. **Which factory is the 430 kW Dharuhera plant on?** The announcement itself did not name the customer. Verde Solaire's June 2023 page on commercial savings identifies it as Jindal Prefab; the full project page on this site covers that. **What warranty did the inverters at Dharuhera carry?** The post said the Havells inverters came with a 10-year warranty. That is the 2023 figure as published; the module warranty was not stated. **How is the factory paying for the Dharuhera plant?** The post said the company is paying the EMI on its solar loan out of the savings on its electricity bill. The loan amount, rate and project cost were not published. **Why does a 430 kW plant need walkways?** So the panels can be cleaned without anyone stepping on the glass. Dust is the main reason a plant in Haryana produces less than its rating, and a roof this size cannot be washed from the edge. --- # 5 kW solar panel price in Delhi 2026 Source: https://www.verdesolaire.com/pricing/delhi/5-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose 5 kW when your Delhi home uses more than 400 units a month and you have room for ten panels. It produces about about 544 units a month a month on the planning yield used here. For every Delhi capacity, see the [Delhi price page](/pricing/delhi). For a city-by-city comparison, see the [5 kW page](/pricing/5-kw). ## Two rules change once you cross 3 kW The subsidy does not follow the system size. PM Surya Ghar pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, then stops; ₹78,000 is the ceiling whether the roof carries 3 kW or 5 kW . Delhi's own subsidy is ₹26,000 per kW, capped at up to ₹78,000, and that cap is also reached at 3 kW . So the fourth and fifth kilowatts carry no subsidy at all. Against a published 3 kW price of ₹1,99,000 to ₹2,10,000, the 5 kW range is to higher, and all of that difference is yours to pay. A home whose twelve-month average is well above 400 units. Below that, 3 kW gets the same subsidy on a lower price and the higher incentive rate on every unit; the [3 kW Delhi page](/pricing/delhi/3-kw) has those figures, and [3 kW or 5 kW](/learn/3-kw-vs-5-kw) sets the two side by side. ## Check one: sanctioned load The sanctioned load printed on your bill is the first thing to read, because a load of 3 kW or 4 kW is smaller than the system you are buying. Since the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade . In practice the connection is enhanced to match the plant as part of the net-metering application, by the electricity board rather than the installer, and the enhanced load then sets your fixed charge. Delhi's fixed charges are ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month. A 5 kW load stays in the 2 to 5 kW band; a 6 kW load asked for as headroom moves you into the next band at double the rate per kW. Ask the board what the enhancement itself costs, since it is not part of the published price. Verde Solaire reads the sanctioned load from your bill at the free site evaluation. ## Check two: the roof Verde Solaire's published planning figure is 300 to 350 square feet of shadow-free roof for 3 kW ; scaled to 5 kW that is roughly 500 to 580 square feet. With the 530 to 545 Wp modules used on the company's recent Delhi homes, that is ten panels. The survey counts panels rather than square feet, because a builder-floor roof is shared with water tanks and a stair head; a raised structure lifts the array above tanks and walkways so the terrace stays usable. A Janakpuri customer, Navin Verma, wrote that he "used Vikram solar panels and KSolare inverters with an elevated module mounting structure" and that the installation "was of very good quality". Whether ten panels fit is settled on the site visit. ## Check three: the panels and the inverter For a subsidised system, both the modules and the cells must be made in India, and for net-metering systems commissioned from 1 June 2026 the cells must appear on ALMM List-II . GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%) , and is inside the published range. A 5 kW system pairs ten modules with a 5 kW on-grid inverter; there is no battery, so it does not run the house during a power cut. Verde Solaire's Delhi installations have used Adani and Vikram modules with KSolare inverters, and its July 2025 price posts state 25-year performance warranties on all three panel types . Ask for the make, model and wattage of both panel and inverter in writing before paying the advance, and check them against the approved lists. ## Check four: monthly units about 544 units a month is the planning figure for 5 kW in Delhi: Verde Solaire's published Delhi yield of 1,450 units per kW a year, less a 10% allowance for dust and the monsoon, or about 6,525 units a year. Summer runs above that average and the monsoon below it. The official sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW, and 5 kW sits in its top band. Size to the twelve-month average. Under Delhi's net metering, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost , and that cost is well below the slab rate you pay, so a system sized to the summer peak gives its winter surplus away cheaply. ## Check five: the electricity board ## What a 5 kW home's bill looks like afterwards Delhi's domestic energy charge, on the FY 2021-22 DERC schedule that is still the last published order, is ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit. On top come the fixed charge from check one, a regulatory surcharge of 8% and a fuel surcharge the boards revise every month. A home using 550 units a month pays the third slab on everything above 400 units; netting off about 544 units a month removes nearly all of the energy charge and the surcharges levied on it. What remains is the fixed charge on 5 kW of load: a small bill, not zero. Delhi's free-power subsidy is reported as 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in, and with solar it is worked out on net units, that is import minus export. A household above 400 units sits outside that subsidy and gains the most from solar, which is the household 5 kW is for. The [bill calculator](/tools/electricity-bill-calculator) runs your own units and sanctioned load through the slabs. ## Paying for it, and the scheme that does not apply The PM Surya Ghar loan is collateral-free from nationalised banks at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years . Financing the whole net price on those terms gives an EMI close to the energy charge a 500-unit home pays today. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the application with you. The subsidy itself is credited to your bank account after commissioning, officially "within 30 days" of the claim; about 15 days on average. Delhi's zero-upfront scheme, Cabinet-approved on 1 September 2026, is reported as a 2 or 3 kW rooftop system at no cost for eligible residential consumers using up to 400 units a month. Both limits leave a 5 kW buyer outside it: the offer stops at 3 kW, and a home that needs 5 kW usually averages more than 400 units. PM Surya Ghar itself runs to 31 March 2027 , so allow for the survey, the inspection and the meter before that date. ## Questions **How much does a 5 kW solar system cost in Delhi with subsidy?** On Verde Solaire's published July 2025 range of ₹3,25,000 to ₹3,50,000, a 5 kW system nets to ₹1,69,000 to ₹1,94,000 after the ₹78,000 central subsidy and the ₹78,000 Delhi state subsidy. Any charge from your electricity board for enhancing the sanctioned load is extra. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Do I need to increase my sanctioned load for a 5 kW solar system in Delhi?** If your sanctioned load is below 5 kW, the electricity board enhances it as part of the net-metering application: the DERC amendment of July 2024 says no feasibility study is needed up to 10 kW on the same supply type and the DISCOM carries out any load increase. The fixed charge on your bill then follows the new load; 5 kW stays in Delhi's ₹50 per kW per month band. Ask the board what the enhancement costs, because it is not in the solar price. **How many units does a 5 kW solar system generate per month in Delhi?** About 544 units a month, or roughly 6,525 a year, using Verde Solaire's published Delhi planning yield of 1,450 units per kW per year with a 10% allowance for dust and the monsoon. **How much roof area does a 5 kW solar system need?** About 500 to 580 square feet of shadow-free roof, scaled from Verde Solaire's published 300 to 350 square feet for 3 kW. With 540 Wp modules that is ten panels; an elevated structure lifts them above water tanks where the terrace is shared. **Is Delhi's zero-upfront solar scheme available for 5 kW?** As reported after the 1 September 2026 Cabinet decision, the scheme covers up to 3 kW for households that averaged 400 units a month or less in FY 2025-26, so a 5 kW system falls outside it. The detailed rules have not yet been notified. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # 5 kW solar panel price in Noida 2026 Source: https://www.verdesolaire.com/pricing/noida/5-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose 5 kW when your home uses around 400 to 600 units a month and you have room for ten panels. It produces about about 563 units a month a month on the planning yield used here. The published Noida price is ₹3,25,000 to ₹3,50,000. After the central and Uttar Pradesh subsidy, the estimated amount is ₹2,17,000 to ₹2,42,000. The combined subsidy is ₹1,08,000, the same total available for 3 kW, so the extra capacity needs to suit your actual electricity use. Read on for the PVVNL process and roof checks. The [Noida price page](/pricing/noida) compares every size, while the [5 kW page](/pricing/5-kw) compares cities. ## Where the money goes | Line | Amount | |---|---| | Published price, July 2025 | ₹3,25,000 to ₹3,50,000 | | Central subsidy, PM Surya Ghar | ₹78,000 | | Uttar Pradesh subsidy | ₹30,000 | | Net payable | ₹2,17,000 to ₹2,42,000 | The published price covers panels, inverter, mounting structure, net metering, installation and warranty . GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), shown as its own line on a written quote . You pay the installer the full price and the subsidy reaches your bank account after commissioning, so the net figure is what the system costs you, not what you hand over on the day. The extra 2 kW over a 3 kW system cost to on the published ranges, none of it subsidised. ## The catch: the fourth and fifth kW are full price The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, then it stops: ₹78,000 is the most any home receives, whether the system is 3 kW or 10 kW . Uttar Pradesh adds ₹15,000 per kW under its Solar Energy Policy 2022, capped at ₹30,000 per consumer, on top of the central subsidy, so the state top-up is already at its ceiling on a 2 kW system . Stack the two and every rupee of subsidy has been claimed by the third kilowatt. The fourth and fifth are bought at the installer's price. That is not a reason to avoid 5 kW; it is a reason to size to your bills. The scheme's own guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW, and the number that matters is the twelve-month average, not the June peak. Between about 450 and 600 units a month, a 5 kW system displaces most of it and the two unsubsidised kilowatts still pay for themselves, only more slowly than the first three. Nearer 350, the [3 kW system in Noida](/pricing/noida/3-kw) is the better buy; [3 kW versus 5 kW](/learn/3-kw-vs-5-kw) works through the crossover. ## Roof: what ten panels need Recent Verde Solaire installations used modules of 530 to 545 Wp, so a 5 kW array is ten panels of around 540 Wp. Scaling the company's published 300 to 350 square feet for 3 kW , ten panels need about 500 to 580 square feet with no midday shadow from a water tank, parapet or the neighbour's upper floor. On a Noida builder floor the terrace is often shared, so the roof right matters as much as the area. Where the terrace must stay in use, the panels go on an elevated galvanised structure; it adds steel and labour, and the quote should state its height. ## Panels and inverter A subsidised system must use modules and cells made in India, and since 1 June 2026 the cells must be on the ALMM List-II . That rules out the cheapest imported modules. Verde Solaire's published home installations in Delhi, Noida and Varanasi used Adani and Vikram Solar modules with KSolare inverters, and the July 2025 price posts state 25-year performance warranties on all three panel types. Every quote names the make, model and wattage of panel and inverter; [panels, inverters and batteries](/equipment) explains the names. ## Monthly units and the bill A 5 kW system in Noida generates about 563 units a month on the planning yield Verde Solaire uses for Noida, 1,500 units per kW a year, after a 10% allowance for dust and monsoon: more in April to June, less in the monsoon and the winter haze. Under net metering the units exported on a bright day are set against the units imported after dark on the same bill. Uttar Pradesh urban domestic energy charges for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit . A home using 600 units a month pays into the top slab; with a 5 kW system generating about 563 units a month, almost all of that energy charge disappears and the bill falls to the fixed charge plus the few dozen units the panels did not cover. The fixed charge stays, so the bill does not reach zero. The [bill calculator](/tools/electricity-bill-calculator) works it out for your units and load. Surplus goes to the grid at a regulator's rate, not your retail slab: the third amendment of the UPERC rooftop regulations set it at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025) . A 5 kW system on a 350-unit home exports a lot at that rate, which is the arithmetic behind sizing to your own consumption. ## Sanctioned load and the transformer Two limits sit between a 5 kW quote and a 5 kW approval. The first is on your bill: the sanctioned load, the capacity your connection is contracted for, which also sets the fixed charge of ₹110 per kW per month . The second is on the street: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits . A distribution transformer feeding a sector full of rooftop systems can run out of room, and when it does the board approves the capacity it can take rather than the capacity you asked for. Neither limit shows on a price list, which is why the feasibility approval on the PM Surya Ghar portal comes before installation. Bring your latest bill to the free site evaluation: the sanctioned load on it and the transformer feeding your lane decide whether 5 kW is applied for as 5 kW or trimmed. Raising a low sanctioned load is a separate matter with PVVNL and lifts the fixed charge for as long as you hold the connection. ## The PVVNL process, step by step Noida city's electricity board is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company); Greater Noida and Greater Noida West are on NPCL. The name on your bill confirms the right route. A subsidised 5 kW system takes the national route. 1. Register on pmsuryaghar.gov.in with your state, electricity board, consumer number and mobile number, then apply for rooftop solar. 2. Wait for PVVNL's feasibility approval, where the load and transformer checks happen. 3. Have the system installed by a vendor registered on the portal; Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. 4. Submit the plant details and apply for the net meter; PVVNL inspects and the commissioning certificate is issued on the portal. 5. Submit your bank details and a cancelled cheque; the subsidy is credited, officially "within 30 days" of the claim; about 15 days on average. Verde Solaire files the application, attends the inspection and follows the meter through to activation; its July 2025 Noida price post gave 20 to 30 days after installation for net metering . Mr. L. R. Singh, a Noida customer with a 6 kW plant, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team". The [Noida net-metering page](/net-metering/noida) has the documents and the PVVNL specifics. ## Paying for it The PM Surya Ghar loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which came to 5.75% on 28 July 2026, over 10 years . On the middle of the 5 kW net range that is an EMI of about a month, against a monthly saving of about for a home using around 600 units at Noida's tariff. Both move with your usage, so run the [EMI calculator](/tools/emi-calculator) with the quote in hand. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the file. The scheme ends on 31 March 2027, and the subsidy is claimed after commissioning, so the system must be installed and inspected before then. ## Keep your Noida 5 kW quote comparable The value of a 5 kW system comes from reliable generation and the bill it can offset over time. Compare complete quotes: branded panel and inverter models, structure, wiring, warranty, net-metering support and a clear breakdown of the subsidy. Noida city is served by PVVNL, which determines the right portal for your application. ## Questions **How much does a 5 kW solar system cost in Noida after subsidy?** On Verde Solaire's published July 2025 range of ₹3,25,000 to ₹3,50,000, a 5 kW system in Noida nets to ₹2,17,000 to ₹2,42,000 after the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy. The written quote after a site survey is the price. **Is the subsidy on 5 kW more than on 3 kW?** No. The central subsidy is capped at ₹78,000 from 3 kW upwards and the Uttar Pradesh top-up is capped at ₹30,000, so a 5 kW system receives the same ₹1,08,000 as a 3 kW system. The fourth and fifth kW are paid for in full. **How many units does a 5 kW solar system generate in Noida?** About 563 units a month on average, on the planning yield of 1,500 units per kW a year with a 10% allowance for dust and monsoon. April to June run higher and the monsoon months lower. **How much roof space does a 5 kW system need?** About 500 to 580 square feet of shadow-free roof for ten panels of around 540 Wp, scaled from Verde Solaire's published 300 to 350 square feet for 3 kW. An elevated structure keeps the terrace usable underneath. **Which electricity board approves net metering for 5 kW in Noida?** Noida city is served by PVVNL, a UPPCL company; Greater Noida and Greater Noida West are served by NPCL. Under the UPERC rooftop solar regulations of 2019 the board allows capacity within the limits of the local transformer, and that is checked at the feasibility stage, before installation. **Can I take a loan for a 5 kW system under PM Surya Ghar?** Yes. The concessional loan is collateral-free from nationalised banks at the repo rate plus 0.5%, which was 5.75% on 28 July 2026, over 10 years. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs and helps with the application. **Until when can I claim the PM Surya Ghar subsidy on a 5 kW system?** The scheme's official end date is 31 March 2027. A subsidised system must use Indian-made modules and, since 1 June 2026, cells on the ALMM List-II. --- # 5 kW solar system: price, subsidy, savings Source: https://www.verdesolaire.com/pricing/5-kw Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose 5 kW when your home usually uses 400 to 600 units a month and you have room for two or three air conditioners through summer. You will need about 500 to 580 square feet of shadow-free roof. **Budget:** Verde Solaire’s published price range is ₹3,25,000 to ₹3,50,000 before subsidy. After the central subsidy and state top-up, the estimated amount is ₹2,17,000 to ₹2,42,000 in Noida and ₹1,69,000 to ₹1,94,000 in Delhi. Use the sections below to decide whether the extra capacity is worth it for your roof and electricity use. For city-wide options, see [Noida](/pricing/noida) or [Delhi](/pricing/delhi). ## What a 5 kW system is made of Ten panels of 540 Wp make 5.4 kWp of modules; Verde Solaire's recent home installations used Adani and Vikram modules of 530 to 545 Wp, and the count follows the wattage named in your quote. Scaling the published 300 to 350 square feet of shadow-free roof for 3 kW, 5 kW needs about 500 to 580 square feet. The inverter is a 5 kW on-grid unit. There is no battery; a hybrid system is a different product. For a subsidised system, both the modules and the cells must be made in India, and since 1 June 2026 the cells must also appear on the ALMM List-II. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), shown as its own line on the quote. The published price includes panels, inverter, mounting structure, net metering, installation and warranty; civil work, a load enhancement or a battery are extra. The [equipment pages](/equipment) explain the names on a quote. ## Why the subsidy stops at 3 kW The PM Surya Ghar: Muft Bijli Yojana central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000 for any system of 3 kW or more. The fourth and fifth kilowatts receive nothing from the Centre. The state top-ups stop at the same point: Delhi's is capped at up to ₹78,000 and Uttar Pradesh's at ₹30,000 per consumer, on top of the central subsidy. So a 5 kW system receives the same ₹1,08,000 as a 3 kW system, against a published price to higher. The subsidy covers roughly half the price of 3 kW and a third of the price of 5 kW, and the extra 2 kW is bought at full price, so 5 kW only makes sense when you will use the extra generation. The [3 kW page](/pricing/3-kw) has the smaller system's figures, and [3 kW or 5 kW](/learn/3-kw-vs-5-kw) sets the two side by side. ## How many units a 5 kW system generates Verde Solaire's planning yield is 1,500 units per kW per year in Noida and 1,450 in Delhi, and this site takes 10% off that for dust and monsoon. The result is about 563 units a month in Noida and about 544 units a month in Delhi, or about 18 units a day averaged across the year. Generation is not flat: April to June run well above the average and the monsoon and December to January well below, so budget on the annual total, not a May reading. [Monsoon and dust in Delhi NCR](/learn/monsoon-and-dust-generation-ncr) has the month-by-month picture. An on-grid system has no battery: midday units are used at once or exported through the net meter and credited against the evening's draw. ## Who should buy 5 kW The published sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. In practice: - **Buy 5 kW if** your bills average 400 to 600 units a month across the year, you run two or three air conditioners through summer, and you have about 500 to 580 square feet of roof without midday shade. - **Look at 10 kW if** you average more than 700 units and have the roof and the sanctioned load; the [10 kW page](/pricing/10-kw) explains why that size is quoted per site. Delhi eligible residential consumers using up to 400 units a month should read about the state's announced zero-upfront scheme, which offers a 2 or 3 kW rooftop system at no cost, before paying for a larger system. Add up twelve months of bills first; a summer bill alone oversizes the system. The [system size calculator](/tools/system-size-calculator) does the arithmetic from your units and roof area. ## Delhi: sanctioned load, the per-unit incentive and a 10-day connection The second is the sanctioned load on your bill. A connection sanctioned below 5 kW is not refused: under the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. The fixed charge, though, follows the sanctioned load. On the FY 2021-22 schedule it is ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month, so a 5 kW load costs a month before surcharges. Under the DERC guidelines of July 2026 the connection timeline for systems up to 10 kW is 10 days, with no application fee for domestic systems. The [Delhi net-metering page](/net-metering/delhi) covers BSES Rajdhani, BSES Yamuna and Tata Power-DDL, and [5 kW in Delhi](/pricing/delhi/5-kw) has the Delhi-only figures. ## Uttar Pradesh: the state top-up and two Noida boards Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under the UP Solar Energy Policy 2022. Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company) and Greater Noida by NPCL (Noida Power Company Limited); the name on your bill tells you which route to use. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits, so a 5 kW request can be reduced if the local transformer has limited capacity. The [Noida net-metering guide](/net-metering/noida) explains the process, and [5 kW in Noida](/pricing/noida/5-kw) has the local figures. [Greater Noida](/pricing/greater-noida), [Ghaziabad](/pricing/ghaziabad) and [Varanasi](/pricing/varanasi) receive the same subsidy and net price under NPCL, PVVNL and PUVVNL respectively. ## What the bill does after 5 kW The energy charge on a 400 to 600 unit bill is where the money goes, and a 5 kW system removes most of it. The fixed charge stays. In Uttar Pradesh it is ₹110 per kW per month of sanctioned load, so the bill never reaches zero: what goes is most of the energy charge. On the calculator's assumptions the net price of a 5 kW system is recovered in about three and a half to four years in Delhi and five to six years in Uttar Pradesh. The July 2025 price posts list 25-year performance warranties on all three panel types. The [bill calculator](/tools/electricity-bill-calculator) takes your units and sanctioned load and shows the before and after on the Delhi and Uttar Pradesh slabs. ## Paying for it The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Financing the full net price of a 5 kW system at that rate and tenure is an EMI of about to a month, below the calculator's monthly saving for a home that uses everything the system generates. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the application with you. The [EMI calculator](/tools/emi-calculator) takes any rate and tenure; the [solar loan page](/solar-loan) lists the options. The scheme ends on 31 March 2027, and the subsidy is claimed after commissioning, so the system has to be installed and inspected before then. ## Get the 5 kW numbers right before you sign For a 5 kW system, the published system price, the subsidy cap and your electricity board all matter. The subsidy does not increase above 3 kW, so compare the net price and expected bill saving—not the headline discount alone. Your written quote should name the branded panels, inverter, structure, warranties, installation scope and support for net metering and subsidy processing. ## A 5 kW system Verde Solaire has installed Verde Solaire published a 5 kW installation in Varanasi under PM Surya Ghar in June 2024, and the company is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Sushma Pandey, who had a 5 kW plant installed in Varanasi, wrote that the team was "professional and efficient" and that "My electricity bills have noticeably decreased". The [Varanasi 5 kW project page](/projects/varanasi-5-kw) has the details, and the company offers a free site evaluation and no-obligation proposal before any quote. ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **5kW solar panel produces how many units?** About 6,750 units a year in Noida and 6,525 in Delhi on the published planning yield less a 10% derate for dust and monsoon. That is roughly 545 to 565 units a month, or about 18 units a day averaged over the year, with more in April to June and less in the monsoon and in December and January. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **What is the 5 kW solar panel price in Noida?** ₹3,25,000 to ₹3,50,000 before subsidy and ₹2,17,000 to ₹2,42,000 after the ₹78,000 central and ₹30,000 Uttar Pradesh subsidy. Noida city is on PVVNL for net metering; Greater Noida is on NPCL, with the same price and the same subsidy. **How many ACs can a 5 kW solar system run?** A 5 kW on-grid system generates about 545 to 565 units a month, which matches a home that runs two or three air conditioners through summer and uses 400 to 600 units a month. It offsets that consumption through the net meter rather than powering the ACs directly, and it does not run them during a power cut, because an on-grid system has no battery. **How many solar panels and how much roof area does 5 kW need?** Ten panels of 540 Wp, on about 500 to 580 square feet of shadow-free roof, scaled from Verde Solaire's published 300 to 350 square feet for 3 kW. The panel count changes with the wattage named in your quote. **Is the subsidy on a 5 kW solar system more than on 3 kW?** No. The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third and is capped at ₹78,000. Uttar Pradesh's top-up is capped at ₹30,000, so a 5 kW system there gets ₹1,08,000 in total, the same as 3 kW. Delhi's top-up is capped at ₹78,000, so a 5 kW system in Delhi gets ₹1,56,000 in total, also the same as 3 kW there. Either way the extra 2 kW is paid for in full. **Do I need to increase my sanctioned load for a 5 kW solar system in Delhi?** If your sanctioned load is below 5 kW, the DISCOM handles the load increase as part of the net-metering application; under the DERC amendment of July 2024 no feasibility study is needed up to 10 kW on the same supply type. The fixed charge on a Delhi bill is per kW of sanctioned load, so it rises with the load. In Uttar Pradesh the DISCOM allows capacity within transformer limits. --- # About Verde Solaire Source: https://www.verdesolaire.com/about Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire Private Limited is an ISO 9001:2015 certified engineering and construction company that designs, installs and commissions rooftop solar systems from its head office in Sector 47, Noida. It has delivered more than 50 MW of solar projects, is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, and was formerly Sirius Electric. ## Who we are Verde Solaire is an EPC company: it handles engineering, procurement and construction of a solar plant as one contract, rather than selling panels for someone else to fit. The team includes engineers and people who have worked in solar plant design, procurement, site survey, installation and commissioning, and the company states that this team has a team with combined experience of more than 2,000 MW. The company is trading since 2010. The earliest installation with a published customer account dates from 2017, at a house in Greater Kailash, New Delhi, fitted when the company still traded as Sirius Electric. That customer wrote in 2023 that "the solar system has been working continuously without a single day breakdown since 2017", which is the longest-running published record of the company's work. ## What we install Verde Solaire installs on-grid, off-grid and hybrid systems for three kinds of customer. - **Homes.** home systems from 1 kW to 50 kW, on independent houses, builder floors and shared roofs. The [residential page](/solutions/residential) explains sizing and the [pricing pages](/pricing) carry the published price ranges for 1 to 10 kW. - **Factories, offices and petrol pumps.** commercial installations up to 16 MW. Published projects include a 200 kW plant at a Kanpur factory, 110 kW at a carpet mill in Panipat and 430 kW at Dharuhera. The company is also registered with Indian Oil for solar plants at petrol pumps. See [commercial and industrial](/solutions/commercial-industrial). - **Schools, colleges and government sites.** Published work includes a 20 kW plant at a school in Ayodhya, 35 kW at a college in Greater Noida, 147 kW at C-MET Pune through CPWD and 170 kW for a Patna division tender. See [institutions](/solutions/institutions). Each published [project](/projects) lists capacity, place, the make of modules and inverters, and, where the company recorded it, the annual yield. ## Equipment and partnerships Modules on published installations have come from Adani, Vikram Solar, Waaree, Emmvee and CEL; inverters from Delta, Schneider, KSolare and Havells. Verde Solaire is an authorised solar solutions partner of Luminous and is certified by Vikram Solar as a trusted quality EPC integrator. Every quote names the make and model so you can check it against the ALMM lists that subsidised systems must meet. The [equipment pages](/equipment) explain what those names mean and what each warranty covers. ## Registrations Verde Solaire is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. For a homeowner the registration that matters most is PM Surya Ghar: Muft Bijli Yojana. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, which means a home in Delhi or Uttar Pradesh can choose the company on the national portal and claim the central subsidy, and the state subsidy where one applies. The company also states it provides subsidy assistance for eligible customers in Delhi, Haryana and Uttar Pradesh. On the financing side, Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, and prepares the loan paperwork with the customer. The [solar loan page](/solar-loan) sets out what the banks state on their own pages. ## Where we are The company works from three [offices](/offices): - **Noida, head office.** D-2, 2nd Floor, Sector 47, Noida 201303. This is where the survey, design and procurement teams sit, and it serves Noida, Greater Noida, Ghaziabad and Delhi. - **New Delhi, registered office.** C-213, Basement, Block C, Sarvodaya Enclave, New Delhi 110017. - **Varanasi, branch office.** Laxmi Niwas, Chetgunj, Varanasi. Home installations in Varanasi go through this office; the company's published 2 kW and 5 kW PM Surya Ghar installations there are on the [projects page](/projects). Residential work is concentrated in Delhi, Noida, Greater Noida, Ghaziabad and Varanasi. Commercial and institutional projects have been published across Uttar Pradesh, Haryana, Punjab, Bihar and Maharashtra. ## How we work The process is the same for every home: a free site visit and shadow analysis, a written quote that shows the gross price, the subsidy and the net separately, the PM Surya Ghar application filed with you, installation, the net-meter inspection with your electricity board, and the subsidy claim. Verde Solaire offers a free site evaluation and no-obligation proposal, and the quote names the modules and the inverter. The full sequence, with what happens at each stage and how long it usually takes, is on [how we work](/about/how-we-work). Warranty terms and what happens after commissioning are on [warranty and after-sales](/about/warranty-and-after-sales). One thing the process does not include is a promise of a zero bill. The fixed charge on an electricity connection does not go away; the energy charge is what solar removes. The company's own published claim is that homeowners typically reduce their power bills by 60–90%, and the [bill calculator](/tools/electricity-bill-calculator) shows the arithmetic for your units. ## What customers say Customer accounts on the company's site name the size of the system, the place and, often, the person who handled the paperwork. A Noida homeowner with a 6 kW system wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". Another, in Sector 25, Noida, described the team completing the documentation and the liaison with the electricity department for the net meter, and getting the subsidy processed. A New Delhi customer with a 10 kW system noted that the company installed a better bifacial Adani panel than the one agreed, without charging extra. The accounts are not all uncritical. Two customers, one in New Delhi and one in Pune, wrote that the net meter took longer than expected to arrive, and both attributed the delay to the electricity board rather than to the installer. That is consistent with what the [net-metering pages](/net-metering) describe: the installer files and follows up, but the DISCOM sets the date. All published reviews, attributed by name, are on the [reviews page](/reviews). Directory ratings are compiled separately and change over time, so they are not repeated here. ## Company details - Legal name: Verde Solaire Private Limited, formerly Sirius Electric. - Director: Punit Singh, Director. - GSTIN 09AAGCV4977Q1Z6, registered in Uttar Pradesh. - Certification: ISO 9001:2015 certified. - Phone: 080 4889 0647 (dial with the leading 0 from India). WhatsApp: +91 88263 18849. Email: info@verdesolaire.com. The [fact sheet](/about/fact-sheet) collects these details with their sources in one place, for anyone who needs to verify the company before signing. ## Questions **Who is Verde Solaire?** Verde Solaire Private Limited is an ISO 9001:2015 certified engineering and construction company that designs and installs rooftop solar systems. Its head office is in Sector 47, Noida, with a registered office in New Delhi and a branch in Varanasi. The company was formerly known as Sirius Electric. **Is Verde Solaire a registered PM Surya Ghar vendor?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, so a home in either state can choose it on the national portal and claim the central subsidy, plus the state subsidy where one applies. **How much solar has Verde Solaire installed?** The company states it has delivered more than 50 MW of solar projects, and that its team has combined experience of more than 2,000 MW. Published installations run from 2 kW homes in Varanasi to a 430 kW factory plant in Dharuhera. **How long has Verde Solaire been in business?** Business directories give a trading start of 2010. The company's own pages say over a decade, and its earliest surviving customer installation dates from 2017, when it traded as Sirius Electric. **Where does Verde Solaire install rooftop solar?** Delhi, Noida, Greater Noida, Ghaziabad and Varanasi for homes, with commercial and institutional projects published across Uttar Pradesh, Haryana, Punjab, Bihar and Maharashtra. **Which panel and inverter brands does Verde Solaire use?** Published installations used Adani, Vikram Solar, Waaree, Emmvee and CEL panels with Delta, Schneider, KSolare and Havells inverters. Verde Solaire is an authorised solar solutions partner of Luminous and is certified by Vikram Solar as a quality EPC integrator. Every quote names the make and model. --- # ALMM List-II explained for rooftop solar Source: https://www.verdesolaire.com/learn/almm-list-ii-explained Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) The Approved List of Models and Manufacturers, ALMM, is the Ministry of New and Renewable Energy's register of the solar equipment allowed in government-backed projects. List-I names approved solar module models and their makers; List-II names approved makers of the solar cells inside those modules. For net-metering rooftop projects commissioned from 1 June 2026, the cells must come from a List-II manufacturer. A consumer who consumers who give up the subsidy are exempt from List-II until 31 March 2027. The practical effect for a home in Delhi or Noida is one extra question to ask before you sign: which cell manufacturer is inside the panel on the quote, and is that name on List-II today. ## List-I and List-II MNRE has kept the module list, List-I, for years. A manufacturer applies, its factory and its models are inspected, and the models are added to the list with their wattage. Government-supported projects must use modules from it. List-II does the same for the cell, the wafer of silicon that makes the module work. Until 2026 a module could be assembled in India from imported cells and still sit on List-I; List-II closes that gap by requiring the cell itself to come from an approved Indian maker. This is why the two lists are usually mentioned together with the letters DCR. DCR is the domestic content requirement of the PM Surya Ghar: Muft Bijli Yojana. The scheme's rule is that both the modules and the cells must be made in India. A DCR module is one whose cells and assembly are both Indian; a non-DCR module uses imported cells. From 1 June 2026, DCR in a subsidised rooftop system means, in practice, a module from List-I built with cells from List-II. ## What changed on 1 June 2026 The ministry had set 1 June 2026 as the date from which List-II applies to rooftop projects under net metering, and it did not issue a blanket extension. Two clarifications followed in June, both reported by the trade press. **The one-month window.** On 16 June 2026 MNRE opened a one-month window for net-metering rooftop projects that were physically installed before 1 June but not yet commissioned. To qualify, every module for the project had to be on site before 1 June, backed by GIS-tagged site photographs and documents such as invoices, daily installation reports and a self-certification. Applicants had to commission within one month of filing. The ministry described this as a limited transitional measure and said it did not amount to an extension of the deadline. **The Give It Up exemption.** Residential consumers who choose the Give It Up option on the PM Surya Ghar portal, that is, who install under the scheme's process but forgo the subsidy, are exempt from List-II until 31 March 2027, the scheme's end date. They apply through the national portal and do not need a separate filing on the NISE DCR portal. The ministry said the relaxation is limited to that category and does not extend to other installations. The date that matters is commissioning, when the net meter is in and the system is certified on the portal, not the date you paid the advance or the date the panels arrived. A system ordered in May 2026 and commissioned in July 2026 falls under List-II unless it qualified for the window above. ## How we got here: a note from 2023 ALMM has been argued over since it was first enforced, and Verde Solaire's own position is on record. On 16 March 2023 Punit Singh, Director, wrote that the Government of India had, by an office memorandum dated 10 March 2023, kept the ALMM order in abeyance for one year, so that projects commissioned by 31 March 2024 were exempt from buying modules off the list. He called the decision a big relief for solar companies and developers. His reasoning at the time is worth reading against today's rule. He wrote that ALMM and the 40% basic customs duty had together closed the door on imported panels, that Indian manufacturers did not yet have the capacity to meet demand, that panel prices had risen as a result and that paybacks for factory rooftops had stretched. He also wrote that many Chinese manufacturers sat in the tier-1 category while very few Indian companies did, and that the quality of the tier-1 imported panels he had in mind was equal to or better than Indian output. He expected the production-linked incentive scheme to bring Indian factories up to demand after a year or so. That was an installer's view of a supply squeeze in 2023. The abeyance ended, List-I came back into force, and List-II followed in June 2026 with the cell requirement added. The argument remains relevant: the list only works if Indian capacity exists to meet it. Ask whether the panel on your quote is from a listed maker with the model actually in stock. ## How to check a quote against the list A quote that says "DCR panels" or "ALMM approved" and stops there cannot be checked. Ask for three things in writing and check them yourself. 1. **The module manufacturer and the exact model name**, including the wattage. Look the model up on the current List-I on mnre.gov.in. The list is a document, revised from time to time, so check the version dated closest to your commissioning date rather than a screenshot an installer sends. 2. **The cell manufacturer.** This is not always the same company as the module maker, and it is the name that has to be on List-II. If the installer cannot tell you whose cells are inside the module, the quote is not yet complete. 3. **Which route you are on.** A subsidised PM Surya Ghar system needs both lists satisfied from 1 June 2026. A Give It Up consumer is exempt from List-II until the scheme ends, and should have that route written into the quote so that the electricity board's inspection and the portal filing match. Keep the invoice that names the module model and the cell maker. It is the document that proves compliance at inspection, and it is the one the ministry asked for when it opened the June 2026 window. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, and the panel and inverter makes on its published projects are listed on the [solar panels page](/equipment/solar-panels). Whatever installer you use, the check above takes ten minutes and belongs in the same sitting as the [vendor-list check](/learn/verify-your-pm-surya-ghar-vendor) and the questions to settle [before you pay the advance](/learn/before-you-pay-the-advance). ## What this does not change The subsidy amounts, the nine portal steps and the state top-ups are unaffected; the [subsidy guide](/subsidy) sets them out with their sources. Net-metering rules for your electricity board are also unchanged, and the [net-metering hub](/net-metering) covers each licensee. ALMM is a rule about what goes on the roof, not about who pays whom or how much. ## Questions **What is ALMM List-II?** The Approved List of Models and Manufacturers is kept by MNRE. List-I covers solar modules (panels) and List-II covers the solar cells inside them. A subsidised or net-metered rooftop system commissioned from 1 June 2026 needs cells from a List-II manufacturer as well as modules from List-I. **Is ALMM List-II mandatory for a PM Surya Ghar system?** Yes, for systems commissioned from 1 June 2026. The subsidy already required both modules and cells to be made in India; List-II makes the cell requirement a named list. The one exception is a consumer who gives up the subsidy, who is exempt until 31 March 2027. **What does DCR mean on a solar quote?** DCR stands for domestic content requirement: the modules and the cells inside them are made in India. Non-DCR panels use imported cells. A PM Surya Ghar system must be DCR, and from 1 June 2026 the cells must come from a manufacturer on ALMM List-II. **My panels were installed before 1 June 2026 but the net meter came later. Am I covered?** MNRE opened a one-month window from 16 June 2026 for net-metering rooftop projects where every module was on site before 1 June 2026. The developer had to file with GIS-tagged photographs, invoices and daily installation reports, and commission within a month of filing. The ministry said this was not an extension of the deadline. **How do I check whether my quote uses ALMM panels?** Ask for the module manufacturer, the exact model and the cell manufacturer, then look both up on the current ALMM lists on mnre.gov.in. A quote that only says 'DCR panels' or 'ALMM approved' without a model name is not checkable. **Do I need ALMM cells if I install without the subsidy?** Under the ministry's June 2026 clarification, a residential consumer who opts for Give It Up on the PM Surya Ghar portal is exempt from List-II until 31 March 2027 and applies through the national portal. The ministry said the relaxation is limited to that category and does not extend to other installations. --- # Authorised Luminous solar partner Source: https://www.verdesolaire.com/updates/luminous-partner Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire is an authorised solar solutions partner of Luminous. The company announced the partnership on 25 March 2023, and the announcement covered two things: on-grid rooftop systems in Noida, and off-grid systems for farmhouses around Noida and Faridabad that have no electricity connection. ## What was announced The original post was three sentences long. It said that Verde Solaire Private Limited had been made an authorised solar solutions partner of Luminous, the inverter and battery brand; that solar systems in Noida built by Verde Solaire with Luminous equipment are of high quality; and that Verde Solaire also supplies off-grid systems, which suit the many farmhouses around Noida and Faridabad without an electricity connection. It closed by inviting enquiries for solar power plants in Noida. The certificate photographed with the post named the company and its district, Gautam Buddh Nagar, and carried a validity date of December 2023. ## What a partner authorisation does and does not tell you An authorisation means the manufacturer has listed the installer as one it works with. It does not by itself decide which equipment goes on your roof. That is settled job by job, on the load, the roof and the budget, and the [project pages](/projects) on this site name the panel and inverter make used on each installation. Whichever brand is proposed, ask for the make and model of every panel, inverter and battery in writing before you pay an advance. The [inverter page](/equipment/solar-inverters) explains what to look for. ## Off-grid systems for sites with no connection An off-grid system stores the day's generation in batteries instead of exporting it, so it works where there is no supply to net-meter against. That is the situation at a number of farmhouses on the outskirts of Noida and Faridabad, which is why the 2023 post singled them out. A house that already has a connection can put an on-grid system on net metering and avoid the cost of batteries; a hybrid system sits between the two, adding a battery to an on-grid system for backup. The [off-grid and hybrid page](/solutions/off-grid-hybrid) sets out when each makes sense, and the [battery page](/equipment/solar-batteries) covers storage. The announcement Verde Solaire published on 25 March 2023 described an authorisation that was valid till December 2023. Verde Solaire has not published a renewal since, so ask about the current status when you enquire. Two related credentials each have their own dated post: [certified by Vikram Solar as an EPC integrator](/updates/vikram-solar-certified-epc) and [registered with Indian Oil for petrol pump solar](/updates/indian-oil-petrol-pump-solar). Every company fact used on this site is collected on the [fact sheet](/about/fact-sheet), and other announcements are listed under [Updates](/updates). ## Questions **Is Verde Solaire an authorised Luminous partner?** Verde Solaire announced on 25 March 2023 that it is an authorised solar solutions partner of Luminous. The certificate shown with that post was valid till December 2023, and no renewal has been published since, so ask for the current status when you enquire. **Does Verde Solaire install Luminous inverters and batteries?** The 2023 announcement says Verde Solaire supplies solar systems in Noida built with Luminous equipment. Which make goes on a given roof is decided job by job; ask for the make and model of every component in your written quote. **Does Verde Solaire do off-grid solar for farmhouses near Noida and Faridabad?** Yes. The same announcement says Verde Solaire supplies off-grid systems, which suit farmhouses around Noida and Faridabad that have no electricity connection. **Do I need an off-grid system if my house already has an electricity connection?** Usually not. With a connection you can net-meter an on-grid system and avoid the cost of batteries. Off-grid is for sites with no connection; a hybrid system adds a battery to an on-grid system for backup. --- # Before you pay a solar installer an advance Source: https://www.verdesolaire.com/learn/before-you-pay-the-advance Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Do not pay a solar installer an advance until the written quote names the vendor's registration under PM Surya Ghar: Muft Bijli Yojana, the make and model of every panel and inverter, whether the system gives you backup in a power cut, how many years of maintenance are included, who files the net-metering application, and a payment schedule tied to delivery and commissioning. The subsidy is paid to you, not to the installer, after the plant is commissioned, so every rupee you hand over before delivery is protected only by what is written down. Print the checklist, take it to every installer including us, and treat a blank against any line as the answer. ## Print this checklist - **Vendor registered on the national portal.** the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Look the company up for your state and electricity board; the Delhi Solar Portal links the same lists by DISCOM. How to read the list is on [verify your PM Surya Ghar vendor](/learn/verify-your-pm-surya-ghar-vendor). - **A written quote that names the make and model.** Panel make, model and wattage; inverter make and capacity; structure, cables, earthing and protection. "Tier-1 panels" is not a specification. - **ALMM check.** For a subsidised system, both the modules and the cells must be made in India, and for net-metering projects commissioned from 1 June 2026 the cells must be on ALMM List-II. Check the named model against the list; [ALMM List-II explained](/learn/almm-list-ii-explained) shows how. - **Backup: yes or no, in writing.** An on-grid system switches off in a power cut. If you expect the lights to stay on, the quote must say hybrid and name the battery. - **Maintenance years, and what a visit covers.** The number of years, the number of visits, and whether cleaning is included. - **Who files net metering.** Who files the application, attends the inspection and follows it to activation, and whether that is inside the price. - **Milestone payments in writing.** What is paid at booking, what at delivery, what at commissioning, and what each payment buys. - **A GST invoice.** GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). The invoice must carry the seller's GSTIN and the same make and model as the quote. - **Serial numbers at delivery.** Photograph every module and inverter serial number on arrival and check them against the invoice and warranty cards. ## Why this page exists Advance payments go to solar installers every day, and the common fear is: pay first, then nobody answers the phone. Behind it sit three smaller fears: an unskilled crew, a system that gives no backup, and an application that sits with the vendor while the subsidy waits. The ministry has written these risks into its rules. On 24 June 2026 MNRE notified a standard operating procedure for vendor violations under PM Surya Ghar. The violations it names include "delays in project execution after receipt of advance payments", "incomplete installations despite receiving payment", "failure to provide warranties, technical certifications or consumer agreements", missing protection systems such as earthing, and mismatched module serial numbers. A vendor that fails to respond to a grievance can be deactivated for one month, and deactivated vendors' names are to be displayed on the national portal. Two months later the ministry used the rule. On 27 August 2026 MNRE deactivated 66 vendors for one month over pending applications from the April to June quarter, called the practice "artificial hoarding", and advised vendors not to hold an application for more than 60 days without valid reasons. Every line of the checklist maps to one of those violations. The fastest way for an installer to be believed is to write down what a fair contract looks like before asking for anyone's money. ## Milestones protect both sides A milestone schedule ties each payment to something you can see. The booking payment reserves the survey, the design and the order for material. The delivery payment falls due when the panels, inverter and structure are on your roof. The balance falls due at commissioning, when the system is generating and the net-meter application is in. The quote should also say what happens to the booking amount if the survey finds the roof unsuitable. The installer is protected too: modules are bought against your order and a crew is booked, so a booking payment is fair. What is not fair is the largest payment sitting ahead of the event it pays for. If a quote asks for most of the price before delivery, ask why, in writing. You pay the installer; after commissioning and the inspection, the government pays you, officially "within 30 days" of the claim; about 15 days on average. A quote that shows the subsidy "deducted" from an invoice you cannot check describes a flow that does not exist; [who pays whom](/subsidy/who-pays-whom) has the full sequence. ## The vendor list is the first filter Registration is the one check that costs nothing. If the company is not on the list, the scheme's own condition is not met, whatever the quote promises. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Registration also gives you a lever: the June procedure covers complaints submitted through "the national portal or directly to the vendor management unit". If your application shows no movement for weeks, [portal help](/subsidy/portal-help) explains what each status means. ## The quote must name the equipment A quote is a specification with a price on it. Verde Solaire's own pre-installation checklist, published on 17 September 2026, asks the homeowner to verify the module make and specifications, the inverter make and capacity, the mounting structure, cable specifications, electrical protection, earthing, monitoring and product warranties before work begins. Expect that level of detail from any installer. Named equipment is also what lets you hold an installer to a promise. Jai Kumar Manghnani, whose 10 kW system at his Greater Kailash home was installed by Verde Solaire, wrote: "We had agreed for 530W Mono Perc Adani solar panels for my solar energy system, but they installed a better bifacial solar panel of Adani without charging anything extra from us." A substitution can only be seen to be an upgrade when the original was written down. The [solar panels](/equipment/solar-panels) page explains the names on a quote. ## Backup, maintenance and net metering, in writing Three things go wrong after the money has changed hands, and each is avoidable with one line in the quote. Backup. A subsidised on-grid system shuts down when the grid fails. A home that needs power through a cut needs a hybrid inverter and a battery, priced separately. [Rooftop solar or inverter battery](/learn/rooftop-solar-or-inverter-battery) compares the two; the quote must say which one you are buying. Maintenance. The procedure also names delays in acting on consumer maintenance-contract claims as a violation, which can only be enforced when the contract states the years and the visits. Ask for both. Verde Solaire's July 2025 price posts stated 25-year performance warranties on all three panel types. Net metering. Installation is the short part; the net meter is where systems sit idle. The quote should name who files and who chases. Verde Solaire's published Delhi and Noida guides say the company handles the full net-metering process and the follow-up. If your system is installed and waiting, [installed but not activated](/learn/installed-but-not-activated) covers what to do next. ## How Verde Solaire structures payment Every enquiry starts with a free site evaluation and no-obligation proposal, and the quote that follows names the make and model of each component. Payment is set out in the quote in stages tied to booking, delivery and commissioning; the split is printed there, not here, because a figure on a web page is not a contract. Invoices are GST invoices under GSTIN 09AAGCV4977Q1Z6. In its July 2025 price posts the company also published a loan route in which the customer paid to start and financed the balance through the PM Surya Ghar concessional loan; ask for the current terms in writing. See [how we work](/about/how-we-work) and [warranty and after-sales](/about/warranty-and-after-sales). ## If you have already paid Keep the quote, receipt and message trail together. Ask in writing for a delivery date and the portal status. If there is no answer, complain through the national portal or the vendor management unit; the ministry has shown it will act. A call offering free solar in return for a processing fee is a different problem, covered on [free solar scam calls](/learn/free-solar-scam-calls). ## Questions **How much advance should I pay a solar installer?** There is no official rule. Pay against a written schedule tied to booking, delivery and commissioning, with the largest part due only after the equipment is on your roof or the system is running. The subsidy comes to your bank account after commissioning, officially within 30 days of the claim, so nothing paid early is recovered from the government. **How do I check if a solar company is registered under PM Surya Ghar?** The installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Search the vendor list for your state and electricity board; the Delhi Solar Portal links the same lists by DISCOM. Verde Solaire is a registered vendor in Delhi and Uttar Pradesh. **What should a rooftop solar contract include?** The vendor's registration, the make, model and wattage of the panels, the make and capacity of the inverter, the structure and earthing, whether the system gives backup in a power cut, the years of maintenance and the number of visits, who files net metering, a milestone payment schedule, and a GST invoice at 5%. **What GST should a solar quote show?** Since 22 September 2025, GST is about 8.9% on a complete rooftop plant: 5% on the panels and inverter, which count as 70% of the contract value, and 18% on the remaining 30% for other material and installation. A quote that shows 12% on panels, or an 'effective 13.8%', is using the old rates. **Do the panels have to be on the ALMM list to get the subsidy?** Yes. Subsidised systems must use modules and cells made in India, and for net-metering projects commissioned from 1 June 2026 the cells must be on ALMM List-II. Consumers who give up the subsidy are exempt from List-II until 31 March 2027. **The installer took my advance and is not responding. What can I do?** Ask in writing for a delivery date and the portal status, then complain through the PM Surya Ghar national portal or the vendor management unit. MNRE's June 2026 SOP allows a vendor that fails to respond to grievances to be deactivated for one month, and in August 2026 the ministry deactivated 66 vendors for holding applications; vendors are told not to hold an application beyond 60 days. **Why should I record the serial numbers of the panels?** MNRE's SOP lists mismatched solar module serial numbers as a vendor violation. Recording the serial numbers on delivery and matching them to the invoice and the warranty cards proves you received the modules you paid for and makes a warranty claim possible later. --- # BSES Rajdhani net metering: application pack Source: https://www.verdesolaire.com/net-metering/board/bses-rajdhani Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) BSES Rajdhani Power Limited is the electricity licensee for South and West Delhi, and a rooftop solar application on its network is filed online: subsidy applicants register on the PM Surya Ghar: Muft Bijli Yojana portal and authorise their vendor to apply for the net meter on rts.bsesdelhi.com (helpline 19123, extension 3); everyone else applies on that portal directly. Since 16 July 2026 the Delhi Electricity Regulatory Commission (DERC) requires the board to connect a domestic system up to 10 kW within 10 days of the post-installation submission, with no application fee. Use this guide to prepare a BSES Rajdhani application: the documents, fees, inspection and records to keep at each stage. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. ## Is BSES Rajdhani your board? BSES's own About page describes BSES Rajdhani as serving 23 divisions across South and West Delhi, naming Saket, Hauz Khas, Vasant Kunj, Nehru Place, Sarita Vihar, R.K. Puram, Dwarka, Janakpuri, Punjabi Bagh, Nangloi and Najafgarh among them. East and Central Delhi are BSES Yamuna; North and North-West Delhi are Tata Power-DDL. The two BSES companies share a name and a portal family but are separate licensees with separate queues. The licensee is printed at the top of the bill, with the two numbers the application turns on: the CA number (your consumer account) and the sanctioned load in kW. If the bill says otherwise, use the [BSES Yamuna](/net-metering/board/bses-yamuna) or [Tata Power-DDL](/net-metering/board/tata-power-ddl) pack. The [Delhi net-metering page](/net-metering/delhi) compares the three. ## The documents, in three bundles BSES lists what it wants at each stage, and the list is shorter than most people expect. Net metering is granted against the existing connection only. **At application:** the online form on the BSES solar portal, a signature ID proof of the applicant and scanned signatures. Subsidy applicants also upload a recent bill and address proof on the national portal when they choose the vendor. **After installation:** the single line diagram (SLD) of the plant, the inverter's IEC 62116 and IEC 61000 certificates with its data sheet, the net-metering connection agreement, a photograph of the earth-leakage circuit breaker (ELCB), and geotagged photographs of the plant. The vendor prepares and uploads these; you should still receive a copy of each. **At inspection:** the inspection form and the serial numbers of the inverter and the modules, which the inspector compares against the roof. ## The stages, with the official clock DERC's Second Amendment Guidelines of 16 July 2026 replaced the old three-tier process with two stages, applied equally to subsidy and non-subsidy routes and end-to-end online. Mapped onto the national portal's sequence, the process is this. 1. Confirm the licensee and sanctioned load from your bill 2. Register and apply on the portal 3. Feasibility approval 4. Installation by a registered vendor 5. Net-meter application 6. Inspection and meter installation Three provisions matter more than the headline number. First, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade, which removes Stage I for almost every home. Second, any deficiency in the documents or defect in the installation must be raised in one consolidated intimation within the Stage II period; you get fifteen days to cure it and the board then has five days to finish, and minor differences that do not affect safety or grid compatibility are not grounds for delay. Third, the cumulative limit up to connectivity is 10 days for systems up to 10 kW and 25 days above, excluding your own installation and cure time. Ask your installer for the acknowledgement date; the clock runs from it. The route is fixed too: PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. In Delhi, start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. ## Official days and reported days The guidelines are recent: July 2026. An earlier review of net-metering approvals across the Delhi boards said they took 20 to 30 days. A customer wrote: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde. In fact Verde people always kept me in the loop regarding the net meter status." Both accounts predate the July 2026 changes; as more post-July 2026 connections come in, whether the rule holds will become clearer. ## Fees, the meter and the agreement For a domestic connection up to 10 kW there is no application fee for feasibility and no registration charge, whether or not you take the subsidy. BSES takes no security deposit for net metering, so nothing is refunded if you ever surrender the connection. The connection agreement is executed on the portal at the Stage II submission; a domestic consumer up to 10 kW accepts it by tick-box, and no physical agreement is needed. A system above the sanctioned load is permitted but attracts service line cum development charges under the DERC Supply Code. Most homes stay within the load on the bill; the [Delhi pricing page](/pricing/delhi) covers what size that means. ## Where applications stall Most of the reasons are documents, not disputes. - **The name on the application differs from the bill.** BSES treats the CA number as the identity. A name change is a separate process with the division office, and once it completes the solar application must be filed afresh on the new CA number. Apply in the name on the bill, and use that person's bank account for the subsidy. - **The wrong CA number.** Solar cannot be shifted to another CA number in the same building; the net metering has to be surrendered and re-applied for. - **A tenant applying without the owner.** Tenants can apply, but only with a no-objection certificate from the owner. - **Capacity above the sanctioned load** without the charges paid or a load increase processed. - **Plant details that do not match the roof:** missing geotagged or ELCB photographs, or serial numbers that differ from the modules installed. The board must list every deficiency at once, so a second intimation for a new reason is itself something to raise. - **The vendor holding the file.** If the national portal has sat at an agreement or plant-details stage for weeks, the delay is the vendor's, not the board's; the [portal help page](/subsidy/portal-help) explains each status and the [vendor check](/learn/verify-your-pm-surya-ghar-vendor) shows how to confirm yours is still registered. ## Escalation, and what we do on your behalf BSES publishes its solar contacts in the FAQ: the portal at rts.bsesdelhi.com, the toll-free helpline 19123 with extension 3, a dedicated net-metering email and a missed-call number, 9052552509. When you call, have the CA number, the application number, the installation date and the acknowledgement date of the Stage II submission; if the board is past ten days, say so and name the DERC guidelines of 16 July 2026. The FAQ also says what the board will not do: disputes between consumer and installer are for the two of them under their agreement; the board only facilitates the net meter. That is why the vendor matters. Verde Solaire files the application with you on the survey visit, prepares the SLD, certificates and photographs, attends the inspection, and chases the board when a date is missed. If a system is installed and not activated, the [installed-but-not-activated page](/learn/installed-but-not-activated) sets out the checks. ## After the meter is in ## Print this checklist - Bill in hand: licensee reads BSES Rajdhani Power Limited; CA number and sanctioned load noted. - Applicant's name matches the bill; bank account in the same name; cancelled cheque scanned. - Signature ID proof and scanned signatures ready; owner's NOC if you are a tenant. - Registered on pmsuryaghar.gov.in; vendor chosen and authorised for rts.bsesdelhi.com. - Quote names the module and inverter make and model; DCR undertaking in hand. - Copies received after installation: SLD, inverter IEC certificates and data sheet, connection agreement, ELCB and geotagged plant photographs. - Stage II acknowledgement date recorded; ten days counted from it. - Inspection form and serial numbers of inverter and modules kept; helpline 19123 extension 3 saved. ## Questions **Which areas of Delhi does BSES Rajdhani cover?** South and West Delhi: 23 divisions including Saket, Hauz Khas, Vasant Kunj, Alaknanda, Nehru Place, Sarita Vihar, R.K. Puram, Dwarka, Janakpuri, Vikaspuri, Punjabi Bagh, Nangloi and Najafgarh, according to BSES's own About page. The licensee's name at the top of your bill settles it. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **How long does BSES Rajdhani take to install a net meter?** Under the DERC net-metering guidelines amended on 16 July 2026, a domestic system up to 10 kW on the same supply type needs no feasibility study, and the board must verify the documents, inspect, fit the net meter and grant connectivity within 10 days of acknowledging the post-installation submission. Above 10 kW the cumulative limit is 25 days. Time you take to install or to fix a deficiency is excluded. **Is there a fee for a BSES Rajdhani net-meter application?** No. Since 16 July 2026 domestic consumers pay no application fee for feasibility and no registration charges for rooftop solar connections up to 10 kW, whether or not they take the PM Surya Ghar subsidy. BSES takes no security deposit for a net-metering connection, so there is nothing to refund on surrender. **What documents does BSES Rajdhani need for rooftop solar?** At application: the online form on rts.bsesdelhi.com, a signature ID proof of the applicant and scanned signatures. After installation: the single line diagram, the inverter's IEC 62116 and IEC 61000 certificates and data sheet, the net-metering connection agreement, a photograph of the ELCB and geotagged photographs of the plant. At inspection: the inspection form and the serial numbers of the inverter and modules. For the subsidy claim: the DCR undertaking, a cancelled cheque, the consumer-vendor agreement, a plant photograph and the electricity bill. **Can I install more solar than my sanctioned load with BSES Rajdhani?** Yes. BSES's FAQ says consumers can install up to or beyond their sanctioned load, but a plant larger than the sanctioned load attracts service line cum development charges under the DERC Supply Code. Most homes size to their consumption and stay within the load on the bill. **What is the BSES Rajdhani solar helpline?** The toll-free helpline is 19123, extension 3. BSES also lists a missed-call number, 9052552509, a dedicated net-metering email in its FAQ, and the portal rts.bsesdelhi.com, where non-subsidy applicants check their status. Subsidy applicants check status on pmsuryaghar.gov.in. --- # BSES Yamuna net metering: application pack Source: https://www.verdesolaire.com/net-metering/board/bses-yamuna Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A rooftop solar system in East or Central Delhi gets its net meter from BSES Yamuna, and the rules are the DERC guidelines that bind every Delhi board: the connection is due within 10 days for a system up to 10 kW and within 25 days above that, with no application fee for a domestic system up to 10 kW, since 16 July 2026. Since the 2024 amendment, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. ## Who BSES Yamuna serves, and how to be sure BSES Yamuna is the distribution licensee for East and Central Delhi. Verde Solaire's Delhi post of 14 July 2025 lists the East Delhi localities it serves as Preet Vihar, Laxmi Nagar and Mayur Vihar, the Central Delhi ones as Karol Bagh, Patel Nagar and Daryaganj, and names BSES Yamuna as one of the three boards that facilitate net metering in the city. South and West Delhi are [BSES Rajdhani](/net-metering/board/bses-rajdhani); North and North-West Delhi are [Tata Power-DDL](/net-metering/board/tata-power-ddl). Do not rely on the map. The licensee is printed at the top of your electricity bill, beside the consumer number and the sanctioned load, and all three go straight into the application. On a boundary, the finder names the licensee for your locality. BSES Yamuna's rooftop solar desk is the same BSES Delhi portal family. BSES Rajdhani's portal and helpline are in its PM Surya Ghar FAQ of September 2025. Both boards work under the DERC (Net Metering for Renewable Energy) Regulations, 2014 and the 2014 Guidelines, as amended in 2024 and 2026. ## Two ways in Under the 2026 guidelines, PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. - **With the PM Surya Ghar: Muft Bijli Yojana subsidy.** Register on pmsuryaghar.gov.in, choose Delhi and then BSES Yamuna as the board, and enter the consumer number and mobile number from the bill. The net-meter application is a stage inside that file, and the board picks it up from the national portal. In Delhi, start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. - **Without the subsidy.** Apply on the board's own rooftop solar portal: the route for imported panels or for a household that has taken a solar subsidy before. On the first route, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. The list that counts is the one the national portal keeps for BSES Yamuna; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where it is. ## The seven stages The stages are the same for every Delhi board. The note after each title says who owes the next action. 1. Confirm the licensee and sanctioned load from your bill 2. Register and apply on the portal 3. Feasibility approval 4. Installation by a registered vendor 5. Net-meter application 6. Inspection and meter installation 7. Commissioning and subsidy claim ## The documents The portal and the board set the final list. This is what every Delhi application has needed; BSES Yamuna may word its list differently from the BSES Rajdhani FAQ. - **Your latest BSES Yamuna bill.** The consumer number, the sanctioned load and the licensee's name are read from it. Type the number exactly as printed. - **Proof that you own the house**: the sale deed or a property tax receipt. - **Photo ID of the applicant**, usually Aadhaar, and a passport-size photograph. - **The mobile number linked to the connection**, which receives the one-time password and every status message afterwards. - **Bank details and a cancelled cheque** in the applicant's name, uploaded after the commissioning certificate. - **From the installer, at the net-meter stage:** the installation photograph, the module and inverter details with serial numbers, and the net meter and safety certificate. Ask to see them before they go in. The name on the application must be the name on the bill. If the bill is in a parent's name, apply in that name and give that person's bank account. ## Fees, timelines and the inspection There is no application fee for a domestic system up to 10 kW. | Stage | The rule | What has been reported | |---|---|---| | Feasibility approval | No feasibility study up to 10 kW on the same supply type (DERC, 26 July 2024); no published day count | Verde Solaire's May 2025 guide put it at a few days for a standard domestic connection | | Connection after the net-meter application, up to 10 kW | Within 10 days (DERC guidelines, 16 July 2026) | Before the amendment, the company's Delhi post of 14 July 2025 planned on 20 to 30 days across the three boards | | Connection above 10 kW | Within 25 days (DERC guidelines, 16 July 2026) | Same planning figure; larger plants are inspected in more detail | | Subsidy after the claim | Within 30 days, about 15 days on average (MNRE, March 2025) | 30 to 45 days after verification, according to September 2026 news reports | The 20 to 30 day figure is an installer's planning number from before the amendment, and the regulator has since written a shorter clock. Arun Sibal, whose New Delhi house is on BSES, wrote: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde. In fact Verde people always kept me in the loop regarding the net meter status." The review predates the guideline and does not name the board. The subsidy row is the ministry's official figure, "within 30 days" of the claim; about 15 days on average, against reports of 30–45 days after verification in practice. At the inspection the board's engineer checks the plant against what was uploaded: capacity, module and inverter serial numbers, earthing and the protection boxes. Someone should be at home with the bill and the application number, and the installer should attend. ## Why applications stall Most stalled files are not refused; they are waiting for one document nobody has told the customer about. - **The name does not match.** The connection is in a parent's or a late relative's name. Apply in the bill's name, or transfer the connection first. - **The system is larger than the sanctioned load.** A 5 kW plant on a 3 kW connection needs a load increase before the meter. The 2024 amendment makes that the board's job, but it is a separate step. - **Ownership proof is missing or in another name.** A tenant cannot apply without the owner; a builder floor needs the roof right settled, which the [builder floors guide](/learn/solar-on-builder-floors-and-shared-roofs) covers. - **Plant details are incomplete.** Photographs missing, serial numbers that do not match the roof, or no safety certificate. This is the installer's stage, and the ministry polices it: in August 2026 MNRE deactivated 66 PM Surya Ghar vendors over pending applications and told vendors not to hold a file beyond 60 days without a valid reason. None of these is specific to BSES Yamuna; they are the ordinary reasons a Delhi file stops. ## Escalation, and what we do Read the stage on the portal and note its date. Stages 1 to 3 and 5 belong to you and the installer; stages 6 and 7 to the board and the portal. If the net-meter application is in and 10 days have passed, the board is past its clock. Call the customer care number on your bill and cite the DERC guideline of 16 July 2026 when you call. Have the consumer number, the portal application number, the installation date and the date the net-meter application went in. For our own installations, Verde Solaire files the application with you, uploads the plant details and the safety certificate, attends the inspection and follows the file to the commissioning certificate. Where the board is past its guideline we say so to the board. We print no response-time promise, because none has been published. If someone else installed your system, the [installed but not activated guide](/learn/installed-but-not-activated) explains each portal status and how to check the vendor is still registered. ## Print this checklist - Latest BSES Yamuna bill: licensee name, consumer number, sanctioned load - Proof of ownership: sale deed or property tax receipt - Photo ID (Aadhaar) and one passport-size photograph - Mobile number linked to the connection, kept active - Bank passbook or statement and a cancelled cheque, applicant's name - Portal application number, written on the bill - Date the net-meter application went in - Copies of the installation photograph, equipment details and safety certificate the installer uploaded - Inspection date and the engineer's name - Commissioning certificate downloaded from the portal - Date of the subsidy claim, and the date the credit arrived Keep a copy of everything you upload and everything the board issues; if a file stalls, the copies settle who owes the next step. ## Questions **Which areas of Delhi does BSES Yamuna cover?** East and Central Delhi, including Preet Vihar, Laxmi Nagar, Mayur Vihar, Karol Bagh, Patel Nagar and Daryaganj. Area boundaries are a guide only; the licensee named at the top of your electricity bill is the answer. **How long does BSES Yamuna take to install a net meter?** The DERC net-metering guidelines amended on 16 July 2026 require the connection within 10 days for systems up to 10 kW and within 25 days above that, and they bind BSES Yamuna as they do BSES Rajdhani and Tata Power-DDL. Before the amendment, installers were planning on 20 to 30 days. **Is there a fee for a BSES Yamuna net-metering application?** No. Since 16 July 2026 there is no application fee for a domestic system up to 10 kW under the DERC guidelines. **Do I apply to BSES Yamuna or on the PM Surya Ghar portal?** If you are taking the PM Surya Ghar subsidy, apply on pmsuryaghar.gov.in and choose BSES Yamuna as your electricity board; the net-meter application is a stage inside that file. If you are not taking the subsidy, apply on the board's own rooftop solar portal. **What documents does a BSES Yamuna net-metering application need?** Your latest electricity bill, proof that you own the house, a photo ID such as Aadhaar and a passport-size photograph, the mobile number linked to the connection, and, after commissioning, bank details and a cancelled cheque in the applicant's name. The installer supplies the installation photographs, the equipment details and the safety certificate. **Why is my BSES Yamuna net-metering application stuck?** The usual reasons are a name on the application that differs from the bill, a system larger than the sanctioned load, missing ownership proof, or plant details uploaded without the photographs and serial numbers the board wants. Each is a document, and the stage shown on the portal tells you who owes it. **Does Verde Solaire handle BSES Yamuna net metering?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in Delhi, its published prices include net metering, and its July 2025 Delhi post lists East and Central Delhi among the areas it serves. It files the application with you, uploads the plant details and attends the inspection. --- # Certified by Vikram Solar as EPC integrator Source: https://www.verdesolaire.com/updates/vikram-solar-certified-epc Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) On 24 May 2024 Verde Solaire announced that it had been certified by Vikram Solar as a trusted quality EPC integrator. The certificate reproduced in that post is headed "Certificate of Empanelment", carries registration number N_2024_07 under an "EPC Integrator Empanelment programme", and is dated 21 May 2024 with a validity to 21 May 2026. ## What the announcement said The post made three statements. First, that Vikram Solar had certified Verde Solaire as a trusted quality EPC integrator. EPC stands for engineering, procurement and construction: one firm designs the plant, buys the equipment, installs it and hands over a working system. Second, that Vikram Solar is one of the few Indian panel manufacturers regarded as tier 1; that is the post's own description, not an independent ranking. Third, that Verde Solaire had tied up with Vikram Solar's EPC division to supply plants to commercial and industrial customers. ## What the certificate shows The certificate is issued under the names VSL Ventures and VSL RE Power and signed by a business head and a head of operations. Date of issue: 21 May 2024. Valid till: 21 May 2026. The post does not say what the programme requires of an integrator or how the certificate is renewed. That validity date has passed. As of 18 September 2026 Verde Solaire has not published a renewal, so this page describes the 2024 certificate, not a current status. If the manufacturer relationship matters to your decision, ask to see the current document. ## Where Vikram Solar panels appear in Verde Solaire's work The clearest published example is the [110 kW plant at Marwar Carpets, Panipat](/projects/marwar-carpets-panipat-110-kw), from Verde Solaire's case study of 5 March 2023: 334 Vikram modules of 330 Wp with Schneider string inverters. At home scale, Navin Verma wrote on the testimonials page about his 10 kW system in Janakpuri, New Delhi: "I used Vikram solar panels and KSolare inverters with an elevated module mounting structure. The installation of solar plant by Verde was of very good quality". That system has its own [project page](/projects/janakpuri-delhi-10-kw). Vikram Solar is one of several panel brands Verde Solaire has published using, alongside Adani, Waaree, Emmvee and CEL; the [solar panels page](/equipment/solar-panels) sets out how the company chooses between them. ## What it means for a buyer An empanelment says the panel maker was willing to put its name beside the installer's at the time of issue. It does not replace the checks that matter more: a written quote naming the make and model of every component, a PM Surya Ghar vendor registration you can verify, and warranty terms in writing. The [guide to choosing a solar company](/learn/how-to-choose-a-solar-company) lists those checks; the [commercial and industrial page](/solutions/commercial-industrial) covers the factory work the tie-up was announced for. ## Questions **What did Vikram Solar certify Verde Solaire as?** A trusted quality EPC integrator. The certificate published with Verde Solaire's post of 24 May 2024 is headed Certificate of Empanelment, carries registration number N_2024_07 under an EPC Integrator Empanelment programme, and is dated 21 May 2024. **Is the Vikram Solar certification still valid?** The certificate as published states a validity to 21 May 2026. As of 18 September 2026 Verde Solaire has not published a renewal, so ask for the current certificate if it matters to your decision. **What does EPC integrator mean?** EPC stands for engineering, procurement and construction. An EPC integrator designs the plant, buys the panels, inverters and structure, installs them and hands over a working system, rather than supplying parts alone. **Has Verde Solaire installed Vikram Solar panels?** Yes. The published case study for Marwar Carpets in Panipat lists 334 Vikram modules of 330 Wp on a 110 kW plant, and a customer review describes a 10 kW home system in Janakpuri, New Delhi, with Vikram panels and KSolare inverters. --- # College in Greater Noida: 35 kW (2019) Source: https://www.verdesolaire.com/projects/greater-noida-college-35-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 35 kW rooftop solar system at a college in Greater Noida in 2019. The college reports that the system is working very well and has delivered substantial savings on its electricity bill. ## At a glance - Capacity: 35 kW - Place: Greater Noida, Uttar Pradesh - Type: a college, so an institutional connection rather than a household - Installed: 2019 - Status, in the customer's words: working very well, with a lower electricity bill for the college ## What the customer wrote Mr. Sharma adds: "We recommend them highly for installation of solar plant." The feedback reflects a system that has been operating since 2019. ## Why a college roof suits solar A college draws most of its electricity in daylight: classrooms, laboratories, fans, lights and computer rooms run between morning and late afternoon, which is when the panels generate. A home, by contrast, uses much of its power in the evening and depends on net metering to bank the daytime surplus. An institution therefore uses a larger share of its own generation directly, and its case rests on payback rather than on subsidy. The PM Surya Ghar: Muft Bijli Yojana subsidy does not apply. Its eligibility is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy, which rules out an institution. A college in Greater Noida instead compares the units it would stop buying against the price of the plant; the [commercial payback model](/tools/commercial-payback) does that arithmetic for any capacity and tariff. ## Net metering in Greater Noida Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Noida city is served by a different licensee, PVVNL, and the two have different portals, so the name on the bill decides which process applies. The documents, stages and timelines for an NPCL application are on the [Greater Noida net-metering page](/net-metering/greater-noida). Verde Solaire files the application and follows the meter through to activation as part of an installation, as the [Greater Noida installer page](/solar-installation/greater-noida) describes. ## Verde Solaire's other institutional work The company is ISO 9001:2015 certified and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. In August 2024 it published that it had installed 350 kW of rooftop solar across 29 schools and 3 colleges in one month under a West Bengal government programme, with 10 kW systems at schools and 20 kW at colleges. Published institutional projects with their own pages: - [Ayodhya school, 20 kW](/projects/ayodhya-school-20-kw) - [NISST Punjab, 20 kW](/projects/nisst-punjab-20-kw), on CEL panels - [C-MET Pune, 147 kW](/projects/c-met-pune-147-kw), ordered through CPWD - [Patna division, 170 kW](/projects/patna-division-170-kw), won on tender How the company approaches schools, colleges and government buyers is on [solar for institutions](/solutions/institutions). Every published installation is listed on the [projects page](/projects). ## Questions **How big is the solar system at the Greater Noida college?** 35 kW, installed by Verde Solaire in 2019. **Is the 35 kW college system still working?** The college's representative, Mr. P. Sharma, wrote on Verde Solaire's testimonials page that the system is working very well and has reduced the college's electricity bill. **Can a college in Greater Noida get the PM Surya Ghar subsidy?** No. The household subsidy is for an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. A college buys on payback: the bill it avoids against the price it pays. **Which electricity board handles net metering for a college in Greater Noida?** Greater Noida and Greater Noida West are served by NPCL, Noida Power Company Limited; confirm the name on the electricity bill. Noida city is served by PVVNL. --- # Cut your summer AC bill in Delhi and Noida Source: https://www.verdesolaire.com/learn/cut-your-summer-ac-bill-delhi-noida Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A summer bill in Delhi or Noida rises faster than the units do. Two or three air conditioners push the month past the slab boundaries at 200, 400 and 800 units in Delhi, or 150, 300 and 500 in Uttar Pradesh, so every extra unit is billed at the dearest rate, and in Delhi an 8% regulatory asset surcharge and a monthly fuel surcharge, 17.94% for BSES Rajdhani in June 2026, are charged on top. A 3 kW rooftop system generates about 326 units a month in Delhi and a 5 kW system about 544 units a month, which is roughly what two air conditioners use in a hot month on the estimate below. ## Where the summer units come from The figures below are engineering rules of thumb for split air conditioners, not measurements of your unit: the nameplate input and the star label are the real numbers. While the compressor runs at full load, a 1 ton split air conditioner draws roughly 0.8 to 1.2 units an hour, a 1.5 ton unit roughly 1.2 to 1.8 units and a 2 ton unit roughly 1.7 to 2.4 units. An inverter model that has cooled the room drops well below its rated draw; a fixed-speed model switches off and on instead. Over an eight-hour night in a closed bedroom, with the compressor active for about two-thirds of the time, a 1.5 ton unit uses about 6 to 10 units, or 180 to 300 units over a thirty-day month. Two such units add roughly 360 to 600 units to the month; three add 540 to 900. On top sits the base load the winter bill already shows: the refrigerator, lighting, the water pump. A home that reads 250 units in February and 800 in June has not changed its habits; it has switched on the cooling. To check your own figure, multiply the nameplate input in kW by the hours a day each unit runs, by about two-thirds for compressor cycling, and by the days in the month. The star label's yearly units figure, divided by twelve, is a second rough check. ## Why the Delhi bill rises faster than the units Delhi's domestic energy charges are telescopic: each unit is billed at the rate of the slab it falls in, and the last schedule DERC published, for FY 2021-22, is ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit. The top rate is more than two and a half times the bottom one. On the energy charge sits a fixed charge by sanctioned load, ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month, then the 8% regulatory asset surcharge on the two together, then the power purchase adjustment charge (PPAC), the fuel surcharge DERC now lets the electricity boards revise every month. In June 2026 it was 17.94% for BSES Rajdhani, 17.43% for BSES Yamuna and 18.50% for Tata Power-DDL. Together the two surcharges add roughly a quarter to the energy and fixed charges. The calculator makes the effect visible. Take a BSES Rajdhani home with a 5 kW sanctioned load. At 800 units its consumption is 2.7 times a 300-unit month, but its bill is about 3.4 times, because the extra 400 units all land in the 401 to 800 slab and both surcharges are then applied to the larger total. Slabs are why "my bill doubled but my usage did not" is a true sentence in Delhi every June. Delhi's free-power concession, as reported, is 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in. It is written for months of up to 400 units; what a month of 800 units receives is not in the published terms we hold, so the calculator leaves the concession out and shows the tariff bill. With solar, the concession is worked out on net units, that is import minus export, which is how a rooftop system can bring a summer month back inside the band. ## Why the Noida bill rises: the Uttar Pradesh slabs Noida, Greater Noida and Ghaziabad bill on the Uttar Pradesh urban domestic tariff. The FY 2026-27 slabs, which UPERC left unchanged, are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, with a fixed charge of ₹110 per kW per month of sanctioned load. The calculator applies no surcharge in Uttar Pradesh and leaves electricity duty out in both states. The ladder is flatter than Delhi's: the top rate is about a quarter above the bottom one. So the same jump from 300 to 800 units on a 5 kW load raises a Noida bill about 2.5 times, close to the 2.7 times the units rose. The catch is where the ladder starts. The lowest Uttar Pradesh rate is above Delhi's second slab, so a Noida home pays more than a Delhi home for a 300-unit winter month and roughly the same for an 800-unit summer one. The [Delhi tariff page](/learn/delhi-electricity-tariff-explained) and the [Noida tariff page](/learn/noida-electricity-tariff-explained) walk through one bill line by line. ## What size solar covers two or three air conditioners Rooftop solar does not stop the air conditioners drawing power. It puts units into the grid by day and takes them back at night through net metering, so what matters is monthly generation against monthly use. On the planning yield Verde Solaire publishes, with a 10% derate for dust and heat, a 3 kW system generates about 326 units a month in Delhi and about 338 units a month in Noida; a 5 kW system generates about 544 units a month in Delhi and about 563 units a month in Noida. Against the estimate above, 3 kW covers the base load and one air conditioner run through the night; 5 kW covers two, or three run for fewer hours. The scheme's own sizing guide says the same in units: 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. Three things decide between the two sizes. First, the twelve-month average, not June: the [size calculator](/tools/system-size-calculator) works from it, and summer alone will oversize the system. Second, the subsidy: the central subsidy is capped at ₹78,000 from 3 kW upwards, so the fourth and fifth kW are paid for in full; the [3 kW or 5 kW guide](/learn/3-kw-vs-5-kw) sets the two side by side. Third, the sanctioned load, which two or three air conditioners usually push to 5 kW or more and which sets the Delhi fixed charge. In Delhi, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. ## Savings that cost nothing, or nearly nothing Solar is the large lever, but the cheap ones come first, because a smaller load means a smaller system. - **Thermostat.** Every degree below what the room needs costs extra compressor hours. 24 to 26 °C with the ceiling fan on is the standard advice; 18 °C on a hot evening is the most expensive habit in the house. - **Servicing.** A choked filter and a dirty outdoor coil make the compressor run longer for the same cooling. Clean the filter every few weeks in summer and have the coils serviced before the season. - **Seal the room.** Gaps under doors, a window that does not close and afternoon sun on the glass all add compressor hours. - **Timers and sleep mode.** A unit cooling an empty room at three in the afternoon is the commonest waste. Sleep mode raises the set point as the room cools. - **Replacing an old unit.** A ten-year-old fixed-speed air conditioner is often the largest load in the house. A 5-star inverter model of the same tonnage draws less for the same cooling, and the star label's yearly figure lets you compare two before buying. - **Read the bill.** Check the sanctioned load, which sets the fixed charge, and in Delhi the PPAC line. If the home stays under 400 units, make sure you have opted in to the free-power concession. ## Questions **How many units does a 1.5 ton AC use per hour?** As an engineering estimate, roughly 1.2 to 1.8 units an hour while the compressor runs at full load, and less once an inverter model has cooled the room. Over an eight-hour night that is about 6 to 10 units; over a month, 180 to 300 units. The rated power input on the nameplate is the exact figure for your unit. **How much electricity does a 1 ton AC use per hour?** Roughly 0.8 to 1.2 units an hour at full load as a rule of thumb, and a 2 ton unit roughly 1.7 to 2.4. For a monthly estimate, multiply the nameplate input in kW by the hours a day it runs, by about two-thirds for compressor cycling, and by the days in the month. **Why is my electricity bill so high in summer in Delhi?** Delhi's domestic slabs are telescopic: ₹3.00 per unit up to 200 units, ₹4.50 for 201–400, ₹6.50 for 401–800, ₹7.00 for 801–1,200 and ₹8.00 above that (DERC FY 2021-22 schedule, the last published order). Air conditioners push the month into the higher slabs, and an 8% regulatory asset surcharge plus a monthly PPAC of 17.94% (BSES Rajdhani, June 2026) are charged on top. A home going from 300 to 800 units sees its bill rise about 3.4 times, not 2.7. **What are the per unit electricity charges in Delhi?** For domestic connections, ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit, from DERC's FY 2021-22 schedule, the last tariff order published. Add a fixed charge of ₹20 to ₹250 per kW of sanctioned load a month, an 8% regulatory asset surcharge and the monthly PPAC, which was 17.43% to 18.50% across the three boards in June 2026. **What is the per unit electricity rate in Noida?** Uttar Pradesh urban domestic slabs for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 above 500 per unit, plus a fixed charge of ₹110 per kW of sanctioned load a month. **What size solar system do I need to run 2 ACs?** Usually 3 to 5 kW. On the published planning yield a 3 kW system generates about 326 units a month in Delhi and 338 in Noida; 5 kW about 544 and 563. Two 1.5 ton air conditioners run through the night use an estimated 360 to 600 units a month, so 5 kW covers them and 3 kW covers one plus the base load. Size on the twelve-month average, not on June. **Does solar cut only the summer bill, or the whole year's?** The whole year. Net metering credits the units you export: in Delhi credits roll over month to month and any surplus at the end of the financial year is paid at the DISCOM's average power purchase cost; in Uttar Pradesh residential users may choose net or gross metering under the 2019 UPERC regulations. Fixed charges stay on every bill. --- # Delhi electricity tariff explained (2026) Source: https://www.verdesolaire.com/learn/delhi-electricity-tariff-explained Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Delhi's domestic electricity tariff is telescopic, with five energy-charge slabs: ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit. On top of the energy charge sit a fixed charge of ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month of sanctioned load, an 8% regulatory asset surcharge, and a monthly power purchase adjustment charge (PPAC), which for BSES Rajdhani was 17.94% in June 2026. A 400-unit month on a 3 kW sanctioned load therefore comes to about before the free-power subsidy and electricity duty, and rooftop solar of 3 kW takes most of that away. This page works through each line of a Delhi domestic bill and then shows what a rooftop system does to every line. The tariff schedule is the latest published; the PPAC changes monthly and you should check your bill, and the free-power subsidy is subject to change. ## The energy charge: five slabs, billed telescopically Telescopic means each unit is charged at the rate of the slab it falls into, not that the whole month moves to a higher rate once a boundary is crossed. A 400-unit month pays the lowest rate on its first 200 units and the second rate on the next 200. The boundaries sit at 200, 400, 800 and 1,200 units, and the top rate is more than two and a half times the bottom one. The schedule itself is DERC's tariff order for FY 2021-22, published on 30 September 2021, and it remains the current schedule in 2026. This page will be updated if DERC publishes a new order. The slabs are why a Delhi bill rises faster than the units do: going from 300 to 800 units puts the extra 400 units into the third slab, and the surcharges below are then applied to the larger total. The [summer air-conditioning guide](/learn/cut-your-summer-ac-bill-delhi-noida) has the numbers for that jump. ## The fixed charge: by sanctioned load, not by use The fixed charge is ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month. Sanctioned load is printed on the bill; a 3 kW load falls in the 2 to 5 kW band. The charge does not depend on how many units you use, so it appears in a month of zero consumption and, as the solar section below shows, it stays on the bill after a rooftop system is connected. ## The regulatory asset surcharge An 8% surcharge is applied on the energy and fixed charges together. It comes from the same 2021 DERC order and recovers costs DERC has allowed the electricity boards to carry forward from earlier years. ## PPAC: the monthly fuel surcharge, different for each board The power purchase adjustment charge passes changes in the boards' power purchase and fuel costs on to consumers. Under a DERC order of 10 August 2026, reported by ETV Bharat, the boards may revise it every month. In June 2026 it was 17.94% for BSES Rajdhani, 17.43% for BSES Yamuna and 18.50% for Tata Power-DDL, applied on the energy and fixed charges. Because the figure moves, read the PPAC line on the month's bill rather than taking it from this page. Together the two surcharges add roughly a quarter to the energy and fixed charges, which is why the effective rate per unit is always above the slab rate. ## The free-power subsidy The Delhi government's free-power subsidy, as reported, is 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in. It is applied after the tariff lines above, and it is opt-in: households that have not opted in pay the full tariff. In August 2026 the government was reported to be considering an option for consumers to opt out of the subsidy . Two things follow. A household under 200 units a month pays little beyond the fixed charge, so its saving from solar is smaller than the tariff alone suggests. And the subsidy is written for months of up to 400 units, so a 600 or 800-unit summer month is billed on the full slabs. The [zero-upfront scheme page](/subsidy/delhi-zero-upfront-scheme) covers the 1 September 2026 Cabinet decision aimed at households under 400 units. ## A worked bill: 400 units, 3 kW sanctioned load Take a BSES Rajdhani home that used 400 units in June 2026 and has a sanctioned load of 3 kW. In words, the bill builds up like this. The first 200 units are charged at the lowest slab rate and the next 200 at the second rate, so the energy charge is . The fixed charge for a 3 kW load, in the 2 to 5 kW band, is . Those two lines together come to . The regulatory asset surcharge of 8% on that subtotal is . The PPAC at BSES Rajdhani's June 2026 rate on the same subtotal is about . The total is about , which works out to about per unit, above either slab rate the units were billed at. On BSES Yamuna the same month comes to about , and on Tata Power-DDL about , the only difference being the PPAC. Two lines are left out. Electricity duty is not modelled. The free-power subsidy, for a household that has opted in, would remove the charge on the first 200 units and halve the next 200 under the reported terms; since no official order confirms those terms, the calculator shows the tariff bill and leaves the subsidy line for you to compare with your own. ## How rooftop solar changes each line Net metering bills you on net units, that is import minus export, so the whole calculation above is redone with a smaller number of units. On the planning yield Verde Solaire publishes, with a 10% derate for dust and heat as a stated assumption, a 3 kW system in Delhi generates about 326 units a month. For the 400-unit home that leaves about 74 net units. The energy charge falls to , because all 74 units sit in the first slab. The fixed charge stays at , because the sanctioned load has not changed. The surcharge and the PPAC, being percentages of a smaller subtotal, fall to about and . The bill comes to about , a saving of about a month on the calculator's assumptions. The fixed charge is now the largest line on the bill. The free-power subsidy interacts with solar in one specific way: it is worked out on net units, that is import minus export. A home that nets 74 units is inside the free band under the reported terms, so the energy charge would be waived, but the fixed charge is billed on load and does not go away. So solar does not make a Delhi bill zero unless the net units stay low enough for the subsidy to take the whole bill. In summer the effect is larger. A home at 800 units with a 5 kW system nets about 256 units, so the units billed in the third slab disappear first, at the highest rate the home was paying. Size on the twelve-month average, not on June: the [system size guide](/learn/what-size-solar-system-do-i-need) covers it, and the [Delhi 3 kW page](/pricing/delhi/3-kw) has the price after subsidy for the system in this example. ## Questions **What is the per unit electricity rate in Delhi in 2026?** For domestic connections, ₹3.00 per unit for the first 200 units, ₹4.50 for 201–400, ₹6.50 for 401–800, ₹7.00 for 801–1,200 and ₹8.00 above 1,200. These are DERC's FY 2021-22 rates, the last tariff schedule it published; news reports confirm the same rates apply in 2026. A fixed charge, an 8% regulatory asset surcharge and a monthly PPAC are added on top. **What is PPAC in a Delhi electricity bill?** PPAC is the power purchase adjustment charge, a surcharge that passes the electricity board's changing fuel and power purchase costs on to consumers. DERC now lets the boards revise it every month. In June 2026 it was reported at 17.94% for BSES Rajdhani, 17.43% for BSES Yamuna and 18.50% for Tata Power-DDL, applied to the energy and fixed charges. **Is electricity free up to 200 units in Delhi?** Yes: 0–200 units a month are free and 201–400 units are charged at half price, capped at ₹800 a month, and you must opt in, as reported by trade and news sources. No DERC or Delhi government order has been published confirming these terms, so check the current position on the Delhi Solar Portal or your bill. With rooftop solar the subsidy is worked out on net units, that is import minus export. **How is a 400-unit bill worked out in Delhi?** For a 3 kW sanctioned load on BSES Rajdhani: 200 units at ₹3.00 and 200 at ₹4.50 give an energy charge of ₹1,500; the fixed charge is ₹50 per kW, so ₹150; the 8% surcharge on ₹1,650 is ₹132; the June 2026 PPAC of 17.94% on the same ₹1,650 is about ₹296. That is about ₹2,078 before the free-power subsidy and electricity duty, or about ₹5.20 per unit. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # Delhi free solar route is live on the Solar Portal Source: https://www.verdesolaire.com/updates/delhi-cabinet-zero-upfront-scheme Updated: Thu Sep 24 2026 00:00:00 GMT+0000 (Coordinated Universal Time) This update replaces the earlier “approved, not live” status. Delhi’s official Solar Portal now says the second amendment is notified and implemented, and it accepts consumer consent for the ULA installation route. Eligible homes using up to 400 units a month can receive a free 2 or 3 kW system, subject to the portal check and technical feasibility. The portal lists a separate paid route above 400 units: up to ₹78,000 central subsidy plus up to up to ₹78,000 Delhi subsidy. The application is available on the [Delhi Solar Portal](https://solar.delhi.gov.in/). Its guide says IPGCL is selecting ULA vendors through a tender and that the selection process may take about 1.5–2 months. Do not pay an intermediary to “reserve” a place; submit consent directly and keep the reference number sent by SMS. For the current steps and limits, see the [Delhi free solar scheme guide](/subsidy/delhi-zero-upfront-scheme). ## Questions **Is Delhi's zero-upfront solar scheme live?** Yes. Delhi’s Solar Portal accepts ULA consent and checks eligibility using the consumer account number. **What does the free route cover?** Eligible residential consumers using up to 400 units a month can receive a 2 or 3 kW rooftop system at no cost, subject to technical feasibility. --- # Delhi free solar scheme: how the current ULA route works Source: https://www.verdesolaire.com/subsidy/delhi-zero-upfront-scheme Updated: Thu Sep 24 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Delhi’s free solar route is live. The official Delhi Solar Portal accepts consent for the Utility-Led Aggregation (ULA) scheme and checks the applicant’s consumer account number before showing the applicable category. Eligible residential consumers using up to 400 units a month can receive a 2 or 3 kW rooftop system at no cost. The system is not a cash payment: the selected vendor installs it after the portal check, tender process and technical-feasibility assessment. ## What the portal currently shows The portal has three categories: - **0–200 units a month:** a free rooftop system, an additional monthly benefit shown by the portal, and DISCOM payment for surplus solar power. - **201–400 units a month:** a free rooftop system and DISCOM payment for surplus solar power. - **Above 400 units a month:** up to ₹78,000 under PM Surya Ghar and up to up to ₹78,000 from Delhi; the household pays the net project cost after the applicable subsidies. The free ULA option is for 2 kW or 3 kW. It is not a promise that every roof is feasible: the selected vendor visits and assesses the site first. ## How to apply 1. Open [Delhi Solar Portal](https://solar.delhi.gov.in/) and select **Confirm & Apply Now**. 2. Enter the CA number, DISCOM and mobile number, then verify the OTP. 3. Review the category and benefit that the portal shows for the connection. 4. Choose 2 kW or 3 kW, provide the site details, and submit consent. 5. Save the reference number. IPGCL is selecting vendors by tender; the portal says this can take about 1.5–2 months. 6. If the selected vendor finds the roof technically feasible, the installation proceeds. The portal accepts BRPL, BYPL, TPDDL, NDMC and MES consumer accounts. Keep the reference number; it is sent by SMS after submission. ## If the free route is not for you Homes above 400 units a month, homes needing more than 3 kW, and sites that fail the technical assessment can still use the subsidised route. A 3 kW Delhi system has ₹1,56,000 in combined capital subsidy, before the final site-specific quote. For a paid route, start with start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. Get a written quote that separates gross cost, central subsidy, Delhi subsidy and your net payable amount. Do not add a generation-based incentive to the estimate: the current live ULA guide does not offer one for new applications. Surplus-power settlement is separate; [Delhi net metering](/net-metering/delhi) explains it. ## Questions **Is Delhi's free solar panel scheme live?** Yes. Delhi's Solar Portal accepts consumer consent for the ULA scheme. The portal checks the CA number and shows the available category before the application proceeds. **Who can get a free Delhi rooftop solar system?** The live portal guide lists eligible residential consumers using up to 400 units a month. The free ULA route is for a 2 or 3 kW system and remains subject to the portal check and technical feasibility. **What if my average use is above 400 units?** The portal lists the central PM Surya Ghar subsidy of up to ₹78,000 and Delhi state subsidy of up to ₹78,000. You pay the net project cost after those applicable subsidies. **Can I choose any vendor under the free scheme?** No. IPGCL is selecting ULA vendors through a tender. The portal says selection may take about 1.5 to 2 months; the selected vendor will assess technical feasibility. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # Delhi solar subsidy and free solar route in 2026 Source: https://www.verdesolaire.com/subsidy/delhi Updated: Thu Sep 24 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A 3 kW rooftop system on a Delhi home can receive ₹1,56,000 in combined capital subsidy: ₹78,000 from PM Surya Ghar and up to ₹78,000 from Delhi. On Verde Solaire’s published July 2025 price range, that leaves ₹43,000 to ₹54,000 before any site-specific changes. For eligible residential consumers using up to 400 units a month, first check the live free ULA route. It provides a 2 or 3 kW system at no cost, subject to the portal check and technical feasibility. The current portal guide—not an older policy page or a sales estimate—is the source to use for a new application. ## Delhi subsidy by capacity | System | Central | State | Total | |---|---|---|---| | 1 kW | ₹30,000 | ₹26,000 | ₹56,000 | | 2 kW | ₹60,000 | ₹52,000 | ₹1,12,000 | | 3 kW | ₹78,000 | ₹78,000 | ₹1,56,000 | | 5 kW | ₹78,000 | ₹78,000 | ₹1,56,000 | | 10 kW | ₹78,000 | ₹78,000 | ₹1,56,000 | The portal shows a lower Delhi state share at 2 kW and the state maximum at 3 kW, in addition to the central subsidy. A 5 kW or 10 kW home system does not gain more capital subsidy than 3 kW, so a written quote must show gross price, central subsidy, Delhi subsidy and the net amount separately. ## The free 2–3 kW ULA route Delhi’s official portal now says the second amendment is notified and implemented. The category shown after the CA-number check determines the path: - **0–200 units a month:** free rooftop system, an additional monthly benefit shown by the portal, and DISCOM payment for surplus solar power. - **201–400 units a month:** free rooftop system and DISCOM payment for surplus solar power. - **Above 400 units a month:** up to ₹78,000 central subsidy and up to ₹78,000 Delhi subsidy; the consumer pays the net cost. The free route is for 2 kW or 3 kW. The government is selecting ULA vendors through tender; the application guide says that process may take around 1.5–2 months. A selected vendor will then assess the roof. These are application conditions, not a promise that every connection or roof will qualify. The [Delhi free solar scheme guide](/subsidy/delhi-zero-upfront-scheme) gives the exact portal steps. ## Do not budget a GBI Old policy material and older pages may mention a five-year generation-based incentive. Do not include that amount in a new Delhi quote, calculator result or payback estimate. The current official consumer guide describes the active ULA categories and DISCOM payment for surplus solar power; it does not offer a new GBI entitlement. Surplus-power settlement is separate from capital subsidy and depends on net-metering rules. [Delhi net metering](/net-metering/delhi) explains the connection process and year-end settlement. ## Where to apply Start on the [Delhi Solar Portal](https://solar.delhi.gov.in/). Enter the CA number, DISCOM and mobile number, complete the OTP, then review the category the portal displays. For the free route, choose 2 kW or 3 kW and submit consent. Save the reference number sent by SMS. For a paid PM Surya Ghar route, the central scheme still requires an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy and the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. The DERC rules waive application and registration fees for domestic rooftop connections up to 10 kW under PM Surya Ghar; the [how-to-apply guide](/subsidy/how-to-apply) covers the broader paperwork. ## What solar does not change on a Delhi bill Delhi’s electricity subsidy and solar subsidy are different. The published free-power subsidy is 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in. With solar, it is worked out on worked out on net units, that is import minus export. Fixed charges, surcharges and DISCOM settlement rules still matter, which is why the [bill calculator](/tools/electricity-bill-calculator) keeps them separate from project-price subsidy. ## Questions **How much solar subsidy do I get in Delhi in 2026?** A 3 kW system has up to ₹1,56,000 in capital subsidy: ₹78,000 from PM Surya Ghar and up to ₹78,000 from Delhi. The portal shows ₹52,000 Delhi subsidy at 2 kW and ₹78,000 at 3 kW. **Is Delhi's free solar panel scheme live?** Yes. The Delhi Solar Portal accepts ULA consent. Eligible residential consumers using up to 400 units a month can receive a 2 or 3 kW rooftop system at no cost, subject to the portal check and technical feasibility. **What happens if I use more than 400 units a month?** The portal lists up to ₹78,000 central and up to ₹78,000 Delhi subsidy. You pay the net project cost after applicable subsidies. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # DERC: net meter within 10 days up to 10 kW Source: https://www.verdesolaire.com/updates/derc-10-day-net-metering-rule Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) On 16 July 2026 the Delhi Electricity Regulatory Commission (DERC) issued the DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines, 2026. For a rooftop system up to 10 kW, the electricity board must now connect the net meter within 10 days of the application; above 10 kW the limit is 25 days. A domestic system up to 10 kW pays no application fee. The guidelines bind all three Delhi boards: BSES Rajdhani, BSES Yamuna and Tata Power-DDL. ## What the amendment says The guidelines make three changes under the 2014 net-metering regulations. 1. **A clock on the connection.** Up to 10 kW, the board has 10 days from the net-meter application to connect the system. Above 10 kW, it has 25 days. 2. **No application fee for small domestic systems.** A domestic rooftop system up to 10 kW pays no fee to apply for net metering. 3. **Two application routes.** Under the amended guidelines, PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. In Delhi that means start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. The feasibility rule is older and unchanged. Since the First Amendment Regulations of 26 July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. ## What changes for a Delhi applicant The connection timeline is the part most people will feel. Before the amendment the guidelines had no day count, and installers planned on the board's own pace: Verde Solaire's Delhi post of 14 July 2025 told customers to expect 20 to 30 days for the net meter. The regulator has now written 10 days for a home-sized system. That is a deadline for the board, not a promise from the installer. The [Delhi net-metering guide](/net-metering/delhi) sets the regulator's figures against what we see on the ground. The 10 days start when the net-meter application goes in, after the plant is installed and its details are submitted, not on the day of installation. The [how to apply guide](/subsidy/how-to-apply) shows where that step falls in the portal sequence. The two routes matter at the first step. If you are taking the PM Surya Ghar: Muft Bijli Yojana subsidy, the application starts on the national portal and the board picks it up from there. If you are installing without the subsidy, you go straight to your board: [BSES Rajdhani](/net-metering/board/bses-rajdhani), [BSES Yamuna](/net-metering/board/bses-yamuna) or [Tata Power-DDL](/net-metering/board/tata-power-ddl). ## If the 10 days pass Check the stage on the portal, then call the board with your consumer number and application number and name the guideline of 16 July 2026. BSES Rajdhani's rooftop solar desk is rts.bsesdelhi.com (helpline 19123, extension 3). Tell your installer the same day. The [installed but not activated](/learn/installed-but-not-activated) page covers a system that sits idle after installation. ## Questions **How long does net metering take in Delhi after the July 2026 DERC amendment?** Under the DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines of 16 July 2026, the electricity board is to connect a rooftop system up to 10 kW within 10 days of the net-meter application, and a system above 10 kW within 25 days. The rule applies to BSES Rajdhani, BSES Yamuna and Tata Power-DDL. **Is there an application fee for net metering in Delhi?** Not for a domestic system up to 10 kW. The 16 July 2026 guidelines remove the application fee for that category. Larger and non-domestic systems are outside this exemption; ask your board what applies. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Does the 10-day rule mean my system will be running 10 days after installation?** No. The 10 days run from the net-meter application, after the plant is installed and its details are submitted, not from the day of installation or the day you paid. It is also a regulator's deadline for the board, not a guarantee; if it passes, call the board with your application number. **Did the 2026 amendment change the feasibility study rule?** No. The feasibility rule comes from the First Amendment Regulations of 26 July 2024: no feasibility study is needed up to 10 kW on the same supply type, and the board handles any load increase or transformer upgrade. The 2026 guidelines add the timelines, the fee exemption and the two application routes on top of that. --- # Free solar calls and SMS: scam or genuine? Source: https://www.verdesolaire.com/learn/free-solar-scam-calls Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A call or text offering "free solar panels", a "PM Surya Ghar approval" that needs a fee, or a "last date" that is tomorrow is not from the scheme. The PM Surya Ghar: Muft Bijli Yojana does not give away panels. You pay the installer for the system, and the government then pays a fixed subsidy of up to ₹78,000 into your own bank account after commissioning, officially "within 30 days" of the claim; about 15 days on average. None of the nine official steps involves paying the government, nobody phones you to "release" the money, and nobody needs your one-time password (OTP). Delhi's announced zero-cost scheme was approved by the Cabinet but has not yet been notified, and registration is not open. Here is what is real, what is not, and how to check any caller, including one who says they are from Verde Solaire. ## What "free solar" actually means The scheme's name promises free electricity, not free equipment. The subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, so ₹78,000 at 3 kW and nothing more above that. A 3 kW system on Verde Solaire's published list costs ₹1,99,000 to ₹2,10,000 before subsidy, so the subsidy is a large discount on a real price, not a gift. The money moves once, from the government to you, after the net meter is in. The [money-flow page](/subsidy/who-pays-whom) walks through every stage. Delhi is the exception, so far only on paper. On 1 September 2026 the Delhi Cabinet approved a 2 or 3 kW rooftop system at no cost for eligible residential consumers using up to 400 units a month. On 16 September 2026 the notification had not been published and there was nothing to register for. Anyone offering to "book your slot" for a fee is selling something the government has not yet built. The [zero-upfront explainer](/subsidy/delhi-zero-upfront-scheme) has the detail. ## Genuine costs, and the fees that are not Three kinds of money are real: the system price, paid to the installer against a written quote that names the make and model of every component; whatever your electricity board, the distribution company (DISCOM) named on your bill, charges for the net meter; and a loan, if you take one. In Delhi there is no application fee for domestic systems up to 10 kW since 16 July 2026 under the Delhi Electricity Regulatory Commission (DERC) guidelines, and any meter or line charge is paid only to the board. For Uttar Pradesh no fee schedule is published, so ask your DISCOM for the figure in writing rather than paying what a caller quotes. The scheme's loan is collateral-free, from nationalised banks; a bank processes it, not the person who rang you. Everything else is a red flag: - **A "processing", "registration" or "approval" fee for the subsidy.** None of the nine official steps involves paying the government. A real approval shows on the portal when you log in, and costs nothing to see. - **A request for an OTP.** The portal sends it to your mobile so that you log in as yourself. Anyone asking you to read it out is trying to act as you, on the portal or at your bank. - **A cash advance without a quote.** Money before a survey or a written quote, in cash, or to a personal Unified Payments Interface (UPI) handle, is the pattern Saur Energy's July 2026 report on solar frauds calls the vanishing installer: a contractor collects an advance and disappears. Its advice is to stage payments against delivery and to check that the receiving account name matches the registered company. - **A deadline of days.** The scheme runs until 31 March 2027. The short timelines belong to the electricity board, such as Delhi's 10 days for a connection up to 10 kW, and those work in your favour. - **A "government officer" asking for your bank details.** You enter your bank details and a cancelled cheque on the portal yourself, at step eight, after commissioning. ## How to verify any caller The check uses only sources you control. 1. **Look the vendor up yourself.** Under the scheme, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. The vendor lists are published per electricity board, and Delhi's solar portal links to each one. Registration can be withdrawn: in August 2026 the Ministry of New and Renewable Energy (MNRE) deactivated 66 vendors over pending applications, so check the live list, not last year's certificate. 2. **Log in to the portal on your own phone.** Any application in your name is visible at pmsuryaghar.gov.in once you register with your consumer number and mobile number. If a caller says you are approved and the portal does not, the caller is wrong. An application you did not make means a vendor has used your details. 3. **Ask your electricity board, not the caller.** Only the DISCOM on your bill inspects the system and installs the net meter. BSES Rajdhani's rooftop portal is rts.bsesdelhi.com (helpline 19123, extension 3); Tata Power-DDL publishes the net-metering application and manual on tatapower-ddl.com. The [board guides](/net-metering) cover PVVNL, NPCL and PUVVNL. 4. **Call the company back on a number you found yourself.** Dial the number printed on the company's own website. Verde Solaire's numbers are on the [contact page](/contact); a caller claiming to be us who will not let you hang up and call back is not us. 5. **Insist on paper before money.** A genuine quote carries the company's name, its GST identification number (GSTIN), the make and model of the panels and inverter, the price before subsidy, the subsidy and the net figure. Verde Solaire's published GSTIN is GSTIN 09AAGCV4977Q1Z6, and any quote or invoice from us should match it. The [advance checklist](/learn/before-you-pay-the-advance) and the [vendor verification guide](/learn/verify-your-pm-surya-ghar-vendor) have the detail. ## What Verde Solaire will never ask for Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, so the portal, not a phone call, is where our name appears against your application. We offer a free site evaluation and no-obligation proposal, so nothing is paid before you have a written quote. We will never ask you for: - an OTP, a portal password, a bank password, a card number or a UPI PIN; - a fee to "approve", "register", "process" or "release" the subsidy, because there is none; - cash, or a payment to an individual's account; every payment goes to the company account named on the quote; - an advance before a survey and a written quote; - your bank details before commissioning, because you enter them on the portal yourself. What we do is register the application with you on the survey visit, install, file for the net meter with your electricity board, and follow the subsidy through to your account. Mr. L. R. Singh, a Noida customer, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". ## If you have already paid someone Stop further payments and keep the call log, the SMS and the receipt. Log in to the portal to see whether an application exists in your name and which vendor it names. If money has left your account, tell your bank the same day and report it on the National Cyber Crime Reporting Portal. Then send us the details below; an engineer will tell you, without charge, whether what you were promised exists in the scheme. ## Questions **Is the PM Surya Ghar scheme free solar?** No. You pay the installer for the system, and the government pays a subsidy of ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000, into your bank account after commissioning, officially within 30 days of the claim. **I got an SMS saying my solar subsidy is approved and asking for a processing fee. Is it genuine?** No. None of the nine official steps involves a fee to the government, and the subsidy is paid to you, not collected from you. Log in to pmsuryaghar.gov.in yourself: a real approval shows there and costs nothing to see. **Does a solar company need my OTP to apply for the subsidy?** No. The one-time password is for your own login on the portal. Type it in yourself and never read it out to anyone, including an installer. A caller who wants it is trying to act as you on the portal or on your bank account. **Is Delhi's free solar scheme open for registration?** Not yet. The Delhi Cabinet approved up to 3 kW at zero upfront cost for households averaging 400 units a month or less on 1 September 2026, but the notification has not been published and there is nothing to register for yet. A caller taking a fee to book your slot is ahead of the government. **How do I check whether a solar company is a registered PM Surya Ghar vendor?** Log in to pmsuryaghar.gov.in and use the vendor list for your electricity board; Delhi's solar portal links to each DISCOM's list. Check the live list, not a certificate, because MNRE deactivated 66 vendors in August 2026. Verde Solaire is registered in both Delhi and Uttar Pradesh. **What should I do if I have already paid a fee to a caller?** Stop further payments, keep the call log, the SMS and the receipt, tell your bank the same day and report it on the National Cyber Crime Reporting Portal at cybercrime.gov.in. Then log in to the PM Surya Ghar portal to see whether any application exists in your name. --- # Greater Kailash, Delhi: 10 kW bifacial Source: https://www.verdesolaire.com/projects/greater-kailash-delhi-10-kw-bifacial Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 10 kW rooftop solar system at a home in Greater Kailash, New Delhi, using 530 Wp Adani bifacial modules, and facilitated the subsidy application for the owner. The company published the project on 27 May 2023 while installation was in progress, and the owner later wrote that the bifacial panels were supplied at no extra charge over the mono PERC panels he had agreed to. The published specification, the raised bifacial array shown in the installation photo, the owner's feedback and the current rules for a 10 kW home system in Delhi are brought together here. ## The system as published | Item | Published figure | |---|---| | Location | Greater Kailash, New Delhi | | Type | Residential rooftop | | Rated capacity | 10 kW | | Modules | 530 Wp Adani bifacial | | Subsidy | Facilitated by Verde Solaire | | Posted | 27 May 2023, installation in progress | At 530 Wp, a 10 kW array uses roughly 19 modules. The elevated structure keeps the rear face of the bifacial panels clear to receive reflected light from the roof. ## Why the panels sit on a raised structure A bifacial module has cells that work from both faces. The front takes direct sunlight in the ordinary way; the rear takes light that bounces up from the roof surface. That rear contribution only exists if there is a gap under the panels, so the array in the photo is mounted on a tall galvanised frame with nothing between the modules and the roof. A panel of this type laid flat on a roof would perform like a standard one. The structure also leaves the roof usable underneath, which is a common request on a Delhi home where the terrace is living space. The [solar panels page](/equipment/solar-panels) explains mono PERC, bifacial and TOPCon modules, and the [Janakpuri 10 kW project](/projects/janakpuri-delhi-10-kw) is a comparable Delhi installation with a named inverter. ## What the owner said Jai Kumar Manghnani wrote on Verde Solaire's testimonials page: "We had agreed for 530W Mono Perc Adani solar panels for my solar energy system, but they installed a better bifacial solar panel of Adani without charging anything extra from us." He added that "the processes were simple and they have also helped in applying for central subsidy for solar power plant", and that his family recommends the company for installing a solar power plant. ## What this means for a Delhi home today Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. The net-metering steps for each Delhi electricity board are on the [Delhi net-metering page](/net-metering/delhi); the name on your bill says which one applies. Current prices for this size are on the [10 kW pricing page](/pricing/10-kw), the Delhi subsidy rules on the [Delhi subsidy page](/subsidy/delhi), and every published installation on the [projects page](/projects). ## Questions **What size is the Greater Kailash solar system and which panels were used?** It is a 10 kW residential rooftop system at a home in Greater Kailash, New Delhi, installed with 530 Wp Adani bifacial solar panels, as Verde Solaire published on 27 May 2023 while the work was in progress. **What is a bifacial solar panel?** A bifacial panel has cells that collect light on both faces. The front takes direct sunlight and the rear takes light reflected up from the roof surface, which is why the Greater Kailash array sits on a raised open structure rather than flat on the roof. **Did the customer pay extra for bifacial panels?** No. The owner, Jai Kumar Manghnani, wrote on Verde Solaire's testimonials page that he had agreed on 530 W mono PERC Adani panels and that the company installed a better bifacial Adani panel without charging anything extra. **Was a subsidy claimed on this 10 kW system?** Verde Solaire's post says it facilitated the subsidy for this customer, and the owner's review says the company helped with the central subsidy application. The amount received has not been published. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # Greater Noida: 10 kW with a fast net meter Source: https://www.verdesolaire.com/projects/greater-noida-10-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) This 10 kW rooftop installation in Greater Noida uses an elevated array and a grid connection with a net meter. It is a useful reference for a larger home with the roof space and daytime consumption to make 10 kW worthwhile. ## At a glance | System detail | Project information | |---|---| | Type | Residential rooftop solar plant | | Location | Greater Noida, Uttar Pradesh | | Rated system power | 10 kW | | Connection | Grid connected, with a net meter installed by the DISCOM | | Project shared | April 2023 | The modules sit on an elevated structure that clears the parapet, with a second row mounted overhead. This approach can help fit a larger array while keeping more of the terrace usable. ## Getting the connection right Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Check the name on your bill before starting an application, as Noida city uses PVVNL instead. The rules for the connection come from the state regulator: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. How that works today for an NPCL connection, with the documents and the sequence, is on the [Greater Noida net-metering page](/net-metering/greater-noida) and the [NPCL board page](/net-metering/board/npcl). ## Is 10 kW the right size today? Choose 10 kW when your household regularly uses a large share of its electricity during the day and has enough unshaded roof. PM Surya Ghar: Muft Bijli Yojana, launched 13 February 2024, Cabinet-approved 29 February 2024, pays a central subsidy of ₹78,000 on any home system of 3 kW or more, and Uttar Pradesh adds ₹15,000 per kW capped at ₹30,000 per consumer, on top of the central subsidy. A 10 kW home system therefore receives the same subsidy as a 3 kW one, against a much higher price, which is why the payback on 10 kW depends on how much of the output the house actually uses. The [10 kW price page](/pricing/10-kw) and the [Greater Noida price page](/pricing/greater-noida) set out the current figures, and the [solar calculator](/tools/solar-calculator) takes your own units. ## Explore similar installations Verde Solaire's other published 10 kW homes are the [bifacial installation in Greater Kailash](/projects/greater-kailash-delhi-10-kw-bifacial) and the [Janakpuri plant](/projects/janakpuri-delhi-10-kw), both in Delhi and both with the module and inverter make named by the customer. In Greater Noida itself the company has also published a [35 kW plant at a college](/projects/greater-noida-college-35-kw), installed in 2019. If you have a Greater Noida roof and a bill that points to 5 kW or more, the [installation page for Greater Noida](/solar-installation/greater-noida) covers the survey, the NPCL application and the sequence from advance to net meter. ## Questions **How big is the Greater Noida solar plant on this page?** It is a 10 kW grid-connected rooftop solar plant at a home in Greater Noida, which Verde Solaire published on 6 April 2023. **Which electricity board installs the net meter in Greater Noida?** Greater Noida and Greater Noida West are served by NPCL, Noida Power Company Limited. Noida city is served by PVVNL. Check the name on your bill, because the two have separate portals. **Does a 10 kW home system get the PM Surya Ghar subsidy?** Yes, but the subsidy is capped: the central subsidy stops at ₹78,000 for 3 kW and above, and the Uttar Pradesh subsidy at ₹30,000. A 10 kW system receives the same ₹1,08,000 as a 3 kW system. --- # How to apply for PM Surya Ghar: 9 steps Source: https://www.verdesolaire.com/subsidy/how-to-apply Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) You apply for the PM Surya Ghar: Muft Bijli Yojana subsidy on the national portal, pmsuryaghar.gov.in, in nine steps: register, apply, wait for the electricity board's feasibility approval, install with a vendor registered on the portal, submit the plant details and apply for net metering, pass the inspection, receive the commissioning certificate, submit your bank details, and receive the subsidy, officially "within 30 days" of the claim; about 15 days on average. You pay the installer; the government pays you. The nine steps are the ministry's own list, in its order. This page explains what each stage means, where the official timelines stop and reported practice begins, and what a Delhi applicant must do that a Noida applicant need not. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and files the application with customers on the survey visit. ## Before you start: eligibility and documents The published conditions are short. The applicant must be an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The connection matters as much as the person: the electricity board checks the application against its own consumer records, so the name on the application should be the name on the bill. If the bill is in a parent's name, apply in that name and use that person's bank account for the subsidy. Keep the following ready before you open the portal; the portal and your electricity board set the final list. - **Your latest electricity bill.** The consumer number, the sanctioned load and the name of the distribution company are all read from it, and the number you type must match the bill exactly. - **Proof that you own the house**, such as the sale deed or the property tax receipt, because eligibility rests on owning the roof. - **A photo ID** of the applicant, usually Aadhaar, and a passport-size photograph. - **Bank account details and a cancelled cheque**, which are uploaded at step 8. The account should be in the applicant's name, because the subsidy is transferred to it. - **The mobile number linked to the connection.** It receives the one-time password at registration and the status messages afterwards. If you are not sure whether you qualify, the [eligibility checker](/subsidy/eligibility-checker) asks seven questions and gives a yes, a no or a conditional answer, with the documents to keep ready. ## The nine steps ## What each stage means, and how long it takes The ministry publishes a timeline for the last step only. For the rest, the answer is a mix of regulation, the electricity board's practice and the installer's speed, and it helps to know which of the three you are waiting on. **Registration and application (steps 1 and 2).** Both can be finished in one sitting with the bill in front of you. The portal wants the consumer number exactly as printed and the mobile number the board has on record; a mismatch on either is the most common reason a registration fails. The application then asks for the system size in kW and the vendor. Size it from twelve months of bills, not from the summer peak: the ministry's own guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. A size above the sanctioned load on the bill needs a load increase, which the electricity board handles. Choose the distribution company with care, because Noida city and Greater Noida are served by different companies and the name at the top of the bill settles it; the [net-metering hub](/net-metering) lists who serves where. **Feasibility approval (step 3).** The electricity board checks that the local network can take the export. In Delhi, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. Neither the ministry nor UPERC publishes a deadline for this stage. Verde Solaire's own 2025 guide put it at a few days, and that remains typical for a standard domestic connection. Applications that stall here usually carry a mismatch: a wrong consumer number, a name that differs from the bill, or a size above the sanctioned load. **Installation (step 4).** This is the one step that sits entirely with the vendor. Subsidised systems must meet two rules: both the modules and the cells must be made in India, and since 1 June 2026 the cells must be on the ALMM List-II, the ministry's approved list of models and manufacturers ([ALMM List-II explained](/learn/almm-list-ii-explained)). The quote should say how many days the installation will take once material is on site, and every panel and inverter should be named by make and model so that you can check them against the lists. **Plant details and the net-metering application (step 5).** The vendor uploads the installation photographs, the module and inverter details and the safety certificate, and applies for net metering. Check that the uploaded serial numbers are the ones on your roof; the inspector compares them against the plant. **Inspection and the net meter (step 6).** This is the stage customers ask about most, because it belongs to the electricity board. In Delhi the rule is now written down: under DERC's Second Amendment Guidelines of 16 July 2026, the connection is due within 10 days for systems up to 10 kW and 25 days above, with no application fee for domestic systems up to 10 kW. In Uttar Pradesh, UPERC's regulations let a residential consumer choose net or gross metering, but there is no published deadline for the meter itself, so your DISCOM's practice sets the timeline. Arun Sibal, whose system is at his New Delhi house, wrote: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde. In fact Verde people always kept me in the loop regarding the net meter status." That is the right expectation: the installer cannot make the board move faster, but it can chase and keep you informed. **Commissioning certificate (step 7).** Generated on the portal once the meter is in and the inspection is recorded. It turns the installation into a subsidy claim, and the payout clock runs from its date. **Bank details and cancelled cheque (step 8).** Submitted on your login, not the vendor's. The account must be in the applicant's name. A wrong account number at this step is the one error that nobody else can catch for you. **Subsidy credited (step 9).** The official figure is "within 30 days" of the claim; about 15 days on average. Trade and news reports describe 30–45 days after verification in practice. Both figures count from the claim, not from the day you paid the advance. Add the installation, the inspection and the certificate, and the realistic span from application to money in the bank is a few months, with the electricity board's stages the least predictable part. ## Choosing the vendor on the portal The scheme's rule is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. The choice is made at step 2 and decides who moves your file for the rest of the process. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, so it appears in the vendor lists for the Delhi distribution companies and for the Uttar Pradesh companies that serve Noida, Ghaziabad and Varanasi. The Delhi Solar Portal links to the vendor list for each DISCOM. Check the list yourself before paying an advance, and ask any vendor to show its registration on the portal; the [vendor verification guide](/learn/verify-your-pm-surya-ghar-vendor) shows where to look. In August 2026 MNRE deactivated 66 vendors for holding applications without progress, which is a reminder that a registered vendor can still be a slow one. If the vendor you chose has gone quiet, the [portal help page](/subsidy/portal-help) explains what each status means and how a vendor can be changed. ## Who pays whom You pay the installer the full price, or the bank does if you take a loan, and the government pays the subsidy to you after commissioning and the inspection. The subsidy is never deducted from the invoice; question any quote that shows it as a discount on an amount you cannot verify. A proper quote shows three lines: the gross price, the subsidy you will receive, and the net cost to you. The [money-flow page](/subsidy/who-pays-whom) walks through the sequence of payments with a worked example, and the [advance checklist](/learn/before-you-pay-the-advance) lists what the agreement should state before any money changes hands. If you finance the system, the scheme's loan is collateral-free, from nationalised banks, and the subsidy still comes to you, so it can prepay part of the loan. The [solar loan page](/solar-loan) has the current rate and the bank-by-bank terms. Two Noida customers have described the subsidy side of this. Mr. L. R. Singh, with a 6 kW system, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". Brij Lal Bhardwaj, with 4 kW in Sector 25, wrote that "Verde has also got the subsidy processed for my solar power plant". The follow-up is the part of the service that matters once the panels are up. The [Delhi subsidy page](/subsidy/delhi) has the full history and the per-unit arithmetic, and the [Delhi net-metering page](/net-metering/delhi) covers BSES Rajdhani, BSES Yamuna and Tata Power-DDL. The Delhi Cabinet also approved a zero-upfront scheme on 1 September 2026; the detailed rules have not yet been notified and registration is not yet open. The [zero-upfront explainer](/subsidy/delhi-zero-upfront-scheme) covers what is confirmed and what is still to come. ## Noida, Ghaziabad and Varanasi: the Uttar Pradesh top-up Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under the state's 2022 solar policy. There is no second portal for it. News reports from September 2026 describe combined central-plus-state totals of ₹45,000, ₹90,000 and ₹1.08 lakh for 1, 2 and 3 kW, paid by direct bank transfer 30–45 days after verification. The [Uttar Pradesh page](/subsidy/uttar-pradesh) covers UPNEDA's role, the district solar cells and which distribution company serves each city. ## Installing without the subsidy Some households skip the subsidy: they want imported panels, have had one before, or have a connection that does not qualify. The route then changes. PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal, and consumers who give up the subsidy are exempt from List-II until 31 March 2027. Net metering still applies, and the [net-metering hub](/net-metering) covers the board-by-board process. ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **What documents do I need to apply for the solar subsidy?** Your latest electricity bill, proof that you own the house, a photo ID and a passport-size photograph, and, at step 8, your bank account details with a cancelled cheque. The portal and your DISCOM set the final list. **How long does the PM Surya Ghar subsidy take to arrive?** Officially within 30 days of the claim, about 15 days on average, according to the ministry's March 2025 backgrounder. Trade and news reports put it at 30 to 45 days after verification in practice. The clock starts at the claim, not at the advance. **Can the installer apply on my behalf?** The application is in your name and on your login, but a registered vendor can sit with you and fill it in, and it uploads the plant details after installation. Verde Solaire does this on the survey visit. **Do I get the subsidy before I pay the installer?** No. You pay the installer the full price, or the loan does, and the government transfers the subsidy to your bank account after commissioning and the net meter inspection. It is never deducted from the invoice. **Which vendor should I choose on the portal?** Any vendor registered on pmsuryaghar.gov.in for your DISCOM. Verde Solaire is a registered PM Surya Ghar vendor in Delhi and Uttar Pradesh. Check the list yourself before paying an advance. **How long does the net meter take in Delhi?** Under DERC's Second Amendment Guidelines of 16 July 2026, the connection is due within 10 days for systems up to 10 kW and 25 days above, with no application fee for domestic systems up to 10 kW. --- # How to choose a solar company in Delhi NCR Source: https://www.verdesolaire.com/learn/how-to-choose-a-solar-company Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Choose a solar company by checking eight things: that it is a registered PM Surya Ghar: Muft Bijli Yojana vendor for your electricity board, that the quote names the panel and inverter model, that the cells are on ALMM List-II, that the structure is specified, that net metering, earthing and the AC and DC boxes are inside the price, that the quote shows who pays whom and when the subsidy arrives, that every warranty is in writing, and that someone answers the phone after commissioning. The rule behind the first check is short: the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. For each check, this page gives what a good answer looks like and how Verde Solaire answers it, from what the company has published. Put the same questions to every installer, including us, and compare the written answers. ## 1. Registration on the national portal **A good answer** is the firm's name on the vendor list for the board printed on your bill, and the same legal name on the quote and the GST invoice. The lists are kept per board, so a firm on the PVVNL list is not automatically on the BSES Rajdhani list. In Delhi the state solar portal links to each licensee's list; the [vendor verification guide](/learn/verify-your-pm-surya-ghar-vendor) shows where to look in Uttar Pradesh. A registration can be withdrawn: in August 2026 MNRE deactivated 66 vendors for a month for holding applications too long. **Verde Solaire** is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, as stated on its FAQ and in its application guide of May 2025. The firm is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. Those are separate programmes; only the PM Surya Ghar list matters for the subsidy, so check that one yourself. ## 2. Named components and ALMM **A good answer** is a panel make, model and wattage and an inverter make and capacity on the quote, not "Tier-1 panels" or "branded inverter". For a subsidised system, both the modules and the cells must be made in India, and for net-metering projects commissioned from 1 June 2026 the cells must be on ALMM List-II. A model you can name is a model you can check; [ALMM List-II explained](/learn/almm-list-ii-explained) shows how. **Verde Solaire** has published the makes on its installations: Adani, Vikram Solar and Waaree modules, and Delta, Schneider, KSolare and Havells inverters, each tied to a named project. Navin Verma, with 10 kW at his Janakpuri home, wrote that he "used Vikram solar panels and KSolare inverters with an elevated module mounting structure". A quote from us names every component so that you can check it, and so that any substitution has to be an upgrade you agreed to. ## 3. The structure **A good answer** describes the mounting structure: material, elevation, anchoring and the wind load it is designed for. Delhi NCR roofs take dust storms and monsoon gusts, and an unspecified structure is the part most likely to be under-built. Ask for a shadow analysis too. **Verde Solaire** publishes a planning figure of 300 to 350 square feet of shadow-free roof for 3 kW. K. K. Sharma, with 10 kW at his Chattarpur home, wrote: "I was highly impressed with their shadow analysis process." The elevated structure in the Janakpuri review above keeps the roof usable underneath the panels. ## 4. What is inside the price **A good answer** lists what the price covers, line by line: panels, inverter, structure, DC and AC cabling, the distribution boxes with surge protection, earthing, the net-metering application, the meter if it is charged, and commissioning. A price without net metering is not a price for a working system. **Verde Solaire's** published prices include panels, inverter, mounting, net metering, installation and warranty. Its pre-installation checklist of 17 September 2026 asks the homeowner to verify the cable specification, electrical protection, earthing and monitoring before work begins; expect the same lines on any quote, including ours. The published ranges by size are on the [pricing pages](/pricing); the written quote after a survey is the price. ## 5. Subsidy timing and who pays whom **A good answer** is the sentence "you pay us, and the government pays you", with gross price, subsidy and net shown as three separate lines. The subsidy reaches your bank account after commissioning and the net-meter inspection, officially "within 30 days" of the claim; about 15 days on average. Trade reports put practice at 30–45 days after verification in practice. **Verde Solaire's** application guide of May 2025 walks the homeowner through registering on the portal, selecting the vendor and claiming the subsidy, and the team follows the application through. Brij Lal Bhardwaj, with 4 kW in Sector 25, Noida, wrote that the team handled the documentation and the liaison for the net meter, and that "Verde has also got the subsidy processed for my solar power plant". L. R. Singh, with 6 kW in Noida, "was also able to get solar subsidy in record time because of the follow up of the team". The full money sequence is on [who pays whom](/subsidy/who-pays-whom). ## 6. Warranty terms in writing **A good answer** separates three warranties and names the years for each: the panel manufacturer's performance warranty, the inverter manufacturer's warranty, and the installer's own workmanship warranty, with a line on who you call for each. A single "25 years warranty" on a quote usually means the panel term alone. **Verde Solaire's** July 2025 price posts stated 25-year performance warranties on all three panel types, and its Dharuhera plant was published with a 10-year Havells inverter warranty. The workmanship term is set out in the written quote, not on this page; [warranty and after-sales](/about/warranty-and-after-sales) explains how a claim is handled. ## 7. After-sales and response **A good answer** is a named contact, a stated response time, and a maintenance schedule with the number of visits and what each covers. **Verde Solaire** publishes an Android app for its customers, and its reviews speak to the years after installation. S. C. Garg, whose Greater Kailash system was installed under the company's former name, wrote that it "has been working continuously without a single day breakdown since 2017". Sohail Dhir, with 12 kW in New Delhi, wrote that the company "is very prompt in responding to queries if any". The maintenance terms for your system belong in the quote; ask for them there. ## 8. References you can call **A good answer** is two customers in your city, with a size close to yours, whose numbers the installer shares with their permission. **Verde Solaire's** published reviews name the customer, the locality and the size, from 2 kW in Varanasi to 200 kW in Kanpur, and the [reviews page](/reviews) lists them verbatim. Parmod Jain, with 20 kW in Noida, wrote that a friend whose New Delhi plant the company had installed recommended it. Ask at the survey for a customer near you, and read the [project pages](/projects). ## Red flags - The firm is not on the vendor list for your board, or the name on the list does not match the quote. - The subsidy is shown as "deducted" from the invoice. The government pays you, not the installer. - A caller offers free solar for a processing fee; see [free solar scam calls](/learn/free-solar-scam-calls). - The panels are "Tier-1" and the inverter is "branded", with no model named. - GST is charged at the old 12% on panels. GST on a rooftop solar plant is now about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). - Most of the price is due before anything is delivered. The [advance checklist](/learn/before-you-pay-the-advance) sets out milestones tied to booking, delivery and commissioning. - The quote promises a zero bill. Fixed charges stay on the bill in both Delhi and Uttar Pradesh. - Nobody can say who files net metering; see [installed but not activated](/learn/installed-but-not-activated). ## Running the comparison Get two or three written quotes and lay them against the eight checks; a blank on any line is the answer. Weigh a national brand and a local firm on the same sheet, using the [national brand or local installer](/compare/national-brand-vs-local-installer) page. Verde Solaire's part starts with a free site evaluation and no-obligation proposal; the rest is on [how we work](/about/how-we-work). ## Questions **How do I check whether a solar company is genuine?** Find it on the PM Surya Ghar vendor list for your electricity board on pmsuryaghar.gov.in; in Delhi the state solar portal links the lists for BSES Rajdhani, BSES Yamuna and Tata Power-DDL. Then match the name on the list to the name on the quote and the GST invoice. A firm that is not on the list cannot install a subsidised system. **What questions should I ask a solar installer?** Eight: Are you registered on the national portal for my board? Which panel model and inverter model will you fit, and are the cells on ALMM List-II? What is the structure design and wind rating? Does the price include net metering, earthing and the AC and DC boxes? When does the subsidy arrive and who pays whom? What are the warranty terms, in writing? Who do I call after installation, and how fast do you respond? Can I speak to two customers in my city? **What should a rooftop solar quote include?** The vendor's registration, panel make, model and wattage, inverter make and capacity, structure and earthing, whether the system gives backup, the years of maintenance, who files net metering, a payment schedule tied to delivery and commissioning, and a GST invoice at 5%. **Is a national brand safer than a local installer?** Neither is safer by default. Both must be on the same vendor list and follow the same rules. Judge the quote, the named equipment, the warranty terms and the after-sales arrangement, not the size of the company. A local firm with an office you can visit is easier to hold to a promise. **Is Verde Solaire a registered PM Surya Ghar vendor?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, is ISO 9001:2015 certified and has delivered more than 50 MW of solar projects. Confirm the registration yourself on the list for your electricity board. **When does the solar subsidy come, and who pays whom?** You pay the installer; the government pays you. The central subsidy is transferred to your bank account after commissioning and the net-meter inspection, officially within 30 days of the claim and about 15 days on average. Trade reports put practice at 30 to 45 days. **What warranty should a solar installer give in writing?** Three separate terms: the panel manufacturer's performance warranty, the inverter manufacturer's warranty, and the installer's own workmanship warranty. Each should name the years and who honours the claim. Verde Solaire's July 2025 price posts stated 25-year performance warranties on its panels. --- # How to verify a PM Surya Ghar vendor Source: https://www.verdesolaire.com/learn/verify-your-pm-surya-ghar-vendor Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A PM Surya Ghar: Muft Bijli Yojana vendor is verified on the national portal, pmsuryaghar.gov.in, which keeps one list of registered vendors for each electricity board. In Delhi the state solar portal links straight to the five lists for BSES Rajdhani, BSES Yamuna, Tata Power-DDL, NDMC and MES; in Uttar Pradesh the national list for your board is backed by UPNEDA's own approved-firms register. The rule behind the lists is short: the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Being on the list is necessary, and it is not the same as being good. This guide shows where to look, what a listing does and does not prove, and what the ministry's August 2026 action against 66 vendors means for an application that is not moving. ## Where the lists are **Uttar Pradesh.** There are two places to look. The first is the national portal's list for the board printed on your bill: PVVNL, NPCL and PUVVNL each have their own. The second is UPNEDA, the state nodal agency, whose website links an "Approved Vendors List for Solar Rooftop (Residential)" on its solar rooftop portal. That list can be filtered by district and shows each firm's name, vendor code, district, address and the date it was approved; about 530 firms are on it. Noida and Greater Noida are in Gautam Buddha Nagar district, Ghaziabad and Varanasi are districts of their own. Verde Solaire's entry sits under Gautam Buddha Nagar, the district of its Sector 47 head office. The list is cited in full in the sources below. **The national portal itself.** The portal renders only in a browser, so open the list yourself rather than trusting a screenshot a caller sends you. If you are not sure which board you are on, the [net-metering pages](/net-metering) name the licensee for every city this site covers, and the name at the top of your bill settles it. ## What "registered" means A registered vendor has enrolled on the national portal for a board's area and can be selected in your application. The board will inspect its installation, the commissioning certificate can be generated, and the central subsidy can be claimed for the system. The vendor is also bound by the scheme's rules: both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on the ALMM List-II. Since June 2026 the ministry has had a written standard operating procedure for complaints against vendors, described later on this page. Two details trip people up. The lists are kept per board, so a firm on the PVVNL list is not automatically on the BSES Rajdhani list; check the list for your board, not "the list". And the entry carries the firm's legal name, which may differ from the brand on a visiting card. Verde Solaire trades as Verde Solaire; the firm is Verde Solaire Private Limited, GSTIN 09AAGCV4977Q1Z6, and older paperwork and reviews may use its former name, formerly Sirius Electric. ## What "registered" does not mean Registration lets a firm be chosen on the portal and makes it answerable to the ministry. It does not mean anyone has checked the firm's price, its structure design, its earthing or its warranty terms, and it does not say which panel or inverter will be on your roof. The lists show who may install under the scheme, not who installs well. It is also not permanent. A deactivated vendor is removed from the vendor-selection pages, so a name you saw in a brochure last month may not be selectable today. And it is not the same as other government registrations: Verde Solaire is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations, which are separate empanelments for separate programmes, and none of them substitutes for the PM Surya Ghar list. Read the vendor code from the list itself, not from a web page. A list entry can be deactivated overnight; a page like this one cannot show that. ## MNRE's August 2026 action: 66 vendors and the 60-day rule On 27 August 2026 IndianPSU reported that MNRE had deactivated 66 registered vendors. Between April and June 2026 those firms had accumulated far more applications at the "Agreement Uploaded" stage than they had the capacity to install. The ministry called this "artificial hoarding" and said it could "restrict consumer choice and potentially delay the disbursement of government subsidies". Vendors were advised "not to retain consumer applications for more than 60 days without valid reasons". The deactivation runs for one month. During it a vendor cannot accept new applications and is taken off the vendor-selection pages, but keeps portal access to finish installations already under way, and has 30 days to bring its pendency down to an acceptable level or face a longer deactivation. The report does not say what happens to the applications those 66 vendors were holding. The action follows a standard operating procedure the ministry issued in June 2026, reported by Energetica India and listed in the sources below. Complaints reach the ministry through the national portal, its vendor management unit, or defects found in third-party inspection. The violations it names include the absence of mandatory earthing and surge protection, delays in execution after an advance has been paid, missing warranties and consumer agreements, mismatched module serial numbers and non-compliance with the domestic content requirement. A vendor gets eight days to respond, a reminder, a show-cause notice at fifteen days, and a one-month deactivation if the explanation is unsatisfactory, with 30 days to appeal. The names of deactivated vendors are to be displayed on the national portal. What this means for you is practical. If your application has sat at one stage for more than 60 days, ask your vendor in writing what the valid reason is. Feasibility pending with the board, or a roof problem found on survey, are reasons; silence is not. The [portal help page](/subsidy/portal-help) explains what each stage means and who acts next. ## Five checks before you sign 1. Find the firm on the list for your board 2. Match three names 3. Choose the vendor in your own login 4. Check the quote against the rules the list does not check 5. Watch the clock after Agreement Uploaded The sequence of money never changes: you pay the installer, and the government pays you, officially "within 30 days" of the claim; about 15 days on average. Nobody collects the subsidy on your behalf, and no registered vendor needs a "processing fee" to get an application approved; the [money-flow page](/subsidy/who-pays-whom) and the [free-solar calls guide](/learn/free-solar-scam-calls) cover the ways that sentence gets abused. For everything else to settle before an advance changes hands, use the [before-you-pay checklist](/learn/before-you-pay-the-advance), and for what the cell rule means on a quote, [ALMM List-II explained](/learn/almm-list-ii-explained). ## How Verde Solaire answers these checks Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. It said so on its FAQ of 12 May 2025, and its application guide of 23 May 2025 walks applicants through selecting Verde Solaire Pvt. Ltd. as the registered vendor on the portal. The written quote names the make, model and wattage of every component, and the survey visit is where the portal registration is done with you, on your phone. Use the official lists above to confirm a vendor's registration, whether you are considering Verde Solaire or any other firm. A vendor should be able to show the same registration in your state. Customers have written about the part of the job that comes after the list. Brij Lal Bhardwaj, with 4 kW at his Sector 25, Noida home, wrote that the team completed the documentation and the liaison for the net meter with the electricity department, and that "Verde has also got the subsidy processed for my solar power plant". Every published review is on the [reviews page](/reviews), verbatim. ## Questions **Where is the PM Surya Ghar vendor list?** On the national portal, pmsuryaghar.gov.in, as one list per electricity board. In Delhi, solar.delhi.gov.in links to the five lists for BSES Rajdhani, BSES Yamuna, Tata Power-DDL, NDMC and MES. In Uttar Pradesh, use the national list for PVVNL, NPCL or PUVVNL, or UPNEDA's approved-firms list, which is filterable by district. **Is Verde Solaire a registered PM Surya Ghar vendor in Delhi and Noida?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, as published on its FAQ and its application guide. Confirm it yourself on the list for your board before you apply; the list is the authority, not a website. **Does a registered vendor mean the government has approved its quality or price?** No. Registration means the firm can be selected on the portal for that board's area and must follow the scheme's rules. It says nothing about workmanship, price or warranty, and a registration can be deactivated. **What did MNRE do to PM Surya Ghar vendors in August 2026?** It deactivated 66 registered vendors for a month because they had accumulated far more applications at the Agreement Uploaded stage than they could install. Deactivated vendors cannot take new applications and are removed from the vendor-selection pages. **How long can a vendor hold my application?** MNRE has advised vendors not to retain consumer applications for more than 60 days without valid reasons. If yours has sat at one stage longer than that, ask the vendor in writing why. **Can I use any installer and still get the subsidy?** No. The central subsidy of up to ₹78,000 is paid only for a system installed by a vendor registered on the national portal for your board, chosen by you in your own application. An unregistered installer can still install a system, but without the subsidy. **What is the difference between the UPNEDA vendor list and the national portal list?** The national portal list is the one that matters for the central subsidy; it is kept per electricity board. UPNEDA's approved-firms list is the state agency's own register for residential rooftop solar in Uttar Pradesh, filterable by district. A serious vendor in Noida or Varanasi should appear on both. --- # How we work: survey, quote, paperwork Source: https://www.verdesolaire.com/about/how-we-work Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Every Verde Solaire installation follows the same eight steps: a call or WhatsApp message, a free site survey with a shadow analysis, a written quote that names the make and model of every component, registration on the PM Surya Ghar: Muft Bijli Yojana portal, installation, the DISCOM inspection and net meter, commissioning with the subsidy claim, and after-sales. You pay in stages tied to what has actually happened on your roof, and the company files the paperwork with the electricity board and on the national portal on your behalf. This page sets out each step, what you are asked to do at it, and which parts of the timeline are ours and which belong to the government, so that the quote you eventually sign matches what you were told at the start. ## Before you call: get the number first Most people want to know the price before they want to talk to anyone. The [solar calculator](/tools/solar-calculator) gives the published price for your city and size, the central and state subsidy applied, the net payable and the monthly generation, with the assumptions printed under the result. The [pricing pages](/pricing) show the same ladder city by city. Use them first. If the number does not work for you, there is no reason to book a survey. The first conversation is a phone call or a WhatsApp message, and it covers three things: your city, your roof and your average monthly bill. From those we can say whether solar is likely to suit your house at all, which is the point of the call as Verde Solaire has published it: to answer your questions and to determine whether your location is right for solar. Some houses are not. A roof shaded by a taller building for most of the day, a bill under about a hundred units a month, or a builder floor without roof rights are all reasons we will tell you not to proceed, and we will say so on that first call rather than after a visit. ## The eight steps 1. Call or WhatsApp 2. Free site survey and shadow analysis 3. Written quote with named make and model 4. Portal registration and DISCOM feasibility 5. Installation 6. Inspection and net meter 7. Commissioning and subsidy claim 8. After-sales ## What the survey actually checks The survey is where the size is decided, not the phone call. The engineer measures the roof and marks what shades it at different hours: a water tank, a parapet, a neighbour's floor, a tree. Panels in shade for part of the day generate less than the published figures assume, and the shadow analysis is what turns a guess into a size that will hold up. One New Delhi customer, K. K. Sharma, wrote after a 10 kW installation that he "was highly impressed with their shadow analysis process". The engineer also reads your electricity bill for the sanctioned load, because the electricity board approves solar capacity against it, and photographs the roof, the meter and the distribution board. That is the material the quote is built from, and the same photographs go into the portal application later. ## What the quote contains, and why A Verde Solaire quote names the make and model of the panels and the inverter, states the wattage of each module, and shows the gross price, the central subsidy, the state subsidy and the net payable on separate lines. It states the payment stages and the warranty on each component. Net metering, the portal application and the subsidy claim are inside the scope, not extras. The reason for that level of detail is practical. The subsidy requires Indian-made modules and cells, and from 1 June 2026 the cells must appear on ALMM List-II; a quote that names the module lets you check it against the government list yourself. A quote that only says "540 W mono panel" does not. Our [before you pay the advance](/learn/before-you-pay-the-advance) checklist lists the other things to look for in any installer's quote, including ours. ## How payment works Payment is linked to three milestones: a booking amount when you accept the quote, a payment when the material is delivered to your site, and the balance at commissioning. The exact split is written in the quote, and it is the quote that governs, not this page. If you take a PM Surya Ghar loan, the bank pays those stages and you pay EMIs; the subsidy still comes to you and can be used to prepay the loan. Two things are worth being clear about. First, the subsidy is never deducted from the invoice: you pay the installer the gross price, and the government pays you afterwards, which is the sequence set out in the scheme's own rules and explained on [who pays whom](/subsidy/who-pays-whom). Any installer who offers to "adjust" the subsidy in the bill is asking you to trust an invoice you cannot verify. Second, the price on the quote is the price. The published ranges on this site are indicative; the survey settles the structure, cabling run and inverter, and the quote is what you sign. ## What we file for you The subsidy application is in your name, because the money is paid to your bank account, but the work of the application is ours. On the survey visit we register you on the national portal with your electricity board, consumer number and mobile number, and you select Verde Solaire from the vendor list; the company is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. After installation we upload the plant details and photographs, apply for the net meter, attend the DISCOM inspection, and follow the file until the commissioning certificate appears on the portal. Then you submit your bank details and a cancelled cheque, and the subsidy is paid "within 30 days" of the claim; about 15 days on average. ## A typical timeline, in words It helps to keep two clocks apart. The first is ours: the survey happens within a few days of your call, the quote follows the survey, and once material is on site the installation of a home system takes a few days. A New Delhi customer, Arun Sibal, wrote that the plant was installed "within few days of receiving their payment". The second clock belongs to the government, and it runs before and after ours. Before installation, the electricity board must approve feasibility. After installation, the board must inspect and fit the net meter; in Delhi the DERC guidelines of July 2026 set a connection timeline of 10 days for systems up to 10 kW, with no application fee for domestic connections of that size. Uttar Pradesh has no equivalent published day count, and the practical timeline depends on the DISCOM office handling your file. After the meter, the subsidy is officially paid within 30 days of the claim. Where the government clock runs slow, what we can do is keep the file moving and keep you informed. The same Delhi customer wrote that the wait for the BSES net meter "was actually not in control of Verde" and that "Verde people always kept me in the loop regarding the net meter status". A Janakpuri customer with a 10 kW system made the same distinction in his review: a quick installation, and a net-metering process delayed by the electricity board. ## What customers have said about speed and follow-up The two things people mention most are how fast the roof work was and whether anyone followed the paperwork afterwards. L. R. Singh, who had a 6 kW system installed in Noida, wrote: "I was surprised by the speed of their execution. I was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire." Aurbind Sharma, with a 7 kW system in Sector 41, Noida, wrote that "the workmanship and the service provided by the Verde Solaire team was exemplary. They completed the installation in record time." A Sector 25 customer with a 4 kW system wrote that the team did the complete installation including the documentation and the liaison for the net meter with the electricity department, and that the subsidy was processed for him. Every review quoted on this site is reproduced verbatim from the company's published testimonials; the full set is on the [reviews page](/reviews). ## No pressure, in specific terms - The calculator and the pricing pages give you the number before you speak to anyone. - On the first call we say whether solar suits your house. If it does not, we say so and stop there. - The survey is free and commits you to nothing. - You receive one written quote and one engineer's contact. There is no second salesperson and no follow-up campaign; if you say no, or not yet, we wait for you. - The quote is the price. Nothing is added at the milestone stages that was not on the quote. ## After commissioning The engineer who surveyed the roof stays your contact after handover. Warranty terms for the panels, inverter and workmanship are stated in your quote, and the claim goes through the same number you first called. What each warranty covers, and what routine cleaning a rooftop system in Delhi NCR needs, is on the [warranty and after-sales page](/about/warranty-and-after-sales). ## Questions **Is the site survey free?** Yes. Verde Solaire's published terms are a free site evaluation and a no-obligation proposal. An engineer visits, measures the shadow-free roof area and checks your sanctioned load before any quote is written. **What does the written quote include?** The make and model of the panels, inverter, structure and protection devices, the gross price, the central and state subsidy shown separately, the net payable, the payment stages and the warranty terms. Net metering filing and the subsidy claim are part of the scope. **How is payment split?** Payment is linked to milestones: a booking amount, a payment when material is delivered to site, and the balance at commissioning. The exact percentages are stated in your written quote, and a loan can replace the cash stages. **How long does installation take?** The physical work on a home roof is usually a few days once material is on site. The net meter and the subsidy follow separate government timelines: Delhi's rule is a connection within 10 days for systems up to 10 kW, and the subsidy is officially paid within 30 days of the claim. **Who applies for the subsidy, you or me?** The application is in your name on pmsuryaghar.gov.in, because the subsidy is paid to your bank account. Verde Solaire registers it with you on the survey visit, uploads the plant details and photographs, and follows the DISCOM inspection through to the commissioning certificate. **Will you keep calling me after the survey?** No. You receive one written quote and one engineer's contact. If you say no, or not yet, that is where it ends until you get back in touch. --- # Is rooftop solar worth it in Delhi NCR? Source: https://www.verdesolaire.com/learn/is-rooftop-solar-worth-it-delhi-ncr Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) The rest of this page shows the arithmetic behind those years, what the arithmetic leaves out, and the cases where the honest answer is to keep your money. **Worth it:** an owned house or a builder floor with the roof right, 200 units a month or more, no shade across the middle of the day, and a plan to stay for the payback period. **Not worth it:** a shaded roof, a tenancy, very low usage, a flat with no roof right, or a need for power during outages, which an on-grid system does not provide. ## The payback maths for 3 kW in Noida Three numbers decide payback: what you pay, what the system generates, and what each of those units would have cost you on your tariff. **What you pay.** A 3 kW system is ₹1,99,000 to ₹2,10,000 on the published list, which includes panels, inverter, structure, net metering, installation and warranty. The central subsidy is capped at ₹78,000 for 3 kW and above, and Uttar Pradesh adds ₹30,000, so the net price is ₹91,000 to ₹1,02,000. Both amounts reach your bank account after commissioning, so the gross price is paid first; the [money-flow page](/subsidy/who-pays-whom) sets out who pays whom and when. **What it generates.** Verde Solaire's published planning yield for Noida is 1,500 units per kW a year . The calculator takes 10% off for dust and the monsoon, an assumption it prints under every result, and arrives at about 338 units a month, a little over 4,000 units a year. **What those units would have cost.** Uttar Pradesh's urban domestic slabs for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, plus a fixed charge of ₹110 per kW per month on the sanctioned load. Slabs are telescopic: the first 150 units are billed at the lowest rate, the next 150 at the second, and so on. Solar takes units off the top of that ladder, at the dearest rate first. For a home using about what 3 kW generates, the calculator's saving is a month, which is the whole energy charge. The fixed charge on a 3 kW connection stays on the bill. **Payback.** Twelve months of that saving set against the net price gives 3.8 to 4.3 years. After that, every unit the system generates is a unit you do not buy, at whatever the tariff is by then. The [Noida price page](/pricing/noida) has the same working for 1, 2, 5 and 10 kW. ## The same sum in Delhi Delhi's domestic energy charges, on the FY 2021-22 schedule that is still the last one DERC has published, are ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit . Per unit they are lower than Uttar Pradesh's, and the fixed charges are ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month. Two surcharges sit on top of both: a regulatory asset surcharge of 8%, and the power purchase adjustment cost (PPAC), a fuel surcharge revised every month, which BSES Rajdhani set at 17.94% for June 2026 . The published planning yield for Delhi is slightly lower too, 1,450 units per kW a year , so 3 kW gives about 326 units a month. Put together, the calculator's bill saving for a Delhi home using what its system makes is a month, less than Noida's because the rates are lower. Delhi's higher capital subsidy still brings the net price down to ₹43,000 to ₹54,000, but the calculator does not add a generation-based incentive for new applications. The [Delhi subsidy page](/subsidy/delhi) explains the current route. One thing the calculator does not model is Delhi's free-power subsidy: 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in. With solar it is worked out on net units, that is import minus export. If you use 300 units a month and receive it, the Delhi government already pays half of your energy charge above 200 units and all of it below, so the bill solar removes is smaller than the calculator assumes and the payback is longer. Below 200 units the energy charge is already nil, so a paid system should be assessed carefully against its net price and net-metering credits: credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. ## How the calculator gets there, in words The [subsidy and savings calculator](/tools/solar-calculator) does four things, none of them hidden. 1. It takes the gross price for the capacity from the published list, subtracts the central subsidy and the state subsidy for your city, and calls the remainder the net price. 2. It multiplies the capacity by the published yield per kW for your city, takes off the 10% derate, and divides by twelve for the monthly units. 3. It works out your bill twice on the current slabs and fixed charge, once with your monthly units and once with your units less the solar units, and calls the difference the monthly saving. In Delhi it adds the surcharge and PPAC to both bills and the incentive on every unit generated. 4. It divides the net price by twelve months of saving, plus the incentive where it applies, and calls that the payback in years. It does not add tariff escalation, loan interest, cleaning or an inverter replacement, and it does not subtract Delhi's free-power subsidy. Enter your own units and sanctioned load rather than the defaults; the defaults assume you use exactly what the system makes, which is the best case for the sum. ## Losses the glossy pages leave out **Dust and the monsoon.** Dust settles on panels within days in the dry months, and July and August generate less than March or October. The calculator's 10% derate is an average across the year, so individual months will be above and below it. The [monsoon and dust guide](/learn/monsoon-and-dust-generation-ncr) has the pattern month by month and what cleaning recovers. **Degradation.** Panels lose a little output every year. The calculator's 25-year projections assume 0.7% a year, an editorial assumption; the panels on Verde Solaire's July 2025 price list carry 25-year performance warranties on all three panel types, which is the manufacturer's floor on that decline. The payback years above use year-one output, so they are slightly optimistic. **Charges that stay.** The fixed charge is levied on your sanctioned load, not on what you consume, and solar does not touch it. In Delhi the surcharge and the PPAC apply to whatever is left of the bill. Solar does not make a bill zero; it removes most of the energy charge. **The inverter.** Panels carry the long warranty; the inverter's is shorter, and it is the component most likely to be replaced within the life of the system. Ask for the inverter warranty in writing with the quote. **The wait for the meter.** Until the net meter is in, exported units earn nothing. Delhi's rule since 16 July 2026 is a connection within 10 days for systems up to 10 kW; before it, Arun Sibal wrote of his New Delhi installation that "the only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde". Budget for the gap. ## Maintenance and cleaning An on-grid system has no moving parts and no battery. What it needs is regular cleaning in the dry months and an occasional look at the inverter display and the earthing. On a low, flat roof that is water and a soft mop; where the structure is elevated or the roof is high, a service visit is the safer choice. Verde Solaire's [maintenance and cleaning service](/solutions/maintenance-and-cleaning) covers that, and the [maintenance guide](/learn/solar-panel-maintenance-and-cleaning) explains what you can do yourself and how often. The longest-running published customer account is S. C. Garg's, of a system at his Greater Kailash home in New Delhi: "the solar system has been working continuously without a single day breakdown since 2017", and "my electricity bill has been low since then". One installation is not a statistic, but it is the kind of evidence a payback claim should come with. ## When it is not worth it - **Your roof is shaded.** A water tank, a neighbour's floor or a tree over the panels for part of the day takes a larger share of output than its shadow suggests. K. K. Sharma, in Chattarpur, wrote that he "was highly impressed with their shadow analysis process"; that analysis is part of the a free site evaluation and no-obligation proposal Verde Solaire offers, and it is the check to insist on before any quote. - **You rent.** The subsidy goes to an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. A tenant pays the full price and leaves the system behind. - **You use very little.** The scheme's own sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. At 150 units a month the calculator's Noida payback is 9.2 to 10.3 years for 3 kW, and in Delhi the free-power subsidy already covers the energy charge. A 1 or 2 kW system, or none, is the honest recommendation; the [sizing guide](/learn/what-size-solar-system-do-i-need) works through it. - **You live in a flat without a roof right.** An individual system needs a roof you are entitled to use. A housing society can apply for common facilities at ₹18,000 per kW; the [builder floors and shared roofs guide](/learn/solar-on-builder-floors-and-shared-roofs) and the [housing societies page](/solutions/housing-societies) cover both routes. - **You want power during outages.** An on-grid system switches off when the grid does, by design. If backup is the goal, [rooftop solar or inverter battery](/learn/rooftop-solar-or-inverter-battery) compares the options, including hybrid. - **You are selling within the payback period.** The system stays with the house, and the eligibility rule excludes anyone who has already taken a solar subsidy, so you would not receive it again at the next address. ## Why the advertised saving never matches the bill Advertised savings are usually the whole bill; real savings are the part of the bill solar can reach. Four things separate the two. 1. **Slabs are telescopic.** Solar removes the dearest units first, so the first units it displaces save more than the last. A page that multiplies generation by the top slab rate overstates the saving for anyone who does not sit in that slab all year. 2. **Fixed charges and surcharges remain.** Neither state waives the fixed charge for solar homes, and Delhi's surcharge and PPAC are applied to it. 3. **Delhi already pays part of the bill.** For a home under 400 units the free-power subsidy is paying some or all of the energy charge, so the amount solar removes from what you actually pay is smaller. 4. **The seasons do not line up.** Generation peaks in the dry months and dips in the monsoon; consumption peaks in the summer. Net metering carries credits from month to month, but the summer bill is the one people compare, and it is never the best month for the sum. Verde Solaire's own FAQ says homeowners typically reduce their power bills by 60–90%. The range is that wide because of the four points above, not because the arithmetic is uncertain. The test to apply to any installer, this one included, is to ask for the bill before and after from a named installation, and for a quote that shows the gross price, the subsidy and the net separately. The [Delhi tariff](/learn/delhi-electricity-tariff-explained) and [Noida tariff](/learn/noida-electricity-tariff-explained) guides show how to read your own bill, and the [bill calculator](/tools/electricity-bill-calculator) reproduces it line by line. ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Is solar worth it if my bill is under 200 units a month?** Usually not on cost alone. In Delhi the first 200 units are free under the state's opt-in subsidy, so there is little energy charge left to remove. In Noida a 150-unit home saves about ₹825 a month on the FY 2026-27 slabs against a net cost of ₹91,000 or more for 3 kW. A 1 or 2 kW system may still fit: the scheme's sizing guide is 1 to 2 kW for 0 to 150 units. **Why is my saving smaller than the installer promised?** Four reasons. Slabs are telescopic, so the units solar removes are the dearest ones and the rest of the bill is cheaper per unit. Fixed charges stay: ₹110 per kW per month in Uttar Pradesh, ₹50 per kW per month in Delhi for 2 to 5 kW. In Delhi the 8% surcharge and the monthly PPAC (17.94% for BSES Rajdhani in June 2026) still apply to what remains. And generation peaks in different months from consumption. **Does the electricity bill become zero with solar?** No. Solar removes most of the energy charge; the fixed charge on your sanctioned load stays, and in Delhi the surcharges apply to it. A home that uses about what its system generates sees the bill fall to the fixed charge plus whatever the system did not cover. **Can a tenant install rooftop solar under PM Surya Ghar?** Not with the subsidy. It goes to an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The system and the net-meter connection also stay with the house, so a tenant carries the cost and leaves the asset behind. **Will I lose Delhi's free 200 units if I install solar?** The free-power subsidy is worked out on net units, import minus export, so it continues on whatever you still draw from the grid. News coverage of the 1 September 2026 Cabinet decision said households that install solar keep it; the notification has not yet been published. **How much do panels lose to Delhi's dust and monsoon?** The calculator applies a 10% derate to Verde Solaire's published planning yield of 1,450 (Delhi) to 1,500 (Noida) units per kW a year, and 0.7% a year degradation on 25-year projections. Both are editorial assumptions printed under every result; the monsoon and dust guide has the month-by-month pattern. --- # Jama Corporation, Kanpur: 200 kW rooftop Source: https://www.verdesolaire.com/projects/jama-corporation-kanpur-200-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 200 kW rooftop solar plant at Jama Corporation's factory in Kanpur, Uttar Pradesh, using 598 Waaree polycrystalline modules of 335 Wp and three Delta 70 kW string inverters. The annual energy yield is 289,345 kWh and the saving is about per unit against the factory's grid tariff. The plant is grid connected through a zero-export device, because Uttar Pradesh did not offer net metering for this type of connection at the time of installation. ## The system as published | Item | Published figure | |---|---| | Owner | Jama Corporation | | Location | Kanpur, Uttar Pradesh | | Rated system power | 200 kW | | Modules | 598 × 335 Wp Waaree polycrystalline | | Inverters | Delta 70 kW string inverters, three units | | Roof area covered | 19,000 sq ft | | Connection | Grid connected with a zero-export device | | Annual energy yield | 289,345 kWh | | Saving per unit | about | | CO2 avoided | about 292 metric tonnes a year | The yield works out to roughly 1,447 kWh per kW a year, which sits close to the planning figures Verde Solaire uses for commercial roofs in Noida and Delhi. The case study notes that the per-unit saving will rise as the electricity tariff rises each year, and that the system has an average life cycle of 25 years. ## Why a zero-export device A zero-export device measures the factory's load and holds the inverters' output at or below it, so no solar power flows out to the grid. That was the only way to connect this plant at the time: the case study records that a zero-export device was installed "as U.P. does not have net metering". On 13 May 2023 Verde Solaire posted that Uttar Pradesh had approved a net feed-in process for rooftop solar projects, so a factory connecting today faces a different set of rules. The current position for Noida, Ghaziabad and Varanasi connections is on the [net-metering guide](/net-metering). For a factory that runs through the day, the zero-export limit costs little: most of what the roof produces is used on site as it is generated. The saving comes from units not bought, not from units sold. ## DG sync Factories in Uttar Pradesh run diesel generators through outages. A standard on-grid inverter shuts down when the grid drops, which would leave the solar plant idle for exactly the hours when power is most expensive. DG synchronisation lets the inverters run alongside the generators and hold the solar contribution within a safe share of the load. Jama Corporation's plant was built with it. Rajiv Jalan, writing about the 200 kW system at the company's Kanpur factory, put it this way: > "This solar plant was installed with DG sync and we are able to save hugely on our electricity bills. The services and quality used by Verde is very good and we are very happy with this company." > > Rajiv Jalan ## What this project shows This is one of the two case studies Verde Solaire has published in full; the other is the [110 kW plant at Marwar Carpets, Panipat](/projects/marwar-carpets-panipat-110-kw), built with Vikram modules and Schneider inverters. Together they cover the two ways a factory roof can be connected: with export to the grid, and without. If you run a factory or warehouse, the [commercial and industrial page](/solutions/commercial-industrial) explains how a plant of this size is sized, connected and paid for, and the [commercial payback calculator](/tools/commercial-payback) takes your own tariff and load. Referrals of factory, commercial and institutional sites of 50 kW minimum for factory, commercial and institutional referrals (pan-India) qualify for the [referral programme](/referral). ## Questions **How big is the Jama Corporation solar plant in Kanpur?** It is a 200 kW rooftop plant built from 598 Waaree polycrystalline modules of 335 Wp each, covering about 19,000 square feet of factory roof, with three Delta 70 kW string inverters. **How much electricity does the 200 kW Kanpur plant generate?** Verde Solaire's published case study gives an annual energy yield of 289,345 kWh, which is about 1,447 units per kW of installed capacity per year. **What does the factory save per unit?** The published figure is about ₹7.35 per unit, and the saving rises as the tariff rises, because every unit the roof produces is a unit not bought from the grid. **Why does the plant have a zero-export device instead of net metering?** When the plant was built, Uttar Pradesh did not offer net metering for this connection, so a zero-export device keeps the solar output within the factory's own load. The rules have changed since; see the net-metering guide for the current position. **What is DG sync on a solar plant?** DG sync lets the solar plant run in parallel with the factory's diesel generators during a grid outage, so solar keeps supplying part of the load instead of shutting down. Jama Corporation's plant was installed with it, as the customer's review says. **How much carbon does the Kanpur plant avoid?** Verde Solaire's case study puts the reduction at approximately 292 metric tonnes of CO2 a year, over a published average system life of 25 years. --- # Janakpuri, Delhi: 10 kW, elevated structure Source: https://www.verdesolaire.com/projects/janakpuri-delhi-10-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 10 kW rooftop solar system at a house in Janakpuri, New Delhi, with Vikram Solar panels, KSolare inverters and an elevated module mounting structure. The owner, Navin Verma, described the installation as quick and of very good quality, and recommended Verde Solaire for a home solar plant. The owner's account and photograph show the equipment choices, elevated structure and installation experience. Module count, roof area, generation and bill figures were not included, so this case study focuses on what the owner shared and how a Delhi net-meter connection works today. ## The system as the owner described it | Item | Published detail | |---|---| | Location | Janakpuri, New Delhi | | Type | Residential rooftop, grid-connected with a net meter | | Rated capacity | 10 kW | | Modules | Vikram Solar | | Inverters | KSolare | | Mounting | Elevated module mounting structure | | Source | Owner's review on Verde Solaire's testimonials page | Neither the module wattage nor the inverter model is given. Verde Solaire's other 10 kW homes in Delhi used modules of 530 Wp and above, which puts this array at about 19 modules; that is arithmetic, not a published count. ## What the elevated structure is for The photo explains why the frame is so tall. The terrace carries water tanks, air-conditioner outdoor units in mesh cages, planters and a shade canopy, and a flat array would have taken most of it. Raising the modules on galvanised uprights keeps the terrace in use, lifts the panels clear of the tanks and cages that would otherwise shade them, and lets air move under the modules, which keeps them cooler on a Delhi afternoon. The same approach was used on the [Greater Kailash 10 kW installation](/projects/greater-kailash-delhi-10-kw-bifacial), where the gap also feeds the rear face of bifacial panels. The [solar inverters page](/equipment/solar-inverters) explains what a string inverter such as a KSolare unit does. ## What the owner said Navin Verma wrote that he "used Vikram solar panels and KSolare inverters with an elevated module mounting structure" and that "the installation of solar plant by Verde was of very good quality and their installation of solar system was also very quick". He recommended the company to anyone considering a solar plant for their home. The review highlights the component choices, elevated design and prompt installation at the home. ## Net metering in Delhi today The Delhi Electricity Regulatory Commission has since tightened the rules. Under the DERC second amendment guidelines of 16 July 2026, a connection for a system up to 10 kW must be completed within 10 days, and a domestic application of that size carries no application fee. The 2024 amendment already meant that no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. Applications now go two ways: PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. A 10 kW home is the largest size those timelines cover. Each licensee's portal and the current process are on the [Delhi net-metering page](/net-metering/delhi) and in the [note on the 10-day rule](/updates/derc-10-day-net-metering-rule). ## What this project shows ## Questions **What was installed at the Janakpuri house?** A 10 kW rooftop solar system with Vikram Solar panels, KSolare inverters and an elevated module mounting structure, as the owner, Navin Verma, described it on Verde Solaire's testimonials page. **Why put a 10 kW system on an elevated structure?** A raised frame keeps the terrace usable underneath, clears water tanks and air-conditioner units, and lets air move under the modules. On a Delhi home a 10 kW array needs roughly 19 modules of 530 Wp, which rarely fits flat on the roof. **How does net metering work for a Delhi home today?** The DERC second amendment guidelines of 16 July 2026 set a 10-day connection timeline for systems up to 10 kW, with no application fee for domestic connections of that size. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Are Vikram Solar panels eligible for the subsidy?** Vikram Solar is an Indian manufacturer, and Verde Solaire is certified by Vikram Solar as an EPC integrator. Subsidised systems need Indian-made modules and cells, and from 1 June 2026 the cells must be on ALMM List-II, so the exact module on any new quote should be checked against the list. --- # Jindal Prefab, Dharuhera: 430 kW financed Source: https://www.verdesolaire.com/projects/jindal-prefab-dharuhera-430-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 430 kW rooftop solar plant at Jindal Prefab's factory in Dharuhera, Haryana, with Adani solar modules and Havells inverters, and the factory paid for it almost entirely on a SIDBI loan: around 95% of the project cost, repaid over seven years out of the reduction in its electricity bill. The company announced the plant on 30 March 2023 and described the financing on a page published on 2 June 2023. Everything on this page comes from those two posts; where a figure was never published, it is left out. ## The system as published | Item | Published detail | |---|---| | Owner | Jindal Prefab | | Location | Dharuhera, Haryana | | Rated system power | 430 kW | | Modules | Adani Solar | | Inverters | Havells, with a 10-year warranty as published in 2023 | | Cleaning | Module cleaning system with walkways | | Finance | SIDBI loan, around 95% of project cost, seven-year term | | Announced | 30 March 2023 | The module wattage, module count, inverter sizes and annual yield were not published for this site. The ten-year inverter warranty is the 2023 figure; ask for current warranty terms in writing before signing for any plant, as the [warranty page](/about/warranty-and-after-sales) explains. ## Walkways and a cleaning system Dust is the main reason a plant in Haryana produces less than its rating suggests, and a 430 kW roof is too large to clean by hand from the edge. The Dharuhera plant was built with a module cleaning system and walkways between the rows, so the panels can be washed without anyone stepping on the glass, and the maintenance crew has somewhere to stand. What cleaning does to output in this region is on the [monsoon and dust page](/learn/monsoon-and-dust-generation-ncr). ## Paying the EMI from the bill The point of this project is the financing. Verde Solaire's June 2023 page on savings for commercial and industrial consumers uses Jindal Prefab as its example: SIDBI financed around 95% of the cost over seven years, the factory put in a small share of its own money, and the monthly instalment is paid from what the plant takes off the electricity bill. The page adds two claims that are the company's own: that Jindal is paying the EMI and still saving on its monthly bill, and that the small equity share is recovered through accelerated depreciation in the first year. Accelerated depreciation is a tax benefit for businesses that own a solar plant; whether it recovers the equity in year one depends on the company's tax position, so treat it as Verde Solaire's illustration rather than a rule. Once the seven-year loan is repaid, the whole saving stays with the factory. The same page carries a worked example for a 200 kW plant financed 75% over five years. It is not this project and its figures are 2023 assumptions; the [commercial payback calculator](/tools/commercial-payback) does the same arithmetic with your own tariff, load and loan terms. ## For factories considering the same route Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations; UHBVN and DHBVN are the two Haryana electricity boards. The [solar loan page](/solar-loan) covers how a solar loan is applied for, and the [commercial and industrial page](/solutions/commercial-industrial) explains how a plant of this size is sized and connected. This is the largest single plant among the projects Verde Solaire has published in detail. The two case studies with full figures are the [200 kW plant at Jama Corporation, Kanpur](/projects/jama-corporation-kanpur-200-kw) and the [110 kW plant at Marwar Carpets, Panipat](/projects/marwar-carpets-panipat-110-kw); they show what a factory roof yields per kW, which this post did not record. The announcement is filed under [updates](/updates/dharuhera-430-kw-commissioned); every published installation is on the [projects page](/projects). ## Questions **How big is the Verde Solaire solar plant at Jindal Prefab in Dharuhera?** It is a 430 kW rooftop solar plant on the Jindal Prefab factory in Dharuhera, Haryana, built with Adani solar modules and Havells inverters. Verde Solaire announced it on 30 March 2023. **How was the Dharuhera 430 kW solar plant financed?** Through a SIDBI loan. Verde Solaire's published account says SIDBI financed around 95% of the project cost over seven years, and that the factory pays the EMI out of the reduction in its electricity bill. **Does the factory save money while it is still repaying the loan?** According to Verde Solaire's June 2023 page, yes: Jindal Prefab is paying the EMI and still saving on its monthly bill, and the plant is debt-free once the seven-year loan is repaid. **What warranty do the inverters at Dharuhera carry?** Verde Solaire published that the Havells inverters at this plant carry a 10-year warranty. The module warranty for this project was not published. **Is there a module cleaning system on the Dharuhera plant?** Yes. The plant was built with a module cleaning system and walkways between the rows, so panels can be cleaned without stepping on them. **Can a factory in Haryana get a similar loan for solar?** Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, and is registered with the Haryana electricity boards UHBVN and DHBVN. Terms depend on the borrower and the lender. --- # Marwar Carpets, Panipat: 110 kW rooftop Source: https://www.verdesolaire.com/projects/marwar-carpets-panipat-110-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 110 kW grid-connected rooftop solar plant at the Marwar Carpets factory in Panipat, Haryana. The company's published case study lists 334 Vikram polycrystalline modules of 330 Wp each and Schneider string inverters on 10,500 sq ft of roof, an annual yield of 159,417 units, and a saving of about for every unit generated. That is the project in one paragraph. The rest of this page gives the published specification, what the plant did for the factory's bills during and after the Covid shutdown, and what its owner wrote afterwards. ## The system as published | Item | Published figure | |---|---| | Owner | Marwar Carpets | | Location | Panipat, Haryana | | Connection type | Grid-connected | | Rated system power | 110 kW | | Modules | 334 × 330 Wp polycrystalline, Vikram Solar | | Inverters | Schneider grid-connected string inverters | | Roof area used | 10,500 sq ft | | Annual energy yield | 159,417 kWh a year | | Carbon dioxide avoided | about 160.6 tonnes a year | | Design life | 25 years | Two figures follow from that table by arithmetic. The yield works out to about 1,450 units per kW a year, which is close to the planning figure Verde Solaire uses on its commercial savings pages for Delhi NCR. The roof takes about 95 sq ft per kW, because 330 Wp modules were the standard when this plant was built; Verde Solaire's recent Noida and Delhi installations used 530 to 545 Wp modules, so the same capacity now needs a smaller roof. ## What it does for the electricity bill The case study puts the saving at about for each unit the plant generates, and notes that the figure rises every time the tariff does. Multiplying the two published numbers, 159,417 units at that rate, gives about a year. That is an arithmetic result, not a published one: the real total depends on the tariff category on the factory's connection and on how much of the generation is used on site. Verde Solaire has not published a before-and-after bill for Marwar Carpets, so this page does not quote one. The plant kept working when the factory did not. During the Covid shutdown, the case study says, the units it produced were exported to the grid, so the owner benefited while production was stopped. That is the practical argument for a grid-connected plant on a factory roof: generation does not depend on the machines running that day. ## What the owner said Nikunj Aggarwal, the owner, wrote on Verde Solaire's testimonials page: "The company completed the work in record time with high quality solar panels from Vikram and solar inverters from Schneider. The savings in electricity bill is huge from this solar plant installation at my Panipat factory." He also explained how the order came about. Verde Solaire had earlier installed a 20 kW plant at his home in New Delhi, and he placed the factory order once the bills at his residence started coming down. His review ends: "Verde Solaire is highly recommended as a solar power installation company for high quality and timely work." ## What this means for a factory in Delhi NCR Panipat is in the Haryana part of the National Capital Region. Verde Solaire is certified by Vikram Solar as a trusted quality EPC integrator, which is the module brand on this roof, and it is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations; UHBVN and DHBVN are the two distribution licensees in Haryana. The company has delivered more than 50 MW of solar projects in total. The closest published comparison is the [200 kW plant at Jama Corporation, Kanpur](/projects/jama-corporation-kanpur-200-kw), from the same case study, which uses a zero-export device instead of grid export. The [commercial and industrial page](/solutions/commercial-industrial) sets out how a factory plant is sized and financed, and the [commercial payback calculator](/tools/commercial-payback) applies your own tariff and load. All published projects are listed on the [projects page](/projects), and other customer reviews on the [reviews page](/reviews). ## Questions **How big is the Marwar Carpets solar plant in Panipat?** It is a 110 kW grid-connected rooftop plant with 334 Vikram polycrystalline modules of 330 Wp each and Schneider string inverters, covering 10,500 sq ft of factory roof, as published in Verde Solaire's case study of 5 March 2023. **How many units does the 110 kW plant generate in a year?** The published annual energy yield is 159,417 kWh, which works out to about 1,450 units per kW a year. **How much does the factory save per unit of solar power?** The case study puts the saving at about ₹7.85 per unit, and notes it rises as the tariff rises each year. Verde Solaire has not published a before-and-after bill for this site. **What happened to the solar power when the factory was shut during Covid?** The plant is grid-connected, so the units it generated during the Covid shutdown were exported to the grid and the owner still benefited while production was stopped. **Who owns Marwar Carpets and what did they say about the installation?** Nikunj Aggarwal, who had earlier had a 20 kW plant installed at his New Delhi home by Verde Solaire, wrote that the work was completed in record time with Vikram panels and Schneider inverters, and that the bill savings at the Panipat factory are huge. --- # National solar brand or local installer? Source: https://www.verdesolaire.com/compare/national-brand-vs-local-installer Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A national solar brand and a local installer sell the same subsidised system under the same rules, so the choice is about what each kind of company is built to do well. National scale buys a supply chain, product-level guarantees and an app. A local installer buys a roof survey by the people who will do the work, custom structures, familiarity with your electricity board and a person whose name you know. The subsidy does not change with the choice: under PM Surya Ghar: Muft Bijli Yojana, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. This page gives a fair framework for the decision, eight checks that apply to either kind of company, and where Verde Solaire sits. The competitor claims are quoted from their own websites; nothing here comes from review sites or complaint forums. ## What national scale buys Read the national brands' own pages and the same three strengths appear. **Supply chain.** Tata Power Solar describes itself as "pioneers in India's rooftop domain for more than 30 years", with "1900 MW++ of cumulative solar rooftop installations" and "350+ sales & service channels partners across India". It makes its own modules. SolarSquare says it is "present in 31 Cities across 10 States" with "25,000+ Happy Families Solarised". A company at that scale buys modules by the container and does not run short of stock in a busy season. **Product guarantees.** Structure and generation are where the national brands write down promises that a small company rarely does. SolarSquare publishes a "WindPro Mount™ tested for 170 kmph storms", a "Generation guarantee" with a money-back promise, a "one-year water-leakage warranty" and a "4-year after-sales maintenance plan" with "monthly scheduled service visits". A written guarantee is worth more than a spoken one, whoever gives it. **An app and remote monitoring.** Tata Power Solar lists "24X7 Remote monitoring for performance analysis & real-time service support"; SolarSquare offers a "Real-time Monitoring App". Someone at a desk sees when an inverter trips before you notice the bill. Those are real advantages. A page written by a local installer that pretends otherwise is not worth reading. ## What local buys **Site visits by the people who install.** With a national brand, its own pages leave open who surveys, who installs and who services; Tata Power Solar sells through "1000+ channel partners" and its residential page does not say which of them does the work on your roof. With a local installer the engineer who stands on your roof designs the system and usually leads the installation. A Chattarpur customer wrote of Verde Solaire, "I was highly impressed with their shadow analysis process." **Custom structures.** Delhi NCR roofs come with water tanks, mumties, shared terraces and builder-floor rights. A Janakpuri customer described his 10 kW system as "Vikram solar panels and KSolare inverters with an elevated module mounting structure". Elevated and bespoke structures are drawn per roof, not picked from a catalogue. **DISCOM familiarity.** A local office deals with BSES Rajdhani, BSES Yamuna, Tata Power-DDL, PVVNL or NPCL every week and knows what each inspection team looks for. The Delhi Electricity Regulatory Commission (DERC) rule of a connection within 10 days for systems up to 10 kW applies to every board, but the paperwork that gets you there is local. A Sector 25, Noida customer wrote that the team did the complete installation including the documentation and the follow-up with the electricity department for the net meter, and got the subsidy processed as well. **A named engineer.** A Varanasi customer thanked "Mr. Sachin Dubey of the firm who helped in all the processes including documentations for net metering". Another wrote: "Special mention to Mr Punit for speaking to me and clearing all my doubts regarding solar power plants." That is the director taking the call. The trade-off is reach: a local installer works in a handful of cities, not 31. ## Eight checks that apply to either 1. **Portal registration.** Search the company name on pmsuryaghar.gov.in before paying anything. The [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where the list sits for your board. 2. **Make and model in writing.** Panel, cell and inverter model numbers on the quote. Subsidised systems must use modules where both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on ALMM List-II, the Approved List of Models and Manufacturers. 3. **Who signs.** The name on the contract, the warranty and the service call should be one company. With a channel partner, ask which of the two you are contracting with. 4. **Three lines on the quote.** Gross price, subsidy, net payable. You pay the installer; the government pays you. A quote that shows only a net figure hides the first two. 5. **A named person for net metering.** Ask who follows your DISCOM and what the last three applications on your board took. A brand's national timeline is not your board's timeline. 6. **Warranty in years, per component.** Panel, inverter and workmanship separately. Verde Solaire's price posts state 25-year performance warranties on all three panel types; ask every company for the other two in writing. 7. **A survey before the number.** Verde Solaire offers a free site evaluation and no-obligation proposal. A quote given over the phone from a satellite image is a guess. 8. **Service after commissioning.** Who comes when the inverter shows a fault, and within how many days. A published maintenance plan, an app or a named engineer all answer this; a WhatsApp number that goes quiet does not. Run both kinds of company through the same eight and the answer usually falls out. The [before you pay the advance](/learn/before-you-pay-the-advance) checklist is the printable version. ## Where Verde Solaire sits Verde Solaire is the local kind. It is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects and has a team with combined experience of more than 2,000 MW. It is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. On equipment it is certified by Vikram Solar as a trusted quality EPC integrator and an authorised solar solutions partner of Luminous, and it has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans. Its prices are public: a 3 kW system is ₹1,99,000 to ₹2,10,000 before subsidy on the July 2025 list, and every capacity is on the [pricing pages](/pricing). What it is not: a manufacturer, a pan-India company, or a company with a published monitoring service or a written generation guarantee. If those matter most to you, one of the national brands is the better fit, and the [Tata Power Solar](/compare/verde-solaire-vs-tata-power-solar) and [SolarSquare](/compare/verde-solaire-vs-solarsquare) head-to-head pages set each out beside Verde Solaire line by line. ## Questions **Is a national solar brand better than a local installer?** Neither is better by default. A national brand publishes scale, product guarantees and an app; a local installer offers a roof survey by the people who will install, custom structures and daily contact with your electricity board. Judge both against the same eight checks: portal registration, module and cell model numbers, who signs the contract, three-line pricing, a named person for net metering, warranty years in writing, a survey before the quote, and a realistic timeline. **Does the PM Surya Ghar subsidy depend on which company installs?** No. The central subsidy is the same whoever installs, as long as the installer is a vendor registered on pmsuryaghar.gov.in and the modules and cells are made in India. You choose the vendor on the portal, and the subsidy is paid to your bank account, not to the installer. **What do national brands say about themselves?** Tata Power Solar's own pages claim more than 30 years in rooftops, 1,900 MW of cumulative rooftop installations, over 20,000 residential customers, 350-plus sales and service channel partners and 24x7 remote monitoring. SolarSquare claims 25,000-plus families, presence in 31 cities across 10 states, a real-time monitoring app, a mount tested for 170 kmph winds, a generation guarantee and a four-year after-sales plan. **What does a local installer do that a national brand may not?** The engineer who surveys the roof is usually the one who designs and installs it, so elevated structures, shared roofs and odd layouts get solved on site. The same office deals with your DISCOM every week, so it knows the local inspection and net-meter practice. You get a named person rather than a call centre. **Where does Verde Solaire sit?** It is a local EPC with offices in Noida, New Delhi and Varanasi. It is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, is a registered PM Surya Ghar vendor in Delhi and Uttar Pradesh, and offers a free site evaluation before a written quote. It does not manufacture panels and has not published a remote-monitoring service. **How do I check any installer before paying an advance?** Search the company on pmsuryaghar.gov.in, ask for panel, cell and inverter model numbers and their ALMM List-II status, get gross price, subsidy and net payable as three separate lines, and confirm that the name on the contract, the warranty and the service call is the same company. --- # NCR solar generation: monsoon, dust, winter Source: https://www.verdesolaire.com/learn/monsoon-and-dust-generation-ncr Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A rooftop system in Delhi NCR does not make the same electricity every month. It generates the most in the long, clear days from March to June, dips through the monsoon cloud of July to September, recovers in the clear weeks of early October before the smog settles, and touches its lowest in the fog and short days of December and January. Averaged across a year, this site plans on Verde Solaire's published yield of 1,500 units per kW a year in Noida and 1,450 in Delhi , less a 10% derate for dust and season, which puts a 3 kW system at about 338 units a month in Noida and about 326 units a month in Delhi. One month's reading misleads because the pattern varies by season. This guide covers those seasonal shifts, plus the two things you can actually do about them: wash the glass after dust, and read the numbers over a full year. ## The year on a Delhi NCR roof **March to June.** The days are longest and the sky clearest, so these are the months of highest generation. Two things take the edge off. A silicon panel makes slightly less electricity as its cells heat up, so a scorching May afternoon gives a little less than the same sunlight would at a cooler temperature; and from April the hot westerly wind brings dust storms that leave a film on the glass. A clean panel on a clear day in April is close to the best the roof will ever do. **Late June to September.** The monsoon brings cloud, humidity and rain. Generation falls on overcast days and rises on the clear days between showers, and it never stops: panels produce from diffuse light as well as direct sun, so a grey day in August still puts units on the meter, just fewer of them. The rain washes off the summer's dust, though not bird droppings or the streaks it leaves as it dries. After the first heavy rain, check the DC and AC boxes for water and the sealant where the structure meets the roof; an earth-fault warning on a wet morning is the installer's job, and the [common problems page](/learn/common-problems-after-installing-rooftop-solar) explains those messages. **October and November.** The rain stops, the air goes still, and the smog settles on every surface, including the glass. Early October can be as clear as spring; by November the haze cuts the light before it reaches the roof, and dust that is not washed off adds to the loss every day. **December and January.** The lowest months. The days are short, the sun sits low, and fog can hide it until mid-morning. Nothing on the roof needs changing: the panels sit at the tilt that gives the best annual total. February starts the climb back. None of this is a fault. It is the sky the whole of Delhi NCR sits under, and it is why every projection on this site works in years, not months. ## What a 3 kW system produces, on average The company's June 2025 guide to a 3 kW system in Delhi gives 360 to 400 units a month from 300 to 350 square feet of shadow-free roof. The [calculator](/tools/solar-calculator) on this site plans lower on purpose. It starts from the yield Verde Solaire published on its 2023 savings pages, 1,500 units per kW a year in Noida and 1,450 in Delhi, and takes 10% off for soiling and season. That gives about 338 units a month in Noida and about 326 units a month in Delhi for 3 kW. The derate is a planning assumption, not a measurement of any roof, and the calculator prints it under every result. The gap between the two figures is the seasons. A May reading will sit above the company's higher figure; a foggy January will sit below the calculator's lower one. Neither month tells you whether the system is performing. The year does. Three consequences follow for anyone checking payback: 1. **Judge the system on twelve months.** The payback years on the [worth-it page](/learn/is-rooftop-solar-worth-it-delhi-ncr) come from the annual figure. A system commissioned in November looks weak for three months; one commissioned in March looks better than it is. 2. **Net metering carries the surplus across the seasons.** In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. Summer export offsets winter import on the same connection, so the bill settles on the year's balance. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. 3. **Size on the year's consumption, not the summer bill.** The [sizing guide](/learn/what-size-solar-system-do-i-need) matches annual consumption to annual generation. A system sized to cover June's air-conditioning exports heavily for the other nine months, and export earns less than the units it would have replaced. ## Dust: the loss you control Cloud and fog are weather. Dust is a chore, and the one seasonal loss an owner can keep small. A film of dust scatters the light before it reaches the cells, so the loss grows every dry day after the last wash and disappears with the next. In Delhi NCR the two stretches that matter are the dust storms of April to June and the still, smoggy weeks of October and November. The routine is short: rinse with plain water every two to three weeks in the dry months, always within the week after a dust storm, and once at the end of the monsoon to take off the streaks. Wipe bird droppings the same week, because a dropping shades one cell and that cell heats up. Clean early in the morning from the walkway, with a soft brush and no detergent, and never stand on the panels. The [maintenance and cleaning guide](/learn/solar-panel-maintenance-and-cleaning) has the safe method in full and the annual check, which is best done in September or October, after the monsoon and before the dust. The routine is this site's recommendation, not a rule from a manufacturer or a policy document. ## How to monitor Every inverter records the day's generation, on its display or in its app, and that record is the only way to tell weather from a fault. - **Note a clear-day figure in each season.** One good day in April, August, November and January. Those four numbers are your roof's own pattern, and next year's readings can be judged against them. - **Keep a monthly tally.** Compare the twelve-month sum with the calculator's annual figure for your size and city. - **Test dust with a wash.** Note a clear day's reading, wash, and compare the next clear day. A noticeable recovery means you waited too long. - **Call the installer for zero, not for low.** Low on a foggy day is the season. Zero on a clear day, a missing string, or a fault code that survives a restart is a fault. ## Questions **Do solar panels work in the monsoon?** Yes. Panels generate from diffuse light as well as direct sun, so an overcast day in July or August still produces electricity, just less of it. Output falls on the cloudiest days and recovers on the clear days between showers, and the rain washes off the dust that built up over the summer. The monsoon is already inside the annual planning figure this site uses. **How much does solar output drop in winter in Delhi?** December and January are the lowest months in Delhi NCR because the days are short, the sun sits low, and morning fog can hide it until late morning. This site does not publish a monthly percentage because it varies from year to year with the fog. The annual planning figure of 1,450 units per kW a year in Delhi and 1,500 in Noida, less a 10% derate, already averages the winter in. **How many units does a 3 kW solar system generate in Delhi or Noida?** Verde Solaire's June 2025 post gives 360 to 400 units a month for a 3 kW system. This site's calculator plans lower: 1,500 units per kW a year in Noida and 1,450 in Delhi, less 10% for dust and season, which is about 338 units a month in Noida and about 326 in Delhi. Expect more than that in May and less in January. **Why did my solar generation fall this month?** Check the season first: a drop from October into November, or from November into December, is normal in Delhi NCR as the air thickens and the days shorten. Then check the glass: if a wash on a clear morning brings the next day's reading back up, dust was the cause. A fall on a clear day with clean panels, or a reading of zero, is a fault and needs the installer. **Should I clean solar panels after a dust storm?** Yes, within the week. The dust storms of April to June leave a film on the glass that cuts generation every day it stays there, and the same applies to the still, smoggy weeks of October and November. Use plain water and a soft brush from the walkway, early in the morning, and never stand on the panels. **Do I lose my summer surplus in the winter?** Not in Delhi. Under the DERC net-metering rules the export credits roll over from month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. Summer export therefore offsets winter import on the same connection. In Uttar Pradesh residential consumers choose net or gross metering under the 2019 UPERC regulations, and the DISCOM's settlement terms apply. --- # Net metering in Delhi: BSES, Tata Power-DDL Source: https://www.verdesolaire.com/net-metering/delhi Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A net-metering connection in Delhi is due within 10 days for a rooftop system up to 10 kW and within 25 days above that, and there is no application fee for a domestic system up to 10 kW. Those are the terms of the DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines of 16 July 2026, and they bind BSES Rajdhani, BSES Yamuna and Tata Power-DDL alike. Since the 2024 amendment, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. Use this guide to take a Delhi rooftop system from your electricity bill to a working net meter. It helps you identify your board, choose the right application route, prepare documents and understand each stage through commissioning. ## Which electricity board is yours Delhi has four licensees. Three cover most of the city: BSES Rajdhani in South and West Delhi, BSES Yamuna in East and Central Delhi, and Tata Power-DDL in North and North-West Delhi. The New Delhi Municipal Council (NDMC) serves the Lutyens area through its own process. If your bill carries the NDMC name, send us a message and we will help you with the next step. The name at the top of your bill is the final check. If you are not sure, pick your area and the finder names the board. Each board runs its own rooftop solar desk. BSES Rajdhani's is rts.bsesdelhi.com (helpline 19123, extension 3). BSES Yamuna uses the same BSES Delhi portal family. Tata Power-DDL publishes the net-metering application and manual on tatapower-ddl.com. All three work under the same rules, the DERC (Net Metering for Renewable Energy) Regulations, 2014 and the 2014 Guidelines, as amended in 2024 and 2026. The per-board pages for [BSES Rajdhani](/net-metering/board/bses-rajdhani), [BSES Yamuna](/net-metering/board/bses-yamuna) and [Tata Power-DDL](/net-metering/board/tata-power-ddl) hold what is specific to each. ## Two ways to apply The route depends on whether you are taking the central subsidy. Under the 2026 guidelines, PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. In practice that means one of two paths. - **With the PM Surya Ghar: Muft Bijli Yojana subsidy.** Apply on pmsuryaghar.gov.in. The net-meter application is a stage inside that same application, and your board picks it up from the national portal; you do not file a second application with the board. In Delhi, start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. - **Without the subsidy.** Apply directly on your board's rooftop solar portal, listed above. Households that want imported panels or have taken a solar subsidy before use this route. The scheme's condition on the first route is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and files the application with you on the survey visit, then uploads the plant details after installation. The [nine-step guide](/subsidy/how-to-apply) covers the subsidy application from registration to payout; this page stays with the metering side of it. ## The seven stages, and who acts at each Every net-metering application in Delhi passes through the same seven stages whichever board you are on. The word after each title says who owes the next action, because that is the first thing to establish when a file stops moving. 1. Confirm your board and sanctioned load 2. Feasibility approval 3. Installation by a registered vendor 4. Net-meter application with plant details 5. Inspection and meter installation 6. Commissioning certificate and subsidy claim ### Documents to keep ready The portal and your board set the final list; this is the minimum that every Delhi application has needed. - **Your latest electricity bill.** The consumer number, the sanctioned load and the board's name are read from it, and the number you type must match it exactly. - **Proof that you own the house**, such as the sale deed or a property tax receipt. - **A photo ID of the applicant**, usually Aadhaar, and a passport-size photograph. - **The mobile number linked to the connection.** It receives the one-time password and every status message afterwards. - **Bank account details and a cancelled cheque**, in the applicant's name, uploaded after the commissioning certificate. The installer supplies the plant-details documents. The name on the application should be the name on the bill; if the bill is in a parent's name, apply in that name and use that person's bank account. ## Timeline: the rules and the practice The regulator publishes day counts for two stages and the ministry for one. The table keeps rule and practice apart. | Stage | Official rule | What has been reported | |---|---|---| | Feasibility approval | No feasibility study up to 10 kW on the same supply type (DERC, 26 July 2024); no published day count | Verde Solaire's May 2025 guide put it at a few days for a standard domestic connection | | Connection after the net-meter application, up to 10 kW | Within 10 days (DERC guidelines, 16 July 2026) | Before the amendment, Verde Solaire's Delhi post of 14 July 2025 planned on 20 to 30 days across the three boards | | Connection above 10 kW | Within 25 days (DERC guidelines, 16 July 2026) | Same planning figure; larger systems are inspected in more detail | | Application fee, domestic up to 10 kW | None (DERC guidelines, 16 July 2026) | No customer of ours has been charged one since | | Subsidy after the claim | Within 30 days, about 15 days on average (MNRE, March 2025) | 30 to 45 days after verification, according to news reports of September 2026 | The 20 to 30 day figure is an installer's planning number from a year before the amendment, and the regulator has since written a shorter clock. Whether each board keeps to it is a question of practice, which our customers have described plainly. Arun Sibal, whose New Delhi house was fitted within days of payment, wrote: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde. In fact Verde people always kept me in the loop regarding the net meter status." Navin Verma, with a 10 kW system in Janakpuri, wrote that the installation "was also very quick. However the net metering process was delayed" by the board. Both reviews predate the July 2026 guideline. The subsidy row is the ministry's official figure, "within 30 days" of the claim; about 15 days on average, against reports of 30–45 days after verification in practice. Both counts start at the claim, which follows the commissioning certificate, which follows the meter. A delay at the board postpones the subsidy; it does not cancel it. Net metering in Delhi settles on the net of what you import and export. credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. A summer surplus therefore offsets a winter shortfall within the same financial year, and only what is still standing in March is bought out, at the board's cost of buying power rather than at your tariff. Size to a year of bills, not to export. Two things do not change. Delhi's free-power subsidy, if you have opted into it, is worked out on net units, that is import minus export, so a household whose net units stay under the free slab keeps that benefit after solar. And the fixed charge on the sanctioned load stays on the bill whatever the panels do. The [Delhi tariff explainer](/learn/delhi-electricity-tariff-explained) sets out the slabs and the [bill calculator](/tools/electricity-bill-calculator) shows the result for your own units. ## Virtual net metering, open to everyone since 20 January 2026 Ordinary net metering needs the plant and the meter on the same premises. Virtual net metering credits the generation of a plant against a consumer's meter that is not wired to it, which is what a flat, a builder floor without roof rights or a housing society with one common roof needs. In Delhi, the Seventh Amendment of 20 January 2026 opens virtual net metering to all Delhi consumers, with DISCOMs bearing line and network costs up to set caps. Before the amendment it was limited to particular categories of consumer; since it, any Delhi consumer may apply. The capacity caps per board and the application form sit in the amendment and each board's procedure; we have not reproduced the caps here. Read [solar on builder floors and shared roofs](/learn/solar-on-builder-floors-and-shared-roofs) and the [housing society page](/solutions/housing-societies), and ask us to check your board's current position before you plan around it. ## Installed but not activated: what to do A system that is up but not connected is waiting on stage 5, 6 or 7 above, and the portal tells you which. Do these in order. 1. **Read the stage on the portal and note its date.** Stage 5 belongs to the installer; stages 6 and 7 belong to the board and the portal. The date tells you whether the guideline's clock has run. 2. **If the net-meter application is in and the 10 days have passed, call the board.** BSES Rajdhani's helpline is on rts.bsesdelhi.com (helpline 19123, extension 3). Have the consumer number, the portal application number, the installation date and the date the net-meter application went in. Name the DERC guideline of 16 July 2026 and its day count. 3. **Tell your installer the same day.** The installer is the party the portal expects to act at the vendor stages and is dealing with the same board on other files at the same time. 4. **Check that the installer is not the bottleneck.** In August 2026 MNRE deactivated 66 PM Surya Ghar vendors over applications left pending, and vendors are not to hold an application beyond 60 days. If the portal shows a vendor stage and nothing has moved for weeks, ask in writing what is pending. 5. **Keep the inverter off until the meter is in.** Running the plant on a one-way meter earns nothing. The [full escalation guide](/learn/installed-but-not-activated) covers the ordinary reasons files stall and what each one needs. For our own installations, we file the net-meter application promptly, attend the inspection, and tell you where the file stands without being asked; where a board is past its guideline we say so to the board. We print no response-time promise, because none has been published. ## Questions **How long does net metering take in Delhi?** Under the DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines of 16 July 2026, the connection is due within 10 days for systems up to 10 kW and within 25 days above 10 kW. That is the regulator's clock for BSES Rajdhani, BSES Yamuna and Tata Power-DDL; before the amendment, installers were planning on 20 to 30 days. **Is there a fee for the net-metering application in Delhi?** No. Since 16 July 2026 there is no application fee for a domestic system up to 10 kW under the DERC guidelines. **Which electricity board do I apply to for net metering in Delhi?** The one named at the top of your bill: BSES Rajdhani for South and West Delhi, BSES Yamuna for East and Central Delhi, Tata Power-DDL for North and North-West Delhi. The NDMC area has its own licensee and its own process. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **What happens to the extra units my solar system exports in Delhi?** Export credits roll over from month to month. Any surplus still standing at the end of the financial year is paid at the DISCOM's average power purchase cost, which is lower than your tariff, so size the system to what you use over a year rather than to export. **What is virtual net metering in Delhi?** A way of crediting generation from a solar plant against a consumer's meter that is not wired to it. DERC's Seventh Amendment of 20 January 2026 opened virtual net metering to all Delhi consumers, with the DISCOMs bearing line and network costs up to set caps. It is the route for flats and shared roofs. **My solar system is installed but not activated. Who do I call in Delhi?** Read the stage on the portal first. If the net-meter application has gone in and the guideline's 10 days have passed, call your board: BSES Rajdhani's helpline is 19123, extension 3. Have your consumer number and the application number ready, name the DERC guideline of 16 July 2026, and tell your installer the same day. --- # Net metering in Ghaziabad: PVVNL process Source: https://www.verdesolaire.com/net-metering/ghaziabad Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Net metering in Ghaziabad runs through PVVNL, Paschimanchal Vidyut Vitran Nigam Limited, the UPPCL company that supplies western Uttar Pradesh. Under the UPERC rooftop solar regulations of 2019, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. A subsidised home system is applied for on the PM Surya Ghar: Muft Bijli Yojana portal, and the net meter is one stage of that application; the subsidy of ₹78,000 from the Centre plus a state top-up capped at ₹30,000 per consumer, on top of the central subsidy is paid to your bank account after the meter is in and the commissioning certificate is issued. Use the steps below to prepare your PVVNL application, keep the right documents ready and understand the choice between net and gross metering. ## First, confirm the board and the sanctioned load Ghaziabad and Noida city are both in PVVNL territory. NPCL (Noida Power Company Limited) serves Greater Noida and Greater Noida West only, and Delhi's three licensees stop at the border. For a Ghaziabad home, choose PVVNL on the national portal and enter the consumer number from your bill. The name at the top of your bill confirms the route. The bill also carries your sanctioned load in kW. Under the UPERC framework the DISCOM allows rooftop capacity within transformer limits, and in practice it also looks at the load your connection is sanctioned for. If you want a 3 kW system on a 2 kW connection, ask PVVNL for a load enhancement before you apply, or accept the smaller size. Doing it afterwards means a second application. ## The two application routes There are two doors, and which one you use depends on whether you want the subsidy. **Subsidised systems** go through pmsuryaghar.gov.in. You register with your state, electricity distributor, consumer number and mobile number, then apply for rooftop solar and choose a registered vendor. The installer must be the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh; the [vendor check page](/learn/verify-your-pm-surya-ghar-vendor) shows how to confirm any installer's registration before you pay an advance. **Unsubsidised systems**, where the household gives up the subsidy, apply through PVVNL's own consumer portal, which Verde Solaire's June 2025 Ghaziabad page notes is open for solar applications. One rule differs on this route: consumers who give up the subsidy are exempt from List-II until 31 March 2027, whereas a subsidised system commissioned on or after 1 June 2026 must use cells on the ALMM List-II as well as modules on List-I. Whichever door you use, the eligibility test is the same: an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. ## The seven stages with PVVNL 1. Confirm the board and the sanctioned load 2. Apply on the portal 3. Feasibility approval 4. Installation 5. Net-meter application with plant details 6. Inspection and meter installation 7. Commissioning certificate and subsidy claim The order matters because of money. You pay the installer; the government pays you, after the meter and the certificate. A quote that shows the subsidy as a deduction from the invoice, or an installer who asks you to sign the subsidy over, is departing from the scheme; the quote should show the gross price, the subsidy and the net as three separate lines. ## Documents checklist Keep these ready before the survey, because the portal asks for most of them at registration and the rest at the claim stage. - A recent PVVNL bill, for the consumer number, the sanctioned load and the board's name. - The mobile number linked to the connection; the portal sends its one-time passwords there. - Proof that you own the house, since the eligibility rule requires it. - The installer's registration on the national portal, which you select during the application. - After installation: the plant details and photographs, uploaded by the installer. - For the claim: your bank account details and a cancelled cheque. Nothing on that list costs money to obtain. If an installer asks for a fee to "process" the subsidy, that fee is not part of the scheme. ## What the rules say and what happens in practice Uttar Pradesh has published fewer timelines than Delhi. Delhi's DERC guidelines, amended on 16 July 2026, require a connection within 10 days for systems up to 10 kW. The UPERC regulations give no equivalent day count for a PVVNL net meter, so the table separates what is written from what decides the wait. | Stage | The rule | What decides it in practice | |---|---|---| | Feasibility | Capacity allowed within transformer limits under the UPERC regulations | Spare capacity on the transformer feeding your street; a loaded transformer in a dense colony can mean a smaller sanction or a wait for an upgrade | | Inspection and meter | The DISCOM inspects and installs the meter after the plant details are submitted; no published day count for Uttar Pradesh | The division office's inspection roster and meter stock; this is the stage that stalls most often, and the one worth following up on by application number | | Subsidy payment | "within 30 days" of the claim; about 15 days on average | 30–45 days after verification in practice | | Vendor hold-ups | Vendors must not sit on applications; MNRE deactivated 66 vendors in August 2026 over pending applications | Whether your installer uploads the plant details the week the work finishes, or lets them queue | Two things shorten the wait more than anything else. First, the application should go in before installation, not after, so the feasibility answer arrives while the material is being ordered. Second, the plant details should be uploaded the day the work finishes; the meter request cannot be raised until they are. MNRE's action against vendors holding applications was about exactly this gap. If your system is installed and the meter has not come, the [installed-but-not-activated page](/learn/installed-but-not-activated) sets out who to ask and in what order; UPNEDA's district solar cells are one route, since UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering. ## Net metering, gross metering and net feed-in The Uttar Pradesh rules give a residential consumer the choice. Under net metering the bidirectional meter records what you export and what you import, and the bill is settled on the difference; daytime generation offsets evening consumption unit for unit within the billing period. Under gross metering the whole output is sold to the board at a fixed rate and the house keeps buying every unit at the domestic tariff. For a home that runs air conditioners, a refrigerator and a water pump during daylight, net metering is the better arrangement, and it is the one the subsidy scheme is built around. Surplus is a separate question. For energy injected beyond what the home consumes, the Third Amendment to the UPERC regulations set compensation at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). Verde Solaire wrote in May 2023, when UPERC approved the net feed-in arrangement, that net feed-in is a different arrangement from net metering and was expected to matter most for commercial, industrial and institutional rooftops. For a house the practical point is to size the system to your own consumption rather than to export: the sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW, applied to twelve months of bills rather than a summer one. ## What Verde Solaire does in Ghaziabad Verde Solaire's June 2025 Ghaziabad page lists service coverage across Vaishali, Indirapuram, Raj Nagar, Crossing Republik and Sahibabad, and offers documentation for the subsidy, the loan and net metering as part of the job. There is no Ghaziabad office; the head office in Sector 47, Noida is the nearest, and the survey team works from there. The published reviews are from PVVNL's Noida side of the same process rather than Ghaziabad itself. Brij Lal Bhardwaj, with 4 kW at his Sector 25 house, described the team completing the installation, the documentation and the liaison with the electricity board for the net meter, and then getting the subsidy processed. Mr. L. R. Singh, with 6 kW, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". Every review is on the [reviews page](/reviews) in full, with the city where the customer gave one. Costs for the system itself, with the subsidy applied by capacity, are on the [Ghaziabad pricing page](/pricing/ghaziabad); the site visit and the roof-right question on builder floors are on the [Ghaziabad installation page](/solar-installation/ghaziabad). The board's own process page, shared with Noida, is the [PVVNL guide](/net-metering/board/pvvnl). ## Questions **Which electricity board does net metering in Ghaziabad?** PVVNL, Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company. It also serves Noida city. NPCL serves only Greater Noida and Greater Noida West. The name printed on your bill is the final word. **Where do I apply for net metering in Ghaziabad?** If you want the PM Surya Ghar subsidy, apply on pmsuryaghar.gov.in with your PVVNL consumer number; the net-meter request is a step inside that application. If you are giving up the subsidy, apply through PVVNL's own consumer portal. **How long does net metering take with PVVNL?** Uttar Pradesh has not published a day count the way Delhi has (10 days for systems up to 10 kW). The subsidy, once the meter is in and the commissioning certificate is issued, is officially paid within 30 days; September 2026 news reports put it at 30 to 45 days after verification. **Net metering or gross metering: which should a Ghaziabad home choose?** Net metering. Under the UPERC 2019 rooftop regulations a residential consumer may choose either, but gross metering sells the whole output at a fixed rate while you keep buying at the tariff, which rarely pays for a house with daytime use. **What documents does a PVVNL net-metering application need?** A recent PVVNL bill showing the consumer number and sanctioned load, the mobile number linked to the connection, proof that you own the house, the installer's plant details and photographs after installation, and your bank details with a cancelled cheque for the subsidy. **Can I get more capacity than my sanctioned load?** The DISCOM sanctions capacity within the limits of the local transformer. If your bill shows a lower sanctioned load than the system you want, ask PVVNL for a load enhancement before the feasibility stage, or size the system to the load. **Does Verde Solaire handle the PVVNL application?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in Uttar Pradesh, files the portal application, uploads the plant details, attends the inspection and follows the meter and the subsidy through to payment. Its June 2025 Ghaziabad page lists Vaishali, Indirapuram, Raj Nagar, Crossing Republik and Sahibabad. --- # Net metering in Greater Noida: NPCL process Source: https://www.verdesolaire.com/net-metering/greater-noida Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Net metering in Greater Noida and Greater Noida West is handled by NPCL (Noida Power Company Limited), not by the UPPCL company that serves Noida city. The rules come from the Uttar Pradesh Electricity Regulatory Commission (UPERC), the subsidy application goes through the national PM Surya Ghar: Muft Bijli Yojana portal, and the meter itself is fitted by NPCL after its inspection. Verde Solaire files the application on NPCL's portal for every Greater Noida customer and follows it to activation. Use this guide to work through NPCL’s seven stages, prepare your documents and plan the route from application to commissioning. Timelines are labelled clearly when they come from regulations rather than reported experience. ## First check the name on your bill The distributor for Greater Noida and Greater Noida West is NPCL (Noida Power Company Limited). It is a separate licensee with its own portal and its own inspection team, distinct from the Uttar Pradesh Power Corporation (UPPCL) companies that serve the rest of the state. Choose the distributor named on your bill, not the one suggested by a sector name or pin code. An application sent to the wrong distributor cannot be matched to your connection and will stall at feasibility. If the bill says PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), use the [Noida net-metering guide](/net-metering/noida); if it says NPCL, you are in the right place. ## What the UPERC rules say The framework is the state's, not NPCL's: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net metering means one bidirectional meter records the units you export in the day and the units you import at night, and the bill is worked out on the difference. Gross metering pays you a tariff for everything you generate and bills you separately for everything you use; it suits a roof that generates far more than the house consumes, which is rare for a home. The transformer limit matters in the newer societies of Greater Noida West. The DISCOM may decline capacity that would overload the local transformer, so a 10 kW request on a connection with a small sanctioned load can be trimmed at feasibility. Sizing to the sanctioned load, or applying for a load increase first, avoids that. Surplus that is still unused is compensated at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). Verde Solaire's July 2025 post for the region put the point plainly: net metering is allowed by both NPCL and PVVNL, and the company handles the full application and the follow-up. ## The seven stages, in order The order below follows the national portal's process, with the NPCL-specific parts marked. Every subsidised installation must use both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on ALMM List-II, the approved list of cell models and manufacturers. Under the scheme, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh; check the listing yourself before paying an advance, as the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) explains. ## The documents checklist Keep these to hand before the application is started. The first four are what Verde Solaire's published Noida and Greater Noida guide lists; the rest are what the national portal asks for at registration and at the subsidy stage. - The latest NPCL electricity bill, for the consumer number, the licensee name and the sanctioned load. - Aadhaar of the consumer in whose name the connection stands. - A second identity proof. - Your signature on the application and the net-metering agreement forms. - The mobile number linked to the connection, for the one-time password at registration. - Proof that you own the house; the scheme's eligibility is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. - For the subsidy claim, your bank details and a cancelled cheque. The installer supplies the technical file: the single-line diagram, the module and inverter datasheets and certificates, the installation photographs and the safety certification. If the connection is in a parent's or a previous owner's name, get the name changed with NPCL first; the subsidy is paid to the account of the consumer on the bill. ## Timeline: official rules and practice The honest answer to "how long does net metering take with NPCL" is that only parts of it are fixed by anyone. The table separates the two. | Stage | Official rule | What is reported in practice | |---|---|---| | Feasibility approval | No UPERC day count published for Uttar Pradesh; Delhi's DERC, by contrast, requires a connection within 10 days for systems up to 10 kW | Depends on the local office; the stage to chase if nothing moves in two weeks | | Installation | Not regulated | Customers' reviews describe installation within days of payment; the survey date and material delivery decide it | | Net-meter inspection and fitting | Not fixed by NPCL | Typically 20 to 30 days after installation | | Subsidy payout | "within 30 days" of the claim; about 15 days on average | 30–45 days after verification in practice | There is one published data point from this side of the expressway. In April 2023 Verde Solaire commissioned a 10 kW plant on a Greater Noida rooftop and wrote that the DISCOM had installed the net meter very quickly. One case from 2023 is not a rule, but it shows the board can move fast when the file is complete. ## Where the file stalls, and who to call Three things are worth checking before you chase the board, because each sends a file back or leaves it waiting. The first is a mismatch between the sanctioned load and the requested capacity, which is caught at feasibility. The second is an incomplete technical upload at the net-meter stage: a missing certificate, or photographs that do not show the earthing. The third is the meter change itself, which waits on NPCL's field team and is the stage a homeowner can do least about. If a stage stalls, UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering. The district cell for Gautam Buddh Nagar is the office that can ask NPCL for a status on your behalf. Verde Solaire's coordinators keep customers informed at each stage; a Delhi customer, Arun Sibal, wrote that the delay in his net meter "was actually not in control of Verde" and that "Verde people always kept me in the loop regarding the net meter status". That is the useful thing an installer can promise: not that the board will be quick, but that you will know where the file is. The [installed but not activated](/learn/installed-but-not-activated) guide covers what to do in the gap between commissioning and energisation. ## What the net meter is worth on an NPCL bill Uttar Pradesh's urban domestic tariff applies in Greater Noida, and NPCL charges the same slab rates as the state DISCOMs with a 10% regulatory discount. The fixed charge is ₹110 per kW per month on the sanctioned load. The discount has a small consequence for net metering. Each unit your system offsets is worth a little less to you than it would be on a PVVNL bill across the expressway, so the same 3 kW system pays back a few months later in Greater Noida than in Noida city. The fixed charge stays on the bill whatever the meter reads, which is why no honest page promises a nil bill. A 3 kW system here generates about 338 units a month; the [bill calculator](/tools/electricity-bill-calculator) shows what remains after those units are netted off for your own consumption and load, and the [Greater Noida pricing page](/pricing/greater-noida) has the cost and subsidy for 1 to 10 kW. ## Greater Noida West and society roofs Greater Noida West is inside NPCL's area. Its high-rise societies raise a different question from the villas in the lettered sectors: whose connection is the system on. An individual flat owner usually has no roof right, so the practical route is a society-level system on the common-area connection, which the scheme supports at ₹18,000 per kW; the [housing societies page](/solutions/housing-societies) sets it out. A villa inside a gated society needs the society's consent for the roof and the cable route before the feasibility visit, and it helps to have that letter in the file from the start. Independent houses in the Alpha, Beta, Gamma, Delta, Zeta and Omicron sectors and around Pari Chowk are the simplest case, and the ones Verde Solaire's July 2025 service list names. The [installation page for Greater Noida](/solar-installation/greater-noida) describes the roof survey that comes before the application. ## Questions **Which electricity board does net metering in Greater Noida?** NPCL (Noida Power Company Limited) serves Greater Noida and Greater Noida West, including the lettered sectors, Pari Chowk and the societies and villas of Greater Noida West. Noida city and Ghaziabad are PVVNL. The licensee named on your bill is the one that fits your net meter. **How do I apply for net metering in Greater Noida?** If you want the PM Surya Ghar subsidy, register on pmsuryaghar.gov.in with Uttar Pradesh, NPCL, your consumer number and mobile number, then apply for rooftop solar. The net-meter request is filed with NPCL after installation, with the plant details. Without the subsidy, the application goes straight to NPCL. **How long does net metering take with NPCL?** UPERC has not fixed a day count for this, unlike Delhi's 10-day rule. Verde Solaire's published planning figure for Noida and Greater Noida is 20 to 30 days after installation. The subsidy follows the commissioning certificate, officially within 30 days of the claim and 30 to 45 days in reported practice. **Which documents are needed for an NPCL net-meter application?** Your NPCL electricity bill with the consumer number, Aadhaar, an identity proof, your signature on the application forms, a mobile number linked to the connection, and for the subsidy a cancelled cheque and bank details. The installer adds the plant details, photographs and the equipment certificates. **Can I choose gross metering instead of net metering in Greater Noida?** Yes. Under the UPERC rooftop solar regulations of 2019, residential consumers in Uttar Pradesh may choose net or gross metering, within the capacity the DISCOM allows on the local transformer. Nearly every home chooses net metering, because the exported units offset the units imported at night. **Does NPCL's 10% discount change the value of net metering?** Slightly. NPCL is reported to charge the state's domestic slab rates with a 10% regulatory discount, so each unit your rooftop system offsets is worth a little less than it would be on a PVVNL bill in Noida. The subsidy is unaffected; it is a central and state matter, not the board's. **What happens to surplus units at the end of the month?** Net-metering credits carry forward. Under the UPERC regulations, surplus energy injected into the grid is compensated at the weighted-average large-solar tariff plus 25%. --- # Net metering in Noida: PVVNL process Source: https://www.verdesolaire.com/net-metering/noida Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Net metering in Noida city is handled by PVVNL, a UPPCL company, and not by NPCL, which serves Greater Noida. For a subsidised system the application starts on the PM Surya Ghar: Muft Bijli Yojana portal, PVVNL gives feasibility approval, a registered vendor installs the system, PVVNL inspects it and fits the bidirectional meter, and the subsidy is paid to your bank account, officially "within 30 days" of the claim; about 15 days on average. Verde Solaire files that application, attends the inspection and follows the meter through to activation on every Noida system it installs. Use the guide below to prepare a Noida application with the right electricity board, documents and next steps. It also explains the Uttar Pradesh rules and the usual path from application to meter activation. ## PVVNL, not NPCL: check the name on your bill Noida city's electricity distributor is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). It is the licensee for Noida city, Ghaziabad and western Uttar Pradesh under the state holding company UPPCL, and its Noida offices handle the feasibility check, the inspection and the meter. The national portal asks for your distribution company at the very first step, so settle it before you register: the licensee's name is printed at the top of your bill. Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited), a separate licensee with its own portal and inspection team. If your bill is for a Noida-city sector, apply through PVVNL; if it says NPCL, use the [Greater Noida guide](/net-metering/greater-noida) instead. ## What the UPERC rules allow The rules come from the Uttar Pradesh Electricity Regulatory Commission (UPERC), not from PVVNL. under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net metering sets the units you export by day against the units you import at night and bills the difference. Gross metering sells everything you generate at a fixed rate while you go on buying everything you use at the tariff. Almost every home chooses net metering, because a unit you avoid buying costs more than a unit you sell. The third amendment of the regulations, in force from July 2025, set a rate for the surplus a home injects into the grid: the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). The transformer limit is the part of the rule that decides real applications. PVVNL approves capacity on a feeder only within what the local transformer can take, and a lane where several houses have already installed solar can be full. That is a site question, not a policy question, and it is why the survey visit checks the sanctioned load on your connection and the transformer before we size a system. UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering, so if a case stalls between PVVNL and the portal, the district solar cell is the state body to ask. ## The process, stage by stage For a subsidised system the route is fixed by the scheme: the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. The seven stages below are the same nine portal steps the [how-to-apply guide](/subsidy/how-to-apply) walks through, grouped the way PVVNL sees them. Nothing in this sequence is paid to PVVNL by you through us. You pay the installer, the portal pays you, and the [who pays whom](/subsidy/who-pays-whom) page sets out that order with a worked example for Noida. ## Documents to keep ready The portal and PVVNL set the final list, and the ones every application uses are short. Keep them together before you register, because the consumer number and the name have to match across all of them. - **Your latest PVVNL bill.** The consumer number, the sanctioned load and the licensee's name are all read from it. - **Proof that you own the house**, such as the sale deed or the property tax receipt. Eligibility rests on owning the roof. - **A photo ID** of the applicant, usually Aadhaar, and a passport-size photograph. - **The mobile number linked to the connection**, because the portal verifies it with a one-time password. - **Bank account details and a cancelled cheque**, needed at the claim stage after commissioning, in the applicant's name. - **Plant details after installation**: the module and inverter make and model and the installed capacity. The vendor uploads these; ask for a copy. The applicant must be an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. If any of those conditions is doubtful, the [eligibility checker](/subsidy/eligibility-checker) settles it in seven questions. ## Timeline: the official rules and what happens in practice The honest answer on timing is that Uttar Pradesh has published far less than Delhi. The table separates the two. | Stage | Official rule | What we see in practice | |---|---|---| | Feasibility approval | The UPERC regulations set the metering options and the transformer principle; no published PVVNL turnaround | Depends on the transformer check for your feeder; ask to see the approval on the portal before paying an advance | | Net meter after installation | No published time limit in the UPERC regulations or PVVNL policy. Delhi's DERC guidelines require a connection within 10 days for systems up to 10 kW; Uttar Pradesh has no published equivalent | The stage most likely to sit; the installer's follow-up with the PVVNL office decides it | | Subsidy after the claim | "within 30 days" of the claim; about 15 days on average | 30–45 days after verification in practice | Two things follow from that table. First, a Noida quote that promises a net meter "in ten days" is quoting Delhi's rule, not Noida's. Second, the gap between commissioning and activation is where most complaints about installers arise, in Noida as elsewhere, and the [installed but not activated](/learn/installed-but-not-activated) guide explains what an installer can and cannot do in that gap. ## What we file and follow, and what Noida customers wrote Verde Solaire's head office is in Sector 47, Noida, and the PVVNL process is one it runs every week. At the survey we fill in the portal application with you, confirm the licensee and the sanctioned load from the bill, and check the transformer. After installation we upload the plant details, apply for the net meter, attend the PVVNL inspection and keep following the case until the bidirectional meter is fitted and the commissioning certificate is on the portal. The survey and the proposal are a free site evaluation and no-obligation proposal. Customers in Noida have written about exactly this part of the job. The owner of a 4 kW system in Sector 25 wrote that the team did the complete installation, including the documentation and the liaison with the electricity department for the net meter, and that the subsidy was processed for him. Mr. L. R. Singh, who installed a 6 kW system in Noida, wrote: "I was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire." One review from a Delhi customer is worth reading alongside those, because it describes the part no installer controls. Arun Sibal wrote that the only issue was the time BSES took to install the net meter, which was not in Verde Solaire's control, and that "Verde people always kept me in the loop regarding the net meter status." That is the promise we can make in Noida too: not a date PVVNL has not published, but a case that is filed correctly, followed weekly, and reported to you. ## Sizing against the sanctioned load PVVNL approves capacity against two limits: the sanctioned load on your connection and the transformer on your feeder. The scheme's own sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. A quick check is to add twelve months of bills and divide by twelve, because a summer bill alone will oversize the system and a system above the sanctioned load will not clear feasibility. The subsidy shapes the size too. On a 3 kW system the combined subsidy in Uttar Pradesh is ₹1,08,000, made up of ₹78,000 from the central scheme and ₹30,000 from the state, and nothing is added above 3 kW. The [Noida price page](/pricing/noida) has the published price and the net figure for each size, and the [system size calculator](/tools/system-size-calculator) works from your bill. If you live on a builder floor or share the roof, the [shared roofs guide](/learn/solar-on-builder-floors-and-shared-roofs) covers the roof right and the sanctioned load question first. Subsidised systems must use both the modules and the cells must be made in India, and since 1 June 2026 the cells must appear on ALMM List-II. PVVNL checks the module details at inspection, so the make and model on your quote should be the ones on the roof. ## What the bill looks like after the meter Once the bidirectional meter is in, PVVNL bills you on net units. The energy charge on the units your system covers disappears; the fixed charge does not. Uttar Pradesh urban domestic connections pay a fixed charge of ₹110 per kW per month, and it stays on the bill whatever the panels generate. The [bill calculator](/tools/electricity-bill-calculator) shows the arithmetic for your units and sanctioned load, and the [Noida tariff guide](/learn/noida-electricity-tariff-explained) explains each line of the PVVNL bill. ## Questions **Is Noida's electricity board NPCL or PVVNL?** Noida city is served by PVVNL, Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company. NPCL serves Greater Noida and Greater Noida West. The licensee's name is printed at the top of your bill, and that name is the one you select on the PM Surya Ghar portal. **How do I apply for net metering in Noida?** For a subsidised system, register on pmsuryaghar.gov.in with Uttar Pradesh, PVVNL and your consumer number, apply for rooftop solar, wait for PVVNL's feasibility approval, get the system installed by a registered vendor, submit the plant details and apply for the net meter, then PVVNL inspects and fits the bidirectional meter. Verde Solaire files and follows all of this for the systems it installs. **How long does PVVNL take to install the net meter in Noida?** The UPERC regulations do not set a published deadline the way Delhi's DERC guidelines require 10 days for systems up to 10 kW. The subsidy itself is officially paid within 30 days of the claim; September 2026 news reports put it at 30 to 45 days after verification in Uttar Pradesh. **Can I choose gross metering instead of net metering in Noida?** Yes. Under the UPERC rooftop solar regulations of 2019, residential consumers may choose net or gross metering, within the capacity PVVNL allows on the local transformer. Almost every home chooses net metering, because a unit you avoid buying is worth more than a unit you sell. **What documents does a Noida net-metering application need?** Your latest PVVNL bill, proof that you own the house, a photo ID and a passport-size photograph, the mobile number linked to the connection, and, at the claim stage, your bank details with a cancelled cheque. The vendor uploads the plant details after installation. The portal and PVVNL set the final list. **What happens to the surplus units my system exports in Noida?** Under net metering the exported units are set against the units you import and the bill is raised on the difference. The third amendment of the UPERC regulations, in force from July 2025, sets a compensation rate for injected surplus at the weighted-average large-solar tariff plus 25%. **Does Verde Solaire file the PVVNL application for me?** Yes. The application is in your name and on your login, but Verde Solaire fills it in with you at the survey, uploads the plant details after installation, attends the PVVNL inspection and follows the meter through to activation. It is a registered PM Surya Ghar vendor in Uttar Pradesh. --- # NISST Punjab: 20 kW for Central Electronics Source: https://www.verdesolaire.com/projects/nisst-punjab-20-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 20 kW on-grid rooftop solar plant at the National Institute of Secondary Steel Technology (NISST) in Punjab, on an order from Central Electronics Limited (CEL), a Government of India organisation. The panels were CEL's own make, and Verde Solaire carried out the work as a CEL-registered installation firm. This case study is based on A. K. Singh's published review for Central Electronics Limited, together with the confirmed capacity, grid connection and CEL modules. ## What was installed The plant is 20 kW, connected to the institute's supply and to the grid, with CEL modules. It is designed to serve the institute's daytime electricity use alongside the grid. For scale, 20 kW is the same capacity as the [school plant in Ayodhya](/projects/ayodhya-school-20-kw), and a little more than half the 35 kW system at the [college in Greater Noida](/projects/greater-noida-college-35-kw). Plants of this size suit institutions whose load runs through the working day, which is when the panels produce. ## Why the order came through CEL Central Electronics Limited is a Government of India organisation that also makes solar panels. In this project it was both the buyer and the module supplier: it had the plant installed at NISST, and the panels were its own make. A. K. Singh's review says Verde Solaire is a CEL-registered firm for solar panel installation, and the company's About page says it is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. A registration of that kind is what a public-sector buyer checks before placing an order with a private installer, and it is the reason the review names it. ## What the customer wrote A. K. Singh's review closes with the two sentences that matter most to anyone weighing up an installer for a government site: "The solar panels used were of CEL make. Verde is a CEL registered firm for solar panel installation and we were very happy with their work." The full review, as published, is below. ## Part of a wider institutional record NISST is one of several government and educational plants Verde Solaire has published through its customers' own words. A 147 kW plant at [C-MET Pune](/projects/c-met-pune-147-kw) was ordered through CPWD and built with Emmvee panels and a Delta inverter. A 170 kW plant at a [Patna division](/projects/patna-division-170-kw) followed a tender. The people who run the Ayodhya school and the Greater Noida college both wrote that their plants were working well and cutting the electricity bill. Across all its work the company reports more than 50 MW of solar projects and is ISO 9001:2015 certified. How it approaches tenders, daytime load matching and zero-export requirements for institutional buyers is set out on the [institutions page](/solutions/institutions). Explore more installations on the [projects page](/projects) and customer feedback on the [reviews page](/reviews). ## Questions **Who installed the 20 kW solar plant at NISST Punjab?** Verde Solaire installed it on an order from Central Electronics Limited (CEL), a Government of India organisation. The project is described in a review by A. K. Singh on Verde Solaire's testimonials page. **Which solar panels were used at NISST Punjab?** Panels made by Central Electronics Limited (CEL), as stated in the customer's review. The make of the inverter has not been published. **What does it mean that Verde Solaire is a CEL-registered firm?** The review says Verde Solaire is registered with CEL for solar panel installation. The company's own About page lists CEL among the bodies it is registered with, alongside IOCL, UHBVN, DHBVN, IPGCL, BRPL and CREST. **Is the NISST plant on-grid or off-grid?** On-grid. The reviewer describes it as a grid-tied plant, which means it feeds the institute's supply alongside the grid. No battery has been published for this site. **When was the NISST plant installed, and how much does it generate?** Neither the year nor the generation figures have been published. Verde Solaire lists only what the customer wrote: capacity, place, panel make and the CEL registration. **Does Verde Solaire build solar plants for government institutions outside Delhi NCR?** Yes. Published institutional projects include NISST in Punjab (20 kW), a school in Ayodhya (20 kW), a college in Greater Noida (35 kW), C-MET Pune (147 kW, ordered through CPWD) and a 170 kW plant at a Patna division won on tender. --- # Noida electricity tariff explained (2026) Source: https://www.verdesolaire.com/learn/noida-electricity-tariff-explained Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A Noida home pays ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, plus a fixed charge of ₹110 per kW per month of sanctioned load. Uttar Pradesh Electricity Regulatory Commission (UPERC) left these unchanged for FY 2026-27. A 300-unit month on a 2 kW connection comes to about , which is per unit before duty, and a 2 kW rooftop system takes about two-thirds of that off. This guide sets out the slabs, the fixed charge, the difference between PVVNL and NPCL, and a worked bill before and after solar. ## The slabs: four steps, billed telescopically The urban domestic schedule has four energy-charge slabs. They are telescopic, which means a household is not billed at one rate for everything. The first 150 units are charged at the lowest rate, the next 150 at the second, the next 200 at the third, and everything past 500 at the top rate. A 320-unit month is therefore not 320 units at the third rate; it is 150 at the first, 150 at the second and 20 at the third. | Units in the month | Rate per unit | |---|---| | 0 to 150 | | | 151 to 300 | | | 301 to 500 | | | above 500 | | The ladder is short. The top rate is about a quarter above the bottom one, so a Noida bill grows roughly in step with consumption. Delhi's ladder, explained on the [Delhi tariff page](/learn/delhi-electricity-tariff-explained), starts far lower and climbs far steeper, which is why a Noida home pays more than a Delhi home for a modest winter month and about the same for a heavy summer one. The [summer air-conditioning guide](/learn/cut-your-summer-ac-bill-delhi-noida) works through that comparison at 300 and 800 units. ## The fixed charge, and why the sanctioned load matters On top of the energy charge sits a fixed charge of ₹110 per kW per month. It is billed on the sanctioned load, the kW figure printed on your connection, not on what you used. A home sanctioned at 2 kW pays a month before switching anything on; at 5 kW it pays . This line is worth reading on your own bill for two reasons. It never goes away, not even with a rooftop system that covers every unit, and a sanctioned load that is much higher than you need is money paid for nothing. Electricity duty, any regulatory surcharge and arrears sit below these lines on the printed bill. The [electricity bill calculator](/tools/electricity-bill-calculator) models the energy and fixed charges only, so its total will be a little below the printed one. ## PVVNL or NPCL: check the name on the bill Two companies bill homes in the Noida area, and the difference matters for net metering and for the PM Surya Ghar: Muft Bijli Yojana application, which asks you to pick your electricity board before anything else. Noida city, the numbered sectors, is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Look at the top of your bill: the name there is the board you apply through. The slab rates are the same under both. The reported difference is that NPCL charges the same slab rates as the state DISCOMs with a 10% regulatory discount. On the 300-unit bill worked below, a tenth off the whole bill would be about a month. Treat that as a typical reduction and check your own bill to see how it applies to your charges. The two boards run different net-metering portals and different inspection queues. The [PVVNL board page](/net-metering/board/pvvnl) and the [NPCL board page](/net-metering/board/npcl) cover each process; the [Noida net-metering guide](/net-metering/noida) explains the stages common to both. ## A worked bill: 300 units on a 2 kW connection Take a household that reads 300 units on the meter for the month and has a sanctioned load of 2 kW. The energy charge is 150 units at the first rate, , plus 150 units at the second rate, , giving . The fixed charge on 2 kW is . The bill before duty is , or about per unit. That is above the figure often quoted for the state, ₹5.82 per unit. The average covers every domestic consumer in Uttar Pradesh, including small and rural connections on cheaper rates, so a 300-unit urban home carrying a fixed charge sits above it. If your own bill divides out near the state average, check whether the month was light or the sanctioned load small. The same arithmetic on a 500-unit month gives an energy charge of , since the extra 200 units all land in the third slab, and a bill of on the same 2 kW load. The slabs are why a summer month costs more per unit than a winter one even though the rates have not changed. ## What a rooftop system does to that bill Net metering runs the units you generate through the meter in the opposite direction, and the board bills you on the net figure. Because the slabs are telescopic, the units removed come off the top of the ladder, at the dearest rate first. Under under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits; most homes take net metering. On the planning yield Verde Solaire publishes for Noida, with a 10% derate for dust and monsoon, a 2 kW system generates about 225 units a month. For the 300-unit household above, that leaves about 75 units to buy, all in the first slab, so the energy charge falls to about and the bill to about with the fixed charge. The saving is about a month, or roughly a year on twelve equal months. The published 2 kW price is ₹1,35,000 to ₹1,50,000, and after the central subsidy and the Uttar Pradesh top-up the net is ₹45,000 to ₹60,000, which the saving repays in about 2.9 to 3.8 years on those assumptions. The [2 kW price page](/pricing/2-kw) and the [Noida price page](/pricing/noida) hold the subsidy workings. A 3 kW system generates about 338 units a month, more than this household uses, so the energy charge goes to nil and the surplus is carried as credit under the net-metering rules. The bill that remains is the fixed charge. The sceptic's check is simple: the fixed charge is the floor, and no system, however large, takes the bill below it. Size on the twelve-month average, not on the hottest month, because generation is credited against consumption over the year rather than matched hour by hour. ## Reading your own bill Four lines decide the number at the bottom: the units consumed, which set the slab charge; the sanctioned load in kW, which sets the fixed charge; the board's name, which decides the portal; and the duty and arrears lines, which the slabs do not explain. If a bill looks wrong, check whether it covers two months rather than one, because a bimonthly reading pushes twice the units through the same slab ladder. ## Questions **What is the electricity rate per unit in Noida in 2026?** For urban domestic connections, ₹5.50 per unit for the first 150 units, ₹6.00 for 151 to 300, ₹6.50 for 301 to 500 and ₹7.00 above 500, plus a fixed charge of ₹110 per kW of sanctioned load a month. UPERC kept these unchanged for FY 2026-27. **Is the tariff in Greater Noida different from Noida?** The slab rates are the same. Greater Noida and Greater Noida West are served by NPCL, which is reported to apply a 10% regulatory discount on top of the state slabs. Noida city is served by PVVNL, a UPPCL company, with no such discount. **How much is a 300-unit electricity bill in Noida?** About ₹1,945 a month on a 2 kW sanctioned load: ₹825 for the first 150 units, ₹900 for the next 150 and ₹220 of fixed charge. Electricity duty and any arrears are on top. That works out to about ₹6.48 per unit. **Why is my average rate higher than the UP average of ₹5.82 per unit?** ₹5.82 is the average across all domestic consumers in Uttar Pradesh, including small and rural connections billed at lower rates. A 300-unit urban home with a 2 kW load lands in the second slab and carries a fixed charge, so its own average is about ₹6.48. **How does rooftop solar change a Noida bill?** Net metering removes the units you generate from the top of the slab ladder, so the dearest units go first. A 2 kW system generates about 225 units a month on the published planning yield, taking a 300-unit bill from about ₹1,945 to about ₹633. The fixed charge of ₹110 per kW stays whatever the system does. **Which electricity board should I select on the PM Surya Ghar portal for Noida?** Check the name printed on your bill. Noida city bills come from PVVNL (Paschimanchal Vidyut Vitran Nigam Limited); Greater Noida and Greater Noida West bills come from NPCL (Noida Power Company Limited). Choosing the wrong one stalls the feasibility stage. --- # Noida: 9 kW residence Source: https://www.verdesolaire.com/projects/noida-9-kw-residence Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 9 kW rooftop solar plant at a house in Noida, Uttar Pradesh, using Adani bifacial half-cut mono PERC modules, and posted the installation on 19 August 2023 with a note that it was helping the owner apply for the solar subsidy. The owner's review on Verde Solaire's testimonials page describes the team as cooperative throughout the work and the workmanship as good. The 9 kW system combines Adani bifacial modules with an elevated structure, giving the home a larger array while keeping the terrace practical to use. ## At a glance | System detail | Project information | |---|---| | Owner | Private residence | | Location | Noida, Uttar Pradesh | | Rated system power | 9 kW | | Modules | Adani bifacial half-cut mono PERC | | Subsidy | Verde Solaire wrote that it was helping the owner with the subsidy application | | Posted | 19 August 2023 | The photograph published with the post shows the modules on a raised steel structure well above the terrace, which leaves the roof usable underneath. A bifacial module takes light on both faces, so on a raised array the light reflected off the terrace adds to what the front face collects. Verde Solaire used the same make of module on its [10 kW bifacial installation in Greater Kailash, Delhi](/projects/greater-kailash-delhi-10-kw-bifacial), where the customer wrote that the company supplied the bifacial panel without charging extra. The [solar panels page](/equipment/solar-panels) explains what half-cut and mono PERC mean. ## What 9 kW means for a Noida home Verde Solaire's published planning figure for Noida is about 338 units a month from a 3 kW system. Scaled three times, a 9 kW system comes to about 1013 units a month after the derate for dust and monsoon that the site's calculators apply. That is a large house with several air conditioners running through the summer. The subsidy does not scale the same way. This plant was posted before PM Surya Ghar: Muft Bijli Yojana was launched in February 2024, so the rules below are today's, not the ones the owner applied under. The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, capped at ₹78,000 for any system of 3 kW or more. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy. A 9 kW system therefore draws exactly the subsidy a 3 kW system draws, and the six kilowatts above the cap are paid for in full. The [Noida price page](/pricing/noida) has the published prices up to 5 kW; larger systems are quoted per site after a survey. Noida city's electricity distributor is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company), not NPCL, which serves Greater Noida. The [Noida net-metering page](/net-metering/noida) covers the application stages and the documents. ## The owner's review The review is published under the heading "Solar power plant at residence" rather than the owner's name. It opens by saying that a 9 kW plant was installed by Verde Solaire at the owner's Noida residence, and continues: > "Verde and its people were very cooperative throughout the work and actively got the work done. I am very happy with the installation processes and workmanship of Verde and would recommend them for good quality solar plant installation." > > Solar power plant at residence, Noida It is one of several reviews from Noida homes on the company's testimonials pages, alongside a 4 kW system in Sector 25, a 7 kW system in Sector 41 and a 20 kW system. The [Noida installation page](/solar-installation/noida) describes the process a Noida house goes through, and [reviews](/reviews) lists the reviews in full. ## Questions **How big is the Verde Solaire solar plant at the Noida residence?** It is a 9 kW rooftop plant at a private house in Noida, built with Adani bifacial half-cut mono PERC modules. Verde Solaire posted the installation on 19 August 2023. **Which solar panels were used on the 9 kW Noida house?** Adani bifacial half-cut mono PERC modules. **How much subsidy does a 9 kW home system get in Noida?** Under PM Surya Ghar the central subsidy is capped at ₹78,000 for any system of 3 kW or more, and Uttar Pradesh adds ₹15,000 per kW capped at ₹30,000, so a 9 kW home system draws ₹1,08,000 in total, the same as a 3 kW system. The capacity above 3 kW is paid for in full. **How many units would a 9 kW system generate in Noida?** Verde Solaire's published planning figure is 360 to 400 units a month for 3 kW in Noida. Scaled three times, a 9 kW system would generate roughly 1,080 to 1,200 units a month, before the derate for dust and monsoon that the calculators apply. **Which electricity board handles net metering for a Noida house?** Noida city is served by PVVNL, a UPPCL company. Greater Noida and Greater Noida West are served by NPCL. The name printed on your electricity bill settles which one applies to you. --- # NPCL net metering: application pack Source: https://www.verdesolaire.com/net-metering/board/npcl Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Net metering in Greater Noida and Greater Noida West goes through NPCL (Noida Power Company Limited), the private licensee for the area, and not through PVVNL, which serves Noida city. The rules come from the state regulator: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The stages are the seven of the PM Surya Ghar: Muft Bijli Yojana application, and the only day counts to plan around are an installer's planning figure of 20 to 30 days for the meter and the ministry's figure of "within 30 days" of the claim; about 15 days on average for the subsidy. The steps below are the national portal's stages, which apply to every board in the scheme, combined with what Verde Solaire has learned from Greater Noida installations. Where NPCL's procedure adds a specific form or fee, ask for it in writing. ## Who NPCL serves, and how to confirm it NPCL is a distribution licensee separate from the Uttar Pradesh Power Corporation (UPPCL) companies. It serves Greater Noida and Greater Noida West; Noida city's numbered sectors and Ghaziabad are served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). Use the licensee printed on your bill so the application reaches the right portal. The check takes ten seconds: read the licensee's name printed at the top of the latest bill. Two more lines on it matter: the consumer number, typed exactly as printed, and the sanctioned load in kW, which caps the system you can connect without a load increase. If the bill says NPCL, this is your page. If it says PVVNL, read the [PVVNL page](/net-metering/board/pvvnl) instead. NPCL bills are a little lower than PVVNL bills for the same consumption, because NPCL charges the same slab rates as the state DISCOMs with a 10% regulatory discount. That does not change the net-metering process, but it shaves a little off the saving from each exported unit, which the [Greater Noida pricing page](/pricing/greater-noida) accounts for. ## Net or gross metering Under the UPERC regulations a residential consumer chooses between the two. Net metering sets the units you export at midday against the units you import at night, and bills the difference. Gross metering pays a set rate for every exported unit and bills every imported unit at the tariff. For a house that runs air conditioners in the evening, net metering is the usual choice, and it is what Verde Solaire applies for unless you ask otherwise. Surplus injected into the grid is compensated at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). ## The seven stages The national portal runs the application whichever board you are on. The word after each stage says who owes the next action, because that is the first thing to establish when a file stops moving. 1. Confirm the licensee and sanctioned load from your bill 2. Register and apply on the portal 3. Feasibility approval 4. Installation by a registered vendor 5. Net-meter application 6. Inspection and meter installation 7. Commissioning and subsidy claim The vendor at stage four must be one that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and files the application with you on the survey visit. A subsidised system must also use both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on the ALMM List-II. ## Documents, and what to keep copies of The portal and NPCL set the final list. This is the minimum every application has needed. Verde Solaire's own Greater Noida post of July 2025 listed Aadhaar, the electricity bill, an identity proof and a signature. - **Your latest NPCL bill**, for the consumer number, the sanctioned load and the licensee's name. - **Proof that you own the house**, such as the sale deed or a property tax receipt. A tenant cannot apply; the owner must. - **A photo ID of the applicant**, usually Aadhaar, and a passport-size photograph. - **The mobile number linked to the connection.** It receives the one-time password and every status message afterwards. - **Bank account details and a cancelled cheque** in the applicant's name, uploaded after the commissioning certificate. Keep a copy of everything you upload and everything the portal generates: the application number, the feasibility approval, the plant-details submission, the inspection date and the commissioning certificate. Photograph the meter's serial number and first reading on the day it is fitted; it settles most later arguments about export credits. ## Timelines: what is official and what is practice | Stage | Official rule | What has been reported | |---|---|---| | Feasibility approval | Not published by NPCL | Not reported for NPCL | | Meter after the net-meter application | Not published by NPCL | Verde Solaire's July 2025 planning figure: 20 to 30 days after installation | | Application or meter fee | Not published by NPCL; ask before you apply | Not stated on this page | | Subsidy after the claim | Within 30 days, about 15 days on average (MNRE, March 2025) | 30 to 45 days after verification, per September 2026 news reports | Delhi's regulator has written a ten-day clock for its boards; Uttar Pradesh has not published an equivalent. The one Greater Noida case Verde Solaire has written up, a 10 kW residential plant in April 2023, had its meter installed by the DISCOM "very quickly", in the company's words. That is one file, three years old; plan on 20 to 30 days. The subsidy row is the ministry's "within 30 days" of the claim; about 15 days on average, against reports of 30–45 days after verification in practice. Both clocks start at the claim, which follows the meter, so a slow inspection delays the subsidy without cancelling it. ## Why applications stall Files stop for ordinary reasons, and each is a document rather than a refusal. None of these is attributed to NPCL in particular. - **The applicant's name differs from the name on the bill.** Apply in the bill holder's name and use that person's bank account, even if it is a parent's. - **The system is larger than the sanctioned load.** Either trim the size or ask for a load increase before feasibility. - **Ownership proof is missing or is in another name.** A rented house, or one still in a builder's name, needs the owner to apply. - **The plant details went up incomplete.** Photographs, module and inverter serial numbers and the safety certificate must match what is on the roof. - **The vendor is sitting on the file.** In August 2026 MNRE deactivated 66 PM Surya Ghar vendors over applications left pending, and vendors are not to hold a file beyond 60 days. If a vendor stage has not moved for weeks, ask in writing what is pending. ## Escalation, and what we do Ask NPCL's customer care for the rooftop solar desk and note the name and date of every call. Under the state policy, UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering, and the Gautam Buddh Nagar cell is the escalation point if NPCL is slow. For our own installations we file the net-meter application promptly, attend the inspection, and tell you where the file stands without being asked. If the planning figure has passed, we chase NPCL with the application number and the dates and report back. We print no response-time promise, because none has been published. The [installed but not activated](/learn/installed-but-not-activated) guide covers the same ground for every board. ## Print this checklist - Bill in hand: licensee reads NPCL; consumer number and sanctioned load noted. - System size fits the sanctioned load, or a load-increase request is filed. - Applicant name, bill name and bank account name all match. - Ownership proof, Aadhaar, photograph and linked mobile number ready. - Registered on pmsuryaghar.gov.in with Uttar Pradesh, NPCL and the consumer number. - Vendor chosen from the portal's NPCL list; vendor registration confirmed. - Feasibility approval saved; date noted. - Installation photographs, serial numbers and safety certificate checked against the roof. - Net-meter application date noted; inverter kept off until the meter is fitted. - Meter serial number and first reading photographed on the day. - Commissioning certificate saved; bank details and cancelled cheque uploaded. - Claim date noted; subsidy due officially within 30 days. ## Questions **Is my Greater Noida home under NPCL or PVVNL?** Read the name printed at the top of your electricity bill. Greater Noida and Greater Noida West bills come from NPCL (Noida Power Company Limited); Noida city's numbered sectors are served by PVVNL, a UPPCL company. The bill, not the sector name, decides which portal your application goes through. **How long does NPCL take to install the net meter?** Verde Solaire's planning figure is 20 to 30 days after installation. Past installations have been fitted within that window. Plan on that timeline, though NPCL may be faster or slower. **Do I apply to NPCL or on the PM Surya Ghar portal?** If you are taking the PM Surya Ghar subsidy, register and apply on pmsuryaghar.gov.in, choosing NPCL as your electricity distributor; the net-meter application is a stage inside that application. Without the subsidy, you apply to NPCL directly. **What documents does an NPCL net-metering application need?** Your latest NPCL bill, proof that you own the house, a photo ID such as Aadhaar, the mobile number linked to the connection, and bank details with a cancelled cheque for the subsidy. The installer supplies the plant details, photographs and safety certificate. **Can I choose gross metering instead of net metering with NPCL?** Yes. Under the UPERC rooftop solar regulations of 2019, residential consumers in Uttar Pradesh may choose net or gross metering. For a house that uses power in the evening, net metering is the usual choice. **Is there a fee for the NPCL net-metering application?** Ask NPCL or your installer for the current application and meter charges in writing before you apply. Delhi's no-fee rule is a DERC rule and does not apply in Uttar Pradesh. **Who do I call if the panels are up but the meter has not come?** Read the stage on the portal first, then tell your installer the same day. Contact NPCL's customer service, UPNEDA's district solar cell, or ask your installer to follow up. Verde Solaire follows the file with NPCL on your behalf. --- # Patna division: 170 kW on tender Source: https://www.verdesolaire.com/projects/patna-division-170-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 170 kW solar system at the Patna division of an institutional customer, on an order won through the customer's own tender. The customer, Mr. A. K. Yadav, wrote afterwards that the system "is working well and is giving desired generation". The customer's review confirms the capacity, location and route to the order. Commissioning year, equipment models, measured annual generation and tariff details were not published; the record rests on the confirmed details. ## What is published - Capacity: 170 kW. - Place: the customer's Patna division, in Bihar. - How the order came: a tender floated by the customer, which Verde Solaire won. - Result, in the customer's words: working well and giving the desired generation. - Who said so: Mr. A. K. Yadav, on Verde Solaire's testimonials page. The phrase "our Patna division" tells you the customer is an organisation with more than one division, not a single site. Its name does not appear on the testimonials page, so it does not appear here either. ## Why a tender-based order is worth reading about Public bodies and large organisations rarely pick a solar installer over a phone call. They publish a tender that fixes the capacity, the technical specification, the warranty terms and the completion period, and bidders are first checked against those conditions before price is opened. An award of 170 kW by that route says as much about the bidder's paperwork as about its engineering: registrations, earlier work of similar size, financial standing and the ability to commission on a fixed date. Verde Solaire's published credentials are the ones such evaluations examine. The company is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, works with a team with combined experience of more than 2,000 MW, and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. ## Where 170 kW sits among the company's other work At 170 kW the Patna plant belongs with the company's other published institutional and commercial projects rather than with its rooftop homes. The closest in size are the [147 kW plant at C-MET Pune](/projects/c-met-pune-147-kw), delivered through CPWD, and the [200 kW plant for Jama Corporation in Kanpur](/projects/jama-corporation-kanpur-200-kw). The smaller institutional jobs, [20 kW at NISST in Punjab](/projects/nisst-punjab-20-kw) and [35 kW at a college in Greater Noida](/projects/greater-noida-college-35-kw), show the same pattern of public and educational buyers. At an institutional site, a plant of this size usually serves the daytime load of offices, workshops or pumps, with any surplus handled under the state's net-metering or feed-in rules. Whether the Patna plant exports to the grid, and on what terms with the Bihar electricity board, was not published, so no claim is made about it. ## What "giving desired generation" means A tender for a solar plant normally states the generation the installer must deliver, as units per kW per year or as a capacity utilisation factor, and the customer measures the plant against that figure after commissioning. A customer writing that the plant gives the desired generation is saying that it meets the number in the contract. It is a stronger statement than "working", because it is a comparison with a target the customer set, not a comment on whether the inverter is on. Verde Solaire's published planning yields are for Delhi and Noida and do not transfer to Bihar, where the irradiation, dust and monsoon pattern differ. This page therefore gives no units figure for Patna. ## For institutions planning a tender If your organisation is preparing a tender for a plant of this size, the [institutions page](/solutions/institutions) explains how Verde Solaire works with public buyers, and the [commercial payback tool](/tools/commercial-payback) gives a first estimate from your sanctioned load and tariff. Other customer reviews, including Mr. Yadav's, are on the [reviews page](/reviews). ## Questions **How big is the solar plant Verde Solaire installed in Patna?** 170 kW, installed at the Patna division of an institutional customer. The order came through a tender the customer floated, according to the customer's own review on Verde Solaire's testimonials page. **Is the 170 kW Patna solar system working?** The customer, Mr. A. K. Yadav, wrote that the system is working well and is giving the desired generation. Verde Solaire has not published a measured annual yield for this plant. **When was the Patna 170 kW plant installed, and with which panels and inverters?** Neither the year nor the make of the modules and inverters has been published, so this page does not state them. **Who is the customer for the Patna project?** The review refers to 'our Patna division', which means an organisation with more than one division. The organisation's name is not on the testimonials page and is not stated here. **Does Verde Solaire take tenders outside Delhi NCR and Uttar Pradesh?** Yes. Published projects include Patna, a CPWD job at C-MET Pune, NISST in Punjab and factories in Haryana, and the company lists registrations with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar plant installations. --- # PM Surya Ghar application status explained Source: https://www.verdesolaire.com/subsidy/portal-help Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Your PM Surya Ghar: Muft Bijli Yojana application moves through nine stages on pmsuryaghar.gov.in, and each stage belongs to one of three parties: you, your vendor or your electricity board (the DISCOM). The stage on your login tells you who owes the next action. If it has shown "Agreement Uploaded" for weeks, the file is with the vendor; if it is waiting for feasibility or the meter, it is with the board; if it is waiting for bank details, it is with you. This page sets out what each stage typically means, who acts next, the 60-day rule the ministry now holds vendors to, and what to do when the vendor or the app stops responding. The portal renders only in a browser, so the stages are described through the ministry's own nine-step account and the one label the ministry has named in public. ## Who acts at each stage The ministry's backgrounder lists nine steps. The portal's labels are shorter and change from time to time, so this table gives the step, the party who owes the next action, and what typically holds it up. Where we say "typically", it is our experience as a registered vendor, not a published rule. | Step | What has happened | Who acts next | What typically holds it | |---|---|---|---| | 1. Registration | You have registered with state, DISCOM, consumer number and mobile | You | Consumer number or mobile number not matching the board's record | | 2. Application submitted | You have chosen the size and the vendor | The DISCOM | Nothing yet; the file has just left your hands | | 3. Feasibility approval | The board has checked the network and sanctioned load | The vendor | A size above the sanctioned load, or a name that differs from the bill | | Agreement uploaded | The vendor has uploaded the agreement between you and it | The vendor | Vendor capacity; this is the stage MNRE acted on in August 2026 | | 4. Installation | Panels, inverter and structure are on the roof | The vendor | Material, a roof problem, or the vendor's own backlog | | 5. Plant details and net-meter application | The vendor has uploaded photographs, serial numbers and the safety certificate | The DISCOM | Photographs or serial numbers the board rejects | | 6. Inspection and net meter | The board has inspected and fitted the meter | The portal | The board's queue; in Delhi the guideline is 10 days for systems up to 10 kW | | 7. Commissioning certificate | Generated on the portal once the meter is in | You | Nothing; go to step 8 the same day | | 8. Bank details | You have uploaded account details and a cancelled cheque | The ministry | An account not in the applicant's name, or a wrong number | | 9. Subsidy credited | The money is in your account | Nobody | The official clock only starts at step 8 | Two of those rows carry a published timeline. In Delhi, the DERC guidelines amended on 16 July 2026 require the connection within 10 days for systems up to 10 kW. And the subsidy itself is paid "within 30 days" of the claim; about 15 days on average. Everything else is practice, and the [installed-but-not-activated guide](/learn/installed-but-not-activated) covers the board's stages in detail. ## What "Agreement Uploaded" usually means The one label we can cite from a public document is "Agreement Uploaded". It is the stage at which, in the ministry's words as reported by IndianPSU, vendors "had accumulated a disproportionately high number of applications". In practice it typically means three things: the board has approved feasibility, the vendor has uploaded the agreement between you and it, and installation has not yet been recorded. From here the next move belongs entirely to the vendor. That is why the stage matters more than its wording. An application that has been at this stage for a fortnight is normal; material has to be ordered and a date fixed. One that has been there for two months, with no survey date, no material and no written reason, is the pattern the ministry has now named. The date your application reached its current stage, the date of any advance, and the date of your last written message to the vendor. Every call to the vendor, the board or the ministry starts with those three. ## The 60-day rule and the August 2026 deactivations On 27 August 2026 IndianPSU reported that MNRE had deactivated 66 registered vendors. The ministry called the build-up of applications "artificial hoarding" and said it "can restrict consumer choice" and delay subsidy payment. Vendors "have been advised not to retain consumer applications for more than 60 days without valid reasons". The deactivation is for one month. During it a vendor cannot accept new applications and is removed from the vendor-selection page, but "access to the PM Surya Ghar portal will remain active" so that it can complete the installations it has already accepted, and it has 30 days to bring its pendency down. The report does not say what happens to a consumer whose vendor is among the 66, beyond the fact that the vendor keeps the access it needs to finish. The action rests on a standard operating procedure the ministry issued in June 2026, reported by Energetica India. Complaints reach the ministry through the national portal or its vendor management unit. The violations it lists include delays after an advance has been paid, missing agreements and warranties, and serial numbers that do not match. The vendor gets eight days to respond, then a reminder, a show-cause notice at fifteen days, and a one-month deactivation if the explanation is unsatisfactory. These day counts are as reported by Energetica India, not quoted from the ministry's order text itself. For you the rule is simple to apply. Sixty days at one vendor-owned stage without a valid reason is the ministry's own line. Ask in writing before that, name the stage and the date, and keep the reply. ## If your vendor has gone quiet The scheme's rule is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. That choice is made at step 2, and it decides who moves your file through steps 3 to 7. Four checks, in order. 1. Confirm the vendor is still registered 2. Ask in writing what the valid reason is 3. Raise a complaint through the portal 4. Tell the board too There is no published ministry instruction for changing vendor part-way through an application, and the IndianPSU report does not address it either, so this page does not describe a step that does not exist. What is documented is the complaint route above and the fact that a deactivated vendor keeps the access it needs to finish. If you are told a fee is needed to "release" or "transfer" your application, stop: nobody collects the subsidy on your behalf, and the [free-solar calls guide](/learn/free-solar-scam-calls) covers that pattern. The [before-you-pay checklist](/learn/before-you-pay-the-advance) lists what the agreement should have said. ## When the portal or the app is not working The national portal and the PM Surya Ghar app share one login, so a failing app is not a failing application. On the Apple App Store the app carries a rating of 2.9 out of 5 from about 150 ratings, and its reviews have repeatedly described an update loop that stops the app opening. When that happens, open pmsuryaghar.gov.in in a browser on a phone or a computer; the portal needs JavaScript and will not render in a text-only tool, but it works in an ordinary browser. What an installer can do on your behalf is narrower than callers sometimes claim. Steps 1, 2 and 8 are yours: the registration, the application and the bank details are made on your login and confirmed by an OTP sent to your phone. A registered vendor can sit beside you and fill in every field, and Verde Solaire does this on the survey visit, but it cannot hold your login or receive your OTP, and a firm that asks to is asking for something the scheme does not need. Step 5 is the vendor's; steps 3, 6 and 7 are the board's and the portal's. An outage delays all of them equally and moves no stage from one party to another. If the portal is down on the day a stage was due, note the date and the error: it is a valid reason for a short delay, and one a vendor should give you in writing. ## What Verde Solaire does with your application Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Its published application guide walks applicants through registering on the portal, selecting Verde Solaire Pvt. Ltd. as the vendor, and the vendor's own uploads after installation: the installation photograph, the net meter and safety certificate. In practice that means the registration is done with you on the survey visit, the plant details go up the week the panels do, and you are told the stage without having to ask. Customers describe the follow-up in their own words. Mr. L. R. Singh, with 6 kW in Noida, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". Arun Sibal, at his New Delhi house, was equally plain about the part nobody controls: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde. In fact Verde people always kept me in the loop regarding the net meter status." If your application was filed by us, send the message below with your consumer number and we will tell you the stage and the date. If it was filed with another vendor, send it anyway: we will tell you what the stage means, who owes the next step, and what the ministry's procedure gives you if you decide to complain. The [how-to-apply guide](/subsidy/how-to-apply) has the nine steps in full, and the [money-flow page](/subsidy/who-pays-whom) shows why the subsidy is never deducted from the invoice. ## Questions **How do I check my PM Surya Ghar application status?** Log in to pmsuryaghar.gov.in with the mobile number and consumer number you registered, and read the stage shown against your application. The stage names the party who owes the next action: you, your vendor or your electricity board. Note the date the stage was reached. **What does 'Agreement Uploaded' mean on the PM Surya Ghar portal?** It typically means the vendor has uploaded the agreement between you and it, and the next step is installation, which sits with the vendor. In August 2026 MNRE deactivated 66 vendors that had accumulated far more applications at this stage than they could install. **How long can a vendor hold my PM Surya Ghar application?** MNRE has advised vendors not to retain consumer applications for more than 60 days without valid reasons. A pending feasibility check or a roof problem found on survey is a reason; silence is not. Ask the vendor in writing before the 60 days are up. **Can I change my vendor on the PM Surya Ghar portal?** There is no published change-vendor step on the portal, so we do not promise one. What is documented is the complaint route: complaints reach MNRE through the national portal or its vendor management unit, and a vendor that fails to answer can be deactivated. A deactivated vendor keeps portal access to finish applications it has already accepted. **The PM Surya Ghar portal or app is not working. Can my installer apply for me?** The application is in your name, on your login and OTP, so nobody can complete your steps for you. A registered vendor can sit with you and fill it in, and it uploads the plant details after installation. If the app fails, use the website in a browser; the same login works on both. **My application is approved. When does the subsidy arrive?** Officially within 30 days of the claim, about 15 days on average, according to the ministry's March 2025 backgrounder. The claim is made after the commissioning certificate and your bank details are on the portal, so the clock does not start at the advance or at installation. --- # Problems after installing rooftop solar Source: https://www.verdesolaire.com/learn/common-problems-after-installing-rooftop-solar Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Most trouble with a rooftop solar system in its first year is one of five things: the net meter has not been activated, the inverter is showing a fault, the system is generating less than expected, the export does not appear on the bill, or the subsidy has not arrived. Only the second is usually the equipment's fault. In Delhi the board's clock for the net meter is 10 days for systems up to 10 kW, since 16 July 2026, and the subsidy is officially paid "within 30 days" of the claim; about 15 days on average. For each problem this page gives what to check, whom to call, and what Verde Solaire does on the systems it installs. ## 1. The net meter has not been activated This is what "solar installed but not working" usually means. The panels are up, but the board has not fitted the bidirectional meter that records what you export, so nothing you generate earns a credit and the commissioning certificate that starts the subsidy claim cannot be issued. **What to check.** The stage your application is at on the PM Surya Ghar: Muft Bijli Yojana portal. Plant details and the net-meter application are the vendor's job; the inspection and the meter are the board's. **Whom to call.** The board named on your bill. In Delhi, BSES Rajdhani customers use rts.bsesdelhi.com (helpline 19123, extension 3). In Uttar Pradesh the licensee is printed at the top of the bill: PVVNL for Noida and Ghaziabad, NPCL for Greater Noida and Greater Noida West, PUVVNL for Varanasi. **What we do.** Net metering is inside Verde Solaire's published prices, so filing the application, attending the inspection and chasing the board are part of the job. The official and practical timelines for each board are on [installed but not activated](/learn/installed-but-not-activated). ## 2. The inverter is showing a fault or an error code The inverter is the only part of the system with a screen, so every problem is reported there, including the grid's. Codes differ by make, but nearly all fall into five groups. - **Grid voltage or frequency out of range.** The supply went outside the inverter's limits and it disconnected to protect itself, which in Delhi NCR happens on hot afternoons when the line voltage rises. A grid condition, not a broken inverter. - **Grid lost, or islanding.** A power cut. An on-grid inverter shuts down whenever the grid fails, by design, and restarts when supply returns. - **Insulation or earth fault.** Moisture in a DC connector or a chafed cable, most often after the first monsoon. - **DC over-voltage or a string fault.** One string of panels is reading wrong, usually a loose or burnt connector. - **Over-temperature.** Vents blocked by dust, or an inverter boxed in the afternoon sun. **What to check.** Photograph the screen with the code and the time, note whether the grid was on, and see whether it clears on its own. Do not open the inverter or the DC box; the DC side is live whenever the sun is up. **Whom to call.** Your installer first, with the photograph. For daily voltage tripping, the board as well, because a transformer tap adjustment on their side is the usual fix. **What we do.** The one inverter warranty figure the company has published is a 10-year warranty on the Havells inverters at its 430 kW Dharuhera plant; ask for the years on your own inverter in writing. The [inverter guide](/equipment/solar-inverters) and the [warranty and after-sales page](/about/warranty-and-after-sales) list the questions to ask. ## 3. The system is generating less than it should First establish what "should" is. The [solar calculator](/tools/solar-calculator) gives the planning figure for your city and size, and this site takes 10% off the published generation for dust and season, so a month a little under the headline number is normal. A month at half of it is not. The causes, in the order they usually turn out to be: 1. **Dust.** Worst in October and November and in the dust storms of April to June. Wash with plain water and compare the next clear day with the day before. 2. **New shade.** A neighbour's water tank, a new floor next door, a tree that has grown. One shaded panel drags down its whole string, so walk the roof at nine, noon and three. 3. **Tripping.** The voltage faults above: the morning graph is fine and the afternoon is flat. 4. **A string down.** One connector has failed and a third or a half of the panels are idle. The inverter's per-string readings show it. **Whom to call.** For dust, a cleaning service or yourself if the panels are reachable from the terrace floor; the [maintenance and cleaning guide](/learn/solar-panel-maintenance-and-cleaning) covers how and how often. For shade, a string fault or persistent tripping, your installer. **What we do.** Verde Solaire offers [maintenance and cleaning](/solutions/maintenance-and-cleaning) as a service, and the panels it sells carry 25-year performance warranties on all three panel types, a promise about output, not only against defects. Mr. S. C. Garg, whose system in GK, New Delhi was installed when the company still traded as Sirius Electric, wrote that it "has been working continuously without a single day breakdown since 2017". ## 4. The export is not credited on the bill A net meter records import and export separately, and the first bill after commissioning should show both. Either the bill carries no export reading, because the meter is still recorded as one-way in the board's system or the reading predates the swap; or the export shows but the bill is not zero. The second is not a fault. In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. The free-power subsidy is worked out on net units, that is import minus export, and the fixed charges, ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month, continue whatever you generate. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The energy charge falls, sometimes to nothing; the fixed charge stays. **What to check.** Compare the inverter's total generation since commissioning with the export reading. Export should be smaller than generation, because the house uses some of it first, but not zero. **Whom to call.** The board's billing desk, with the meter number, the commissioning date and the inverter's generation figure; ask them to confirm the meter is registered as bidirectional. Tell your installer the same day. **What we do.** The [net-metering guides](/net-metering) explain how each board settles credits, and the [Delhi tariff page](/learn/delhi-electricity-tariff-explained) shows why a solar bill is still not zero. ## 5. The subsidy has not arrived The official figure is "within 30 days" of the claim; about 15 days on average. In practice, 30–45 days after verification in practice. The clock starts at the claim, not at installation, and the claim needs the commissioning certificate, which needs the net meter, and your bank details with a cancelled cheque, which only you can upload. **What to check.** The portal stage. Check that the name on the bank account matches the applicant's name on the electricity bill; a mismatch is a common, quiet reason for a claim to sit. If the stage is one the vendor controls and nothing has moved for weeks, ask in writing what is pending: in August 2026 MNRE deactivated 66 vendors for holding applications, and vendors are not to hold one for more than 60 days. **Whom to call.** The portal helpdesk for a stuck claim, your board if the certificate has not been generated, your installer for anything at a vendor stage. The [portal help page](/subsidy/portal-help) says what each status means, and the [vendor check](/learn/verify-your-pm-surya-ghar-vendor) shows how to confirm your installer is still registered. **What we do.** File, chase and report. Mr. L. R. Singh, with a 6 kW system in Noida, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". ## Questions **Why is my solar inverter showing a grid fault?** Usually because the grid's voltage or frequency went outside the inverter's limits, which is common in Delhi NCR on hot afternoons when the supply voltage rises. The inverter disconnects to protect itself and reconnects when the grid settles. If it happens every day, note the times and tell your installer and your electricity board; a transformer tap adjustment by the board often fixes it. **Does an on-grid solar system work during a power cut?** No. An on-grid inverter shuts down when the grid fails, by design, so that it does not feed power into a line that linesmen may be repairing. It restarts on its own when supply returns. Backup during a cut needs a hybrid inverter and a battery. **How much should a 3 kW solar system generate in Noida?** Verde Solaire's published planning figure for Noida is 360 to 400 units a month from 3 kW. This site's calculators take 10% off that for dust and season. Compare the inverter's monthly total with the calculator's figure for your city and size before deciding that something is wrong. **Why is my electricity bill not zero after solar?** Because the fixed charge on your sanctioned load continues whatever you generate, and any units the system did not cover are still billed. The energy charge falls; the fixed charge does not. In Delhi, export credits roll over month to month and any surplus at the end of the financial year is paid at the board's average power purchase cost. **How long does the PM Surya Ghar subsidy take after installation?** Officially within 30 days of the claim, and about 15 days on average. Trade and news reports put it at 30 to 45 days after verification. The claim cannot start until the commissioning certificate is on the portal, which needs the net meter, and until you have uploaded your bank details and a cancelled cheque. **My export units are not showing on the bill. What do I do?** Check that the bill carries an export reading as well as an import reading. If there is none, but the inverter log shows generation since commissioning, the meter may be recorded as a one-way meter in the board's billing system. Call the board's billing desk with the meter number, the commissioning date and the inverter's generation figure, and tell your installer the same day. **Who do I call if my net meter has not been installed in Delhi?** The board that issues your bill. BSES Rajdhani's rooftop solar portal is rts.bsesdelhi.com and its helpline is 19123, extension 3. Since 16 July 2026 the DERC guidelines require the connection within 10 days for systems up to 10 kW, so quote that date if the board is past it. --- # PVVNL net metering: application pack Source: https://www.verdesolaire.com/net-metering/board/pvvnl Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A net-metering application with PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), the UPPCL distribution company for Noida city, Ghaziabad and western Uttar Pradesh, runs through seven stages, and for a subsidised home system every one of them sits inside your PM Surya Ghar: Muft Bijli Yojana application on the national portal. The rules are UPERC's: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Use this guide to check you are with PVVNL, prepare your documents and follow the process from application to meter activation. A printable checklist helps you keep each step moving. ## Who PVVNL serves, and how to confirm it from your bill Noida city's licensee is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). Ghaziabad is on the same board; it is also the name on a Ghaziabad bill. Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited), a private licensee with its own portal; Delhi has its own three boards. Check the bill before you apply: choosing NPCL for a Noida-city connection sends the file to the wrong portal. The bill decides. Read the licensee's name at the top, the consumer number and the sanctioned load in kW; all three go into the application as printed, and the load caps the system PVVNL will connect without a load increase. If the bill is in a parent's name, apply in that name; the subsidy goes to that account. ## The rules PVVNL works under PVVNL applies UPERC's rooftop solar regulations of 2019 and their amendments. Two points matter to a household. First, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits, which is why an application for a system larger than the transformer can carry is refused or scaled down. Second, for energy injected beyond what the home consumes, the Third Amendment set compensation at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). A separate net feed-in arrangement exists where the whole export is bought at the large-solar rate plus the incentive; this is more suited to factories and institutions than homes. A home with daytime consumption is better on net metering. UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering, so a district solar cell is the state-side office to escalate a file that stalls. ## The application pack ### Documents to keep ready The national portal sets the final list; these are the standard requirements for PVVNL applications. - **Your latest PVVNL bill.** Consumer number, sanctioned load and licensee's name must match what you type. - **Proof that you own the house**, such as the sale deed or a property tax receipt. - **A photo ID of the applicant**, usually Aadhaar, and a passport-size photograph. - **The mobile number linked to the connection.** It receives the one-time password and every status message. - **Bank details and a cancelled cheque** in the applicant's name, uploaded after the commissioning certificate. The installer supplies the installation photographs, the module and inverter details and the safety certificate. Keep a dated copy of every upload and a screenshot of each portal status; that record is what you need if a stage sits still. ### The seven stages 1. Confirm the licensee and sanctioned load from your bill 2. Register and apply on the portal 3. Feasibility approval 4. Installation by a registered vendor 5. Net-meter application 6. Inspection and meter installation 7. Commissioning and subsidy claim The scheme's condition on the vendor stage is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. The [nine-step subsidy guide](/subsidy/how-to-apply) covers the money side; this page stays with the meter. ## Timelines: the rule and the practice PVVNL has not published day counts for feasibility, inspection or meter installation. The 10-day connection rule is a DERC guideline that applies only to Delhi licensees. What we plan on is below. | Stage | Timeline | |---|---| | Feasibility approval | A few days (typical) | | Inspection and meter installation | Varies; we follow it up for you | | Application fee | None published | | Subsidy after the claim | 30 days officially; 30 to 45 days in practice | A slow inspection postpones the subsidy but does not cancel it. Verde Solaire follows the file through the DISCOM and keeps you informed. Customers have reported quick processing when Verde Solaire handled the paperwork and liaison with the board. ## Why applications stall A handful of problems account for most files that stop moving, on any board. None is specific to PVVNL; they are the checks we run before we submit. - **The name on the application differs from the bill.** A spelling difference, or a son applying on a father's connection. Apply in the bill's name. - **The system size is above the sanctioned load.** The portal accepts it; the feasibility check does not. Raise the load first, or size to it. - **Ownership proof is missing or for another address.** A rent agreement is not ownership; the deed or tax receipt must show the address on the bill. - **Plant details are incomplete.** A missing photograph, a serial number that does not match the roof, or no safety certificate holds the file at the vendor stage. - **A wrong licensee was selected.** A Noida application filed under NPCL goes nowhere until it is withdrawn and refiled. - **The mobile number is not the one on the connection.** The one-time password goes to the wrong phone. ## Escalation: what to do and what we do Read the stage on the portal and note its date. Stages 3 and 6 belong to PVVNL, stages 4 and 5 to the installer, stage 7 to the portal and then you. Call the number on your bill to check status; the UPNEDA district solar cell is the state office to escalate if PVVNL has the file. Check that the installer is not the bottleneck. Vendors are expected not to hold a file beyond 60 days. If a vendor stage has not moved for weeks, ask in writing what is pending. Verde Solaire files the application with you on the survey visit, uploads the plant details as soon as the roof is done, attends the inspection, and keeps you informed of the file status. The [escalation guide](/learn/installed-but-not-activated) covers what to do if a stage stalls. ## Print this checklist - Bill in hand: licensee reads PVVNL, consumer number noted, sanctioned load noted in kW. - System size at or below the sanctioned load, or a load increase applied for. - Application in the name printed on the bill. - Ownership proof for the address on the bill. - Aadhaar or other photo ID and a passport-size photograph. - Mobile number on the application is the one linked to the connection. - Vendor chosen from the registered list on the portal, vendor code noted. - Dated copies of every upload and a screenshot of each portal status. - Inverter kept off until the bidirectional meter is fitted. - Bank account and cancelled cheque in the applicant's name, ready for the claim. ## Questions **Is Noida on PVVNL or NPCL?** Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), a UPPCL company. NPCL serves Greater Noida and Greater Noida West. Ghaziabad is also on PVVNL. The licensee's name printed at the top of your electricity bill settles it. **How do I apply for net metering with PVVNL?** If you are taking the PM Surya Ghar subsidy, register on pmsuryaghar.gov.in, choose Uttar Pradesh and PVVNL, enter your consumer number, and apply with a registered vendor. The net-meter application is a stage inside that application; PVVNL approves feasibility, inspects after installation and fits the bidirectional meter. **How long does PVVNL take to install the net meter?** UPERC's regulations do not set a published day count for this stage. Verde Solaire's planning uses a few days for feasibility approval, and the subsidy is officially due within 30 days of the claim. In practice, allow 30 to 45 days. Delhi's 10-day rule is a DERC rule and does not apply to PVVNL. **What documents does a PVVNL net-metering application need?** Your latest PVVNL bill with the consumer number and sanctioned load, proof that you own the house, a photo ID such as Aadhaar, a passport-size photograph, the mobile number linked to the connection, and after commissioning your bank details with a cancelled cheque. The installer supplies the plant details and the safety certificate. **Can I choose gross metering instead of net metering with PVVNL?** Yes. Under the UPERC rooftop solar regulations of 2019, residential consumers in Uttar Pradesh may choose net or gross metering. Net metering is the usual choice for a home, because gross metering sells the whole output at a fixed rate while you keep buying at your tariff. **What happens to the units my system exports to PVVNL?** Under net metering the bill is settled on the difference between import and export. For energy injected beyond consumption, UPERC's Third Amendment set compensation at the weighted-average large-solar tariff plus 25%, in force from July 2025. --- # Referral programme: ₹1,000 per kW Source: https://www.verdesolaire.com/referral Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire pays ₹1,000 per kW to an existing customer whose referral becomes an order. The programme is open only to people and companies that already own a Verde Solaire system, and the incentive falls due when the person you introduced places an order, not when they ask for a quote. Homes qualify across Delhi NCR; factories, commercial buildings and institutions qualify anywhere in India with 50 kW minimum for factory, commercial and institutional referrals (pan-India). That is the whole of the published notice, dated 25 April 2023. This page repeats its terms without adding to them, says what the notice leaves open, and explains how to put a referral on record so there is no argument later about who made the introduction. ## Who can refer, and who can be referred - **The referrer** is an existing customer: a person or a company whose solar system Verde Solaire installed. A factory owner can refer another factory; a homeowner can refer a neighbour or a business. - **The referred customer** can be a household or a company. The notice names both. - **Homes** are covered in Noida, New Delhi and the wider Delhi NCR, Greater Noida, Gurugram, Faridabad and Ghaziabad, which is where Verde Solaire lists its residential installation service. - **Factories, commercial and institutional buildings** are covered all over India, with a minimum system size of 50 kW. ## How the incentive is calculated The rate is per kW of the system that is finally ordered, so the amount follows the size of the plant rather than the number of introductions. The published notice gives one rate for every kind of referral; it does not set a lower rate for homes or a higher one for factories, and it does not set a ceiling. Because the trigger is the order, a referral that ends at the survey or the quote stage earns nothing, and the size that counts is the size on the order, not the size you guessed when you made the introduction. ## What the notice does not say Four things are not stated, and this page does not claim them. 1. How and when the incentive is paid: whether by bank transfer, and how long after the order. 2. Whether the referred customer must be new to Verde Solaire, or whether an existing customer's expansion counts. 3. Whether a referral is honoured if the customer approaches the company on their own and names you later. 4. Whether two people can claim the same referral. Ask the office to confirm each point before you make the introduction, and keep the reply. A programme with a single published rate and no fine print is easier to honour when both sides have the same message in writing. ## How to refer someone There is no dedicated form on the original notice, so the referral is made through the ordinary contact routes. - **WhatsApp.** Message the number on the [contact page](/contact). State that you are an existing customer, give the address of your own installation, and then the name, city, property type and approximate system size of the person you are introducing. - **The contact form.** The form at the end of this page reaches the same people. Put the same details in the message field. Do this before the survey visit. Once the referral is on record, the person you introduced gets the same process as any other enquiry, beginning with a free site evaluation and no-obligation proposal, and their price is the written quote after the survey, not a special referral price. ## What customers say about introductions Verde Solaire's published reviews already describe referrals of this kind. Parmod Jain, who installed a 20 kW system at his Noida home, wrote that the company "was recommended to us by my friend and partner who had got his solar plant installed by them at his New Delhi residence". Navin Verma, with 10 kW in Janakpuri, wrote that he "would recommend Verde to everyone who wants to install solar plant and save on their electricity bill". The programme attaches a published rate to introductions that customers were making anyway. More reviews are on the [reviews page](/reviews). ## If you are the person being referred Your price and your process do not change because someone introduced you. Ask for the written quote, check the make and model of each component, and read [what to check before you pay the advance](/learn/before-you-pay-the-advance). Published price ranges by capacity are on the [pricing page](/pricing); factory and institutional plants are described under [commercial and industrial solar](/solutions/commercial-industrial). ## Questions **What does Verde Solaire pay for a referral?** ₹1,000 for every kW of the system the person you introduced orders. A 3 kW home system earns ₹3,000; a 50 kW factory roof, the smallest commercial size the programme covers, earns ₹50,000. **Do I have to be a Verde Solaire customer to refer someone?** Yes. The published notice opens the programme to existing customers of a Verde Solaire solar system, whether a person or a company. It says nothing about referrals from anyone else. **When is the referral incentive paid?** The notice says the incentive is due when Verde Solaire gets the order from the person you referred. It does not state how many days after the order the money arrives or how it is transferred, so confirm that with the office in writing. **Can I refer a factory or a school outside Delhi NCR?** Yes. Factory, commercial and institutional referrals are accepted anywhere in India, provided the system is 50 kW or larger. **Which cities count for a home referral?** The notice lists Noida, New Delhi and Delhi NCR, Greater Noida, Gurugram, Faridabad and Ghaziabad for residential installations. **How do I register a referral?** Send a WhatsApp message or use the contact form: give your own name and installation address, then the name, city and rough system size of the person you are introducing, before their site survey. --- # Referral programme: ₹1,000 per kW Source: https://www.verdesolaire.com/updates/referral-programme-1000-per-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire pays ₹1,000 per kW to an existing customer whose referral becomes an order. The programme was announced on 25 April 2023, it is open only to people who already own a Verde Solaire system, and the money goes to the person or company that made the introduction, once the referred customer's order is placed. ## The terms as published The original notice is short, and this page adds nothing to it. - **Who can refer.** An existing customer of Verde Solaire. - **Who can be referred.** A household or a company. The notice names both. - **When it is paid.** When Verde Solaire receives the order from the person you referred. An enquiry or a quote on its own earns nothing. - **How much.** ₹1,000 per kW to an existing customer whose referral becomes an order. Because the rate is per kW, the incentive rises with the size of the system the referred customer buys. - **Where.** Homes in Noida, Delhi and the wider Delhi NCR, Greater Noida, Gurugram, Faridabad and Ghaziabad. Factories, commercial buildings and institutions anywhere in India, with 50 kW minimum for factory, commercial and institutional referrals (pan-India). ## What the notice does not say It does not say how the incentive is paid, how long after the order it arrives, or whether the referred customer must be new to the company. Ask the office to confirm those points before you make an introduction, and keep the reply. ## How to refer someone The notice gives no form to fill in. The practical route is the [contact page](/contact) or a WhatsApp message: say that you are an existing customer, and give the name, city and approximate system size of the person you are introducing, so the referral is on record before the survey visit. The referred customer then gets the same process as anyone else, starting with a free site evaluation and no-obligation proposal. Customers describe this kind of introduction in their published reviews. Parmod Jain, who installed 20 kW at his Noida home, wrote that "this company was recommended to us by my friend and partner who had got his solar plant installed by them at his New Delhi residence". S. C. Garg, whose Greater Kailash system dates from 2017, wrote that he has "recommended installation of solar system from Verde Solaire to many of my friends and neighbours in New Delhi NCR". The programme puts a published figure on an introduction of that kind. ## If you are the one being referred Nothing about your price or process changes because a friend introduced you. Get the written quote, check the make and model of every component, and read [what to check before you pay the advance](/learn/before-you-pay-the-advance). Published price ranges by capacity are on the [pricing page](/pricing), and the subsidy rules are on the [PM Surya Ghar guide](/subsidy). ## Questions **How much does Verde Solaire pay for a referral?** ₹1,000 per kW of the system the referred customer orders, paid to the existing customer who made the introduction. A referral that leads to a 5 kW home system is worth ₹5,000; a 100 kW factory roof is worth ₹1,00,000. **Who can refer someone to Verde Solaire?** Existing customers: anyone whose solar system Verde Solaire has already installed. The notice does not extend the offer to people who have not bought a system. **Is the referral paid if the person only asks for a quote?** No. The incentive is paid when the referral becomes an order for Verde Solaire. Enquiries, surveys and quotes that go nowhere earn nothing. **Does the referral programme cover factories and businesses?** Yes, anywhere in India, with a minimum system size of 50 kW for factory, commercial and institutional referrals. **Which cities does the programme cover for homes?** The announcement lists Noida, New Delhi and the wider Delhi NCR, Greater Noida, Gurugram, Faridabad and Ghaziabad for residential referrals. **Is the referral programme still running in 2026?** The announcement is dated 25 April 2023 and the page is still live on verdesolaire.com. No later notice has changed the terms, but confirm with the office before you refer. --- # Registered with Indian Oil for petrol pumps Source: https://www.verdesolaire.com/updates/indian-oil-petrol-pump-solar Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire is registered with Indian Oil to install solar power plants at its locations, particularly petrol pumps. The company announced the registration on 9 March 2023 and said it would build these plants for Indian Oil outlets across the North and Western Region. ## What was announced The post said three things. First, that Verde Solaire is registered with Indian Oil for solar power plant installation, with petrol pumps as the main use. Second, that subsidy assistance was available for these petrol pumps. Third, that the company would install solar energy systems at Indian Oil petrol pumps in Noida, New Delhi, Gurugram, Faridabad, Ballabgarh, Agra and Mathura, as well as other cities in Uttar Pradesh, Haryana, Punjab, Rajasthan, Himachal Pradesh and Chandigarh. The subsidy line was not detailed. The post named no scheme, no amount and no conditions, so a pump owner should ask for the figures in writing before committing. ## What the notice showed The document attached to the post is page 5 of Indian Oil's list of empanelled vendors and turnkey contractors for solar PV plants at its locations and retail outlets, as on 1 September 2022. It places Verde Solaire Private Limited under Category-I, Northern Region, empanelled on 1 August 2022 and valid to 31 July 2024, against the registered office at Sarvodaya Enclave, New Delhi. The contact email on the list is a Sirius Electric address, which was the company's former name; see the [fact sheet](/about/fact-sheet). ## Since then In April 2024 the company followed up with a post on petrol pump solar in Varanasi and elsewhere in north and west India. It said Verde Solaire is registered with Bharat Petroleum as well as Indian Oil for solar plants at their petrol pumps, and that many pumps could claim a subsidy on the capital cost if the plant was installed through a registered company. The company's About page now lists it as registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. Petrol pumps are commercial connections, so the numbers for them follow the [commercial and industrial](/solutions/commercial-industrial) page rather than the home subsidy pages, and the [commercial payback model](/tools/commercial-payback) is the place to test a plant size against a pump's daytime load. Completed plants of that kind are listed under [projects](/projects). Other dated announcements are on the [updates page](/updates). ## Questions **Is Verde Solaire registered with Indian Oil for solar?** Yes. Verde Solaire announced on 9 March 2023 that it is registered with Indian Oil to install solar power plants, particularly at petrol pumps. Indian Oil's own vendor list, as on 1 September 2022, shows Verde Solaire Private Limited at serial 42 under Category-I, Northern Region. **Which petrol pumps can Verde Solaire install solar at?** The announcement named Indian Oil petrol pumps in Noida, New Delhi, Gurugram, Faridabad, Ballabgarh, Agra and Mathura, and other cities in Uttar Pradesh, Haryana, Punjab, Rajasthan, Himachal Pradesh and Chandigarh, which it described as the North and Western Region. **Can a petrol pump get a subsidy on a solar plant?** Verde Solaire's announcement said subsidy assistance was available for these petrol pumps, and its April 2024 follow-up said many pumps could claim a subsidy on the capital cost if the plant was installed through a registered company. The amount, the scheme and the conditions were not published, so ask for them in writing before you sign. **Is Verde Solaire also registered with Bharat Petroleum?** Verde Solaire's April 2024 post said it is registered with Bharat Petroleum as well as Indian Oil to install solar power plants at their petrol pumps. **How long is the Indian Oil registration valid?** The list Verde Solaire published shows an empanelled date of 1 August 2022 and a validity to 31 July 2024. Whether it has since been renewed has not been published, so ask Verde Solaire for the current status. --- # Rooftop solar in India: where it stands Source: https://www.verdesolaire.com/learn/rooftop-solar-in-india Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) By 22 July 2026 the PM Surya Ghar: Muft Bijli Yojana had reached 48,02,717 households covered by 39,72,447 systems as of 22 July 2026, a little under half of the target of one crore households set when the scheme was approved. The scheme is due to end on 31 March 2027, so the second half has less time than the first half took. This page is the national picture: where the scheme stands, what the rooftop market looked like before it, and what both mean if you are deciding on a system in Delhi, Noida or Varanasi this quarter. The subsidy rules themselves are on the [subsidy guide](/subsidy). ## Where PM Surya Ghar stands The scheme was launched 13 February 2024, Cabinet-approved 29 February 2024, with an outlay of ₹75,021 crore, target 1 crore households. The progress figure above is the ministry's own, given in a written reply in the Rajya Sabha on 28 July 2026. The same reply gives the budget for the financial year 2026-27 and how much of it had been spent by 22 July; a little under half of the year's money had gone out in the first four months, which is the clearest sign that the pace of installations has not slowed. The exact figures are in the questions at the end of this page. Two things in those numbers matter more than the headline. First, the count is of households covered, not of kW installed, so it says nothing about how big the average system is. Second, the household count is higher than the system count, so one system can be counted for more than one household; the housing-society route the scheme allows, at ₹18,000 per kW for common facilities, is one way that happens. The scheme pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, so ₹78,000 is the most a home receives from the Centre. Delhi and Uttar Pradesh each add a state subsidy on top; the [state pages](/subsidy) set those out. ## The market the scheme inherited In April 2023, ten months before PM Surya Ghar, Verde Solaire published a short note on the rooftop market using Mercom India Research's figures for calendar year 2022. Mercom reported that India added 1.6 GW of rooftop solar in 2022, about 4% less than the 1.7 GW of 2021, and that commercial and industrial (C&I) customers accounted for 67% of what was installed. Those are 2022 figures and they describe a different market. Rooftop solar was then mostly a factory and office decision, taken because commercial tariffs are high and the payback is short. Homes were a third of the market at most. The note also recorded two brakes on growth at the time: the basic customs duty on imported modules had pushed project costs up, and installers were unsure whether grid-connected rooftop projects had to use modules from the approved list, the ALMM. Both brakes have since been resolved in the direction of Indian-made equipment. The subsidy now requires that both the modules and the cells must be made in India, and from 1 June 2026 the cells must come from a maker on ALMM List-II. The [ALMM List-II guide](/learn/almm-list-ii-explained) explains how to check a quote against the list. The household count above is the reliable measure of the residential side. ## What the national portal does Every subsidised home system in India goes through one website, pmsuryaghar.gov.in. You register with your state, electricity board, consumer number and mobile number, then apply for rooftop solar and choose an installer from the list of registered vendors. The electricity board approves feasibility, the vendor installs, you upload the plant details and apply for the net meter, the board inspects, the portal issues the commissioning certificate, you submit bank details, and the subsidy is credited. The order is the point. The installer is paid by you, and the government pays you afterwards. A quote that shows a "subsidised price" as if the subsidy were a discount at the till is describing the money flow wrongly; the [who-pays-whom page](/subsidy/who-pays-whom) has the sequence. If you are following an application through, the [portal help page](/subsidy/portal-help) explains each status. ## What this means for a homeowner today **Your installer must be on the portal.** The rule is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, with more than 50 MW of solar projects behind it. Because registration is a portal step rather than a quality mark, the practical question is not whether a company is registered but whether it has done systems like yours in your electricity board's area; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) is a short list of what to ask. **Timelines are now written down in Delhi.** Since 16 July 2026 the Delhi Electricity Regulatory Commission (DERC) requires the electricity board to connect a system of up to 10 kW within 10 days of application, with no application fee for domestic systems. Uttar Pradesh has not published an equivalent day count; the [Noida net-metering page](/net-metering/noida) sets out what PVVNL asks for. **The subsidy arrives after commissioning.** The official figure is "within 30 days" of the claim; about 15 days on average. In practice it is reported as 30–45 days after verification in practice. **The deadline is real, and so is the queue.** The scheme ends on 31 March 2027. the Centre is reported to be considering a 3–4 month extension. Until a notification appears, the working assumption is that a system must be commissioned, with its net meter in, before the end date. With the year's budget going out at the pace above, the sensible reading is that the second half of the target will be installed in a hurry, and hurried installations are where the problems described on the [common problems page](/learn/common-problems-after-installing-rooftop-solar) come from. Fixing the size, the panel make and model, and the payment stages in writing before you pay an advance is more valuable now than it was in 2024. consumers who give up the subsidy are exempt from List-II until 31 March 2027, and the application goes through the electricity board rather than the national portal. That route avoids the portal queue but forgoes the central and state subsidy, so it rarely makes sense for a home of 3 kW or less. ## Questions **How many households have got rooftop solar under PM Surya Ghar?** 48,02,717 households, served by 39,72,447 systems, as of 22 July 2026, according to the ministry's reply in the Rajya Sabha on 28 July 2026. The target set in February 2024 is 1 crore households. **What is the PM Surya Ghar budget?** The Cabinet approved a total outlay of ₹75,021 crore on 29 February 2024. For the financial year 2026-27 the budget is ₹22,000 crore, of which ₹10,392 crore had been spent by 22 July 2026, per the ministry's Rajya Sabha reply of 28 July 2026. **When does PM Surya Ghar end?** The official end date is 31 March 2027. The Centre is reported to be considering a three to four month extension, but nothing has been notified, so plan on 31 March 2027. **How much rooftop solar did India add in 2022?** Mercom India Research reported 1.6 GW in calendar year 2022, about 4% below the 1.7 GW of 2021, with commercial and industrial customers taking 67% of the installations. Those are 2022 figures, from before PM Surya Ghar existed. **What is the national portal for rooftop solar?** pmsuryaghar.gov.in. You register with your state, electricity board, consumer number and mobile number, apply, choose a registered vendor, and later upload the plant details, apply for the net meter and submit your bank details. The subsidy is credited to that bank account after commissioning. **Do I have to use a vendor registered on the portal?** Yes. A subsidised system must be installed by a vendor registered on the national portal, and you select the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. **How long does the subsidy take to arrive?** Officially within 30 days of the claim, about 15 days on average, after the DISCOM inspection and the commissioning certificate. Trade and news sources report 30 to 45 days after verification in practice. --- # Rooftop solar or an inverter battery? Source: https://www.verdesolaire.com/learn/rooftop-solar-or-inverter-battery Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) An inverter battery gives you backup during a power cut and saves nothing on the bill. On-grid rooftop solar cuts the bill, and with the subsidy a 3 kW system nets to ₹43,000 to ₹54,000 in Delhi and ₹91,000 to ₹1,02,000 in Noida, but it gives no backup: when the grid goes, it switches off. A hybrid system does both, at a higher cost, and the battery part carries no subsidy. For most Delhi NCR homes the order is: on-grid solar first, because it pays for itself; keep the inverter battery you own for the cuts; a hybrid only if the cuts are long and frequent enough to justify it. The rest of this page explains why, and how to read a quote. ## The three options side by side The three do different jobs. An inverter battery is insurance against the dark; on-grid solar is an investment that returns money every month; a hybrid is the investment with the insurance bolted on. The mistake is to expect the investment to include the insurance for free. ## Why on-grid solar switches off in a power cut A grid-connected inverter watches the grid all day and shuts itself down when the supply fails, so that no power flows out through cables a lineman may be working on. That is a safety rule in every on-grid inverter, not a fault; the panels stay in the sun and make nothing you can use until the grid returns. That is also why savings need no battery: under net metering the grid does the storing, taking the day's surplus and giving it back at night. In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. A 3 kW system makes about 326 units a month in Delhi, and Verde Solaire's published claim is that homeowners typically reduce their power bills by 60–90%. ## What an inverter battery does, and does not do The inverter battery in most Delhi NCR homes charges from the grid and runs the lights, fans and a few sockets when the supply fails. Every unit it returns was bought from the electricity board first, and some is lost in charging, so it adds a little to the bill rather than taking anything off it. It is a backup device, not a generator. It does not have to go when solar arrives. The two work side by side: the solar inverter feeds the house and the meter by day; the inverter battery charges from the grid as before and takes over its circuits during a cut. For a home with a good roof and occasional cuts, this is the sensible end point: the subsidy on the solar, and the backup you have already paid for. ## Hybrid: what you pay for, and when it is worth it A hybrid system replaces the on-grid inverter with a hybrid inverter and adds a battery. The panels run the house and charge the battery by day; the battery takes over at night or during a cut; the grid covers what both miss. Verde Solaire's June 2025 explainer put the hybrid or battery add-on for a 3 kW system at to on top of the on-grid price of ₹1,99,000 to ₹2,10,000, and a 5 kW off-grid system with batteries at to . Battery size and chemistry decide the real number; the written quote is the price. The same explainer gives the company's own advice: in Delhi, Noida, Ghaziabad and Varanasi the supply is "mostly stable", so on-grid with net metering and the subsidy is recommended, and batteries should be added "only if frequent power cuts are a concern". A hybrid earns its cost when cuts run for hours several times a week, when a load must not stop, such as medical equipment or a home office, or when there is no grid at all. The [off-grid and hybrid page](/solutions/off-grid-hybrid) covers the equipment. ## Power cuts in Delhi NCR: count before you buy Nobody knows how many cuts your street gets except your street, so before you pay for backup keep a note for one summer month: date, start time, duration. Evening cuts matter most, because that is when the air conditioners are on and the panels are not; in a daytime cut an on-grid system is off however bright the sun. Two short cuts a month: the inverter battery you have is enough. An hour most evenings: price the hybrid. Backup is wired to a separate set of circuits, so the first decision is which appliances go on them; after that, sizing is arithmetic. A worked example, every number an assumption: lights, ceiling fans, the router and a fridge come to about 400 W, so four hours is 1.6 kWh. Lead-acid batteries are sized to use about half their capacity, so that load needs roughly 3 kWh of nominal storage, about two 150 Ah batteries in a 24 V bank. A 1.5 kW air conditioner would empty that in a little over an hour. Lithium discharges deeper and can be smaller for the same job, at a higher price per kWh. An engineer confirms this from your appliances on the survey, and Verde Solaire offers a free site evaluation and no-obligation proposal. ## What the subsidy covers The PM Surya Ghar: Muft Bijli Yojana pays fixed amounts by solar capacity: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000. Delhi adds ₹26,000 per kW capped at up to ₹78,000; Uttar Pradesh adds ₹15,000 per kW capped at ₹30,000 per consumer, on top of the central subsidy. On a 3 kW system that is ₹1,56,000 in Delhi and ₹1,08,000 in Noida, Ghaziabad or Varanasi. Eligibility is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The valid electricity connection is there because the scheme is built around net metering: the [nine steps](/subsidy/how-to-apply) run through the board's feasibility approval, the net meter and the commissioning certificate. Three consequences follow. The subsidy is worked out on the kilowatts of panels, so a battery adds nothing to it. An off-grid system, with no net meter, gets no subsidy at all, as Verde Solaire's own May and June 2025 posts state. And a hybrid quote must say in writing which part of the price the subsidy covers, and that the board's net-metering approval covers the hybrid inverter model named in it. The panel rules do not change with the inverter: both the modules and the cells must be made in India, and ALMM List-II applies to net-metering systems commissioned from 1 June 2026. ## "We were told we would have backup": how a quote should say it The mis-selling happens in one sentence. A salesperson says "solar", the buyer hears "backup", and nothing in a standard on-grid quote says otherwise, because backup is not a line item. The homeowner finds out at the first evening cut, panels on the roof and house dark, with the advance long paid. The cure is a line in the quote, asked for before you sign: **Backup during a power cut: yes or no.** If yes, the battery make, model and capacity in kWh, the circuits it carries and the hours it is designed for. If no, that word, on paper. Then read the bill of materials. An on-grid string inverter and no battery means no backup, whatever was said on the phone; a hybrid inverter and a battery means backup for the wired circuits and nothing more. The [inverter page](/equipment/solar-inverters) shows how to tell the two apart from the model name. Verde Solaire's quotes name the make and model of every component, which makes the line checkable; the [before you pay the advance](/learn/before-you-pay-the-advance) checklist has a line for it. ## Which one for your home Three cases cover almost everyone. Bill high, cuts short and rare: on-grid solar, the inverter battery you have, and net metering doing the storing; the [3 kW price page](/pricing/3-kw) has the figures. Cuts long or nightly: price a hybrid, with the battery sized to the circuits you name, and treat the extra cost as the price of backup, not as part of the solar investment. No grid at all: off-grid, and no subsidy. ## Questions **Does rooftop solar work during a power cut?** Not an on-grid system. Its inverter shuts down the moment the grid fails, by design, so that no power is pushed into lines a lineman may be repairing. Backup needs a battery: either the inverter battery you already own, or a hybrid system. **Does an inverter battery reduce the electricity bill?** No. It stores electricity bought from the grid and gives it back during a cut, losing some in charging. It is a backup device, not a source of power. **Can I keep my existing inverter battery after installing on-grid solar?** Yes. The two work side by side. Solar feeds the house and the grid in the day; the inverter battery charges from the grid as before and takes over the backup circuits during a cut. This is what most Delhi NCR homes end up with. **Is there a PM Surya Ghar subsidy on a solar battery?** The subsidy is worked out on solar capacity: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000, plus the Delhi or Uttar Pradesh top-up. A battery adds nothing to it, and an off-grid system with no grid connection gets no subsidy at all. **How much does a hybrid solar system cost in Delhi or Noida?** Verde Solaire's June 2025 explainer put the hybrid or battery add-on for a 3 kW system at ₹1 lakh to ₹1.5 lakh on top of the ₹1.99 lakh to ₹2.10 lakh on-grid price. The figure depends on the battery size and chemistry, so ask for it as a separate line in the quote. **How big a battery do I need for backup?** Add up the essential loads and the hours. Lights, fans, a router and a fridge come to roughly 400 W; four hours of that is 1.6 kWh. Lead-acid batteries are sized to use about half their capacity, so plan around 3 kWh of nominal storage for that load. An air conditioner changes the arithmetic completely. **How do I know if a quote includes backup?** It should say so in one line: backup during a power cut, yes or no, and if yes the battery make, model and capacity. If the bill of materials lists an on-grid string inverter and no battery, there is no backup, whatever was said on the phone. --- # Rooftop solar price in Delhi, 1 to 10 kW Source: https://www.verdesolaire.com/pricing/delhi Updated: Sun Sep 20 2026 00:00:00 GMT+0000 (Coordinated Universal Time) For many Delhi homes, 3 kW is the sensible starting point. It generates about about 326 units a month a month on the planning assumptions used here. Use the table below to compare other system sizes, then choose the electricity-board guidance that matches the name on your bill. ## The price table for Delhi | System | Published price | Central subsidy | State subsidy | Net payable | |---|---|---|---|---| | 1 kW | ₹70,000–₹80,000 | ₹30,000 | ₹26,000 | ₹14,000–₹24,000 | | 2 kW | ₹1,35,000–₹1,50,000 | ₹60,000 | ₹52,000 | ₹23,000–₹38,000 | | 3 kW | ₹1,99,000–₹2,10,000 | ₹78,000 | ₹78,000 | ₹43,000–₹54,000 | | 5 kW | ₹3,25,000–₹3,50,000 | ₹78,000 | ₹78,000 | ₹1,69,000–₹1,94,000 | | 10 kW | on request | ₹78,000 | ₹78,000 | quote-based | The published price covers panels, inverter, mounting structure, net metering, installation and warranty. The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, capped at ₹78,000 for 3 kW and above. Delhi adds ₹26,000 per kW, capped at up to ₹78,000. The two are paid on top of each other. The earlier ₹2,000 per kW, maximum ₹10,000 (replaced in July 2025) figure is no longer current. ## The incentive Delhi pays that Uttar Pradesh does not The incentive is claimed separately from the central subsidy: start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. Verde Solaire files both applications. The higher rate applies to any home system of 3 kW or less; larger home systems use the lower rate. ## Why 3 kW, and when 5 kW makes sense The subsidy formula is 60% of the benchmark cost for the first 2 kW and 40% for the part between 2 and 3 kW, capped at 3 kW. The combined ₹1,56,000 therefore covers roughly half of the published 3 kW price, and nothing more is added above 3 kW. At 5 kW the same subsidy sits against a higher price, so the net cost per kW rises; the extra 2 kW still generates at the same rate, and a home using more than about 400 units a month usually needs it. The official sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. Average twelve months of bills, not the June one. The [Delhi 3 kW page](/pricing/delhi/3-kw) and the [Delhi 5 kW page](/pricing/delhi/5-kw) work each size through in full; the [sizing guide](/learn/what-size-solar-system-do-i-need) covers the roof-area and sanctioned-load checks. ## Which electricity board you are on, and what it requires Delhi has three distribution licensees and one municipal area. BSES Rajdhani serves south and west Delhi, BSES Yamuna serves east and central Delhi, and Tata Power-DDL serves north and north-west Delhi; the NDMC area is served by the New Delhi Municipal Council and is handled separately. The name at the top of your bill decides the portal. BSES Rajdhani uses rts.bsesdelhi.com (helpline 19123, extension 3), Tata Power-DDL has the net-metering application and manual on tatapower-ddl.com, and for subsidised systems in every area PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. Under the DERC net-metering guidelines amended on 16 July 2026, a domestic connection up to 10 kW is to be connected within 10 days and there is no application fee; above 10 kW the timeline is 25 days. Since the 2024 amendment, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. Surplus generation is not lost: credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. Those are the rules; practice has been slower. Arun Sibal, whose New Delhi house was fitted within days of payment, wrote that the only issue was "the time taken in installing the net meter from BSES, which was actually not in control of Verde", and that the team kept him informed throughout. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. The process for each board is on the [Delhi net-metering page](/net-metering/delhi), with guides for [BSES Rajdhani](/net-metering/board/bses-rajdhani), [BSES Yamuna](/net-metering/board/bses-yamuna) and [Tata Power-DDL](/net-metering/board/tata-power-ddl). ## What a Delhi electricity bill does after solar DERC's last published domestic tariff schedule, for FY 2021-22, charges ₹3.00 (0–200 units), ₹4.50 (201–400), ₹6.50 (401–800), ₹7.00 (801–1,200) and ₹8.00 (above 1,200) per unit, plus a fixed charge of ₹20 (up to 2 kW), ₹50 (2–5 kW), ₹100 (5–15 kW), ₹200 (15–25 kW) and ₹250 (above 25 kW) per kW per month, a regulatory surcharge of 8% and a fuel surcharge that changes monthly and stood at 17.94% for BSES Rajdhani in June 2026. A home on 400 units a month sits at the top of the second slab. A 3 kW system generating about 326 units a month removes most of that consumption, and the two surcharges, which the calculator applies to the energy and fixed charges together, fall with it. The fixed charge stays, which is why the bill does not become zero. On the calculator's default assumptions the net cost of a 3 kW system in Delhi is recovered in under two years once the GBI is counted. The [bill calculator](/tools/electricity-bill-calculator) does the arithmetic for your own units and sanctioned load, and the [Delhi tariff explainer](/learn/delhi-electricity-tariff-explained) walks through each line of the bill. Delhi's free-power subsidy is separate. It is 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in, and with solar it is worked out on net units, that is import minus export. A home that imports fewer than 200 net units pays a near-zero energy charge either way, so the saving from solar is smaller for a subsidised household than the tariff alone suggests. The calculator does not model the free-power subsidy; treat its savings figure as an upper bound if you receive it. ## The zero-upfront scheme: approved, not yet notified On 1 September 2026 the Delhi Cabinet approved a second amendment offering a 2 or 3 kW rooftop system at no cost to eligible residential consumers using up to 400 units a month. The notification and operating rules are not yet published. If you use more than 400 units a month, or want more than 3 kW, the scheme as announced does not cover you and the paid route on this page is the one that applies. The [zero-upfront explainer](/subsidy/delhi-zero-upfront-scheme) tracks what is approved, what is notified and the questions still open. ## Paying for it: cash, loan or EMI The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Answers that quote around 7% (February 2024 figure, superseded) are repeating an old number. On the mid-point of the 3 kW net price the EMI comes out below the monthly saving on the calculator's defaults. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the paperwork with you. In July 2025 it published a Delhi offer under which the customer paid upfront and financed the balance by EMI; the loan rate has changed since, so ask for the current terms in writing before you rely on them. The [EMI calculator](/tools/emi-calculator) takes any principal, rate and tenure, and the [solar loan page](/solar-loan) lists the lenders and documents. ## Equipment and compliance A subsidised system must use both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on the ALMM List-II as well as the modules. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). Verde Solaire's published Delhi installations include a 10 kW system in Greater Kailash on Adani bifacial modules, where the customer wrote that the company fitted a better bifacial panel than the one agreed "without charging anything extra from us", and a 10 kW system in Janakpuri on Vikram modules with KSolare inverters. The company publishes 25-year performance warranties on all three panel types. Every quote names the make, model and wattage of each component so that you can check them against the approved lists; [panels, inverters and batteries](/equipment) explains what the names mean, and the [Greater Kailash](/projects/greater-kailash-delhi-10-kw-bifacial) and [Janakpuri](/projects/janakpuri-delhi-10-kw) project pages show the two systems. ## Where in Delhi we install Verde Solaire's registered office is in Sarvodaya Enclave, New Delhi, and its July 2025 price post lists the areas it serves as Saket, CR Park, Greater Kailash and Defence Colony in the south; Preet Vihar, Laxmi Nagar and Mayur Vihar in the east; Janakpuri, Dwarka and Rajouri Garden in the west; Model Town, Rohini and Ashok Vihar in the north; and Karol Bagh, Patel Nagar and Daryaganj in central Delhi, along with NDMC colonies. Independent houses and builder floors both work; on a builder floor the roof right and the sanctioned load on your connection decide the size, which the [builder floors guide](/learn/solar-on-builder-floors-and-shared-roofs) explains. The [Delhi installation page](/solar-installation/delhi) covers the survey, the shadow analysis and the structure; the company offers a free site evaluation and no-obligation proposal. Customers in Delhi have described the work in their own words. S. C. Garg's Greater Kailash system, installed when the company still traded as Sirius Electric, has "been working continuously without a single day breakdown since 2017". K. K. Sharma in Chhatarpur was "highly impressed with their shadow analysis process". The reviews below are reproduced as written. ## Questions **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **Is the Delhi solar subsidy ₹2,000 per kW or ₹26,000 per kW?** ₹2,000 per kW is the RWA or housing-society common-area subsidy, a separate scheme for the shared roof, not for an individual home. The homeowner subsidy in Delhi is ₹26,000 per kW, capped at ₹78,000, in addition to the central subsidy. **Is there a zero-upfront or free rooftop solar scheme in Delhi, and who qualifies?** The Delhi Cabinet approved one on 1 September 2026: up to 3 kW at zero upfront cost for households that averaged 400 units a month or less in FY 2025-26, subject to technical feasibility. The notification and operating rules still need confirmation. **How long does net metering take in Delhi, and what does it cost?** Under the DERC guidelines amended on 16 July 2026, a domestic system up to 10 kW is to be connected within 10 days and pays no application fee; above 10 kW the timeline is 25 days. Since the 2024 amendment no feasibility study is needed up to 10 kW on the same supply type. **Which electricity board handles my net meter in Delhi?** BSES Rajdhani in south and west Delhi, BSES Yamuna in east and central Delhi, Tata Power-DDL in north and north-west Delhi, and the NDMC area separately. The name at the top of your bill settles it; each has its own portal. **How many units does a 3 kW solar system generate per month in Delhi?** About 326 units a month on the planning yield used on this site (1,450 units per kW per year for Delhi with a 10% derate for dust and monsoon). Verde Solaire's June 2025 post quoted 360 to 400 units. Winter and monsoon months come in below the average, April to June above it. **Will I lose Delhi's 200 free units if I install rooftop solar?** The free-power subsidy is worked out on net units, that is import minus export, so a solar home that stays under 200 net units still qualifies. News coverage of the 1 September 2026 Cabinet decision said households that install solar keep it. Fixed charges apply either way. --- # Rooftop solar price in Ghaziabad, 1 to 10 kW Source: https://www.verdesolaire.com/pricing/ghaziabad Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) For a Ghaziabad home with two to four air conditioners, 3 kW is usually the first size to consider. It produces about about 338 units a month a month on the planning estimate and typically pays back in roughly four years on PVVNL’s domestic tariff. The published price is ₹1,99,000 to ₹2,10,000. After the central and Uttar Pradesh subsidy, the estimated amount is ₹91,000 to ₹1,02,000. Use the table below to compare 1, 2, 3, 5 and 10 kW, then check the PVVNL steps before you request a quote. ## The price table for Ghaziabad | System | Published price | Central subsidy | State subsidy | Net payable | |---|---|---|---|---| | 1 kW | ₹70,000–₹80,000 | ₹30,000 | ₹15,000 | ₹25,000–₹35,000 | | 2 kW | ₹1,35,000–₹1,50,000 | ₹60,000 | ₹30,000 | ₹45,000–₹60,000 | | 3 kW | ₹1,99,000–₹2,10,000 | ₹78,000 | ₹30,000 | ₹91,000–₹1,02,000 | | 5 kW | ₹3,25,000–₹3,50,000 | ₹78,000 | ₹30,000 | ₹2,17,000–₹2,42,000 | | 10 kW | on request | ₹78,000 | ₹30,000 | quote-based | Each published price covers panels, inverter, mounting structure, the net-metering work, installation and warranty. The ranges are the ones Verde Solaire posted in mid-2025 for Ghaziabad, Noida and Delhi, and a written quote after a roof survey replaces them. The central subsidy is fixed by capacity: ₹30,000 per kW for the first 2 kW, ₹18,000 for the third, and a ceiling of ₹78,000 for anything larger. Uttar Pradesh adds ₹15,000 per kW under its Solar Energy Policy 2022, capped at ₹30,000 per consumer, on top of the central subsidy. There is no published price for 10 kW because the structure, cable runs and inverter selection differ too much from roof to roof; it is surveyed and quoted per site. The subsidy on it is the same ₹78,000 from the Centre and ₹30,000 per consumer, on top of the central subsidy from the state, so the unsubsidised share grows with every kW above three. ## Where the subsidy stops: 2, 3 and 5 kW in Ghaziabad The state top-up runs out sooner than the central one. At ₹15,000 per kW, the Uttar Pradesh cap of ₹30,000 per consumer, on top of the central subsidy is reached at 2 kW, so a 2 kW system in Ghaziabad collects ₹90,000 in total and nets to ₹45,000 to ₹60,000. The third kW brings ₹18,000 more from the Centre and nothing further from the state. Even so, the combined ₹1,08,000 on 3 kW covers close to half the published price, which is why 3 kW is the size most PVVNL households settle on. At 5 kW the subsidy is unchanged in rupees and the price is not, so the net payable rises to ₹2,17,000 to ₹2,42,000 for about 563 units a month. That is the right size for a home already using 500 units or more a month, not for one hoping to grow into it. The official sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. Add up twelve months of PVVNL bills and divide by twelve; a size chosen from a May bill alone sits idle in January. The [5 kW page](/pricing/5-kw) works through the larger size in full. ## Ghaziabad's electricity board is PVVNL Homes in Ghaziabad are supplied by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), the UPPCL distribution company covering western Uttar Pradesh. It is the name at the top of a Ghaziabad bill. Noida city is on the same board. NPCL (Noida Power Company Limited) serves Greater Noida and Greater Noida West only, and Delhi has its own three licensees. For a Ghaziabad home, choose PVVNL on the application portal. Under the UPERC rooftop solar regulations, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net metering is the usual choice for a home: the meter records import and export separately, and the bill is settled on the difference. Gross metering, where the whole output is sold to the board at a fixed rate while the home keeps buying at the tariff, rarely pays for a household with daytime consumption. For energy injected beyond what the home consumes, the Third Amendment set compensation at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. It files the PM Surya Ghar application, attends the PVVNL inspection and follows the net meter until it is installed and reading. Customers on the same board in Noida have written about that part of the job. Brij Lal Bhardwaj, with 4 kW at his Sector 25 house, described the team completing the documentation and the liaison with the electricity board for the net meter, and then getting the subsidy processed. Mr. L. R. Singh, with 6 kW, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". The stage-by-stage PVVNL process for this city is on the [Ghaziabad net-metering page](/net-metering/ghaziabad). ## What a PVVNL bill looks like after solar Urban domestic energy charges in Uttar Pradesh for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, with a fixed charge of ₹110 per kW per month on the sanctioned load. Take a Ghaziabad home using 400 units a month on a 3 kW connection. Before solar, the last hundred units are billed at the 301 to 500 unit rate. A 3 kW system producing about 338 units a month nets most of that off; what remains is the fixed charge plus whatever the roof did not cover, mostly in the monsoon. The fixed charge stays whatever the panels generate, so a zero-bill promise is a promise about the energy charge only. The [bill calculator](/tools/electricity-bill-calculator) runs the slabs for your own units and sanctioned load, before and after. ## Paying for it: cash, the PM Surya Ghar loan or EMI The PM Surya Ghar loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which meant 5.75% on 28 July 2026, repayable over 10 years. The rate is tied to the repo rate, so it moves when the Reserve Bank moves. On the 3 kW net price the ten-year EMI is of the same order as the monthly energy charge the system removes, so the loan route is close to bill-neutral from the first month; the [EMI calculator](/tools/emi-calculator) takes any principal, rate and tenure. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the paperwork with you. Whichever route you take, the subsidy is transferred to your bank account by the government after the board's inspection and the commissioning certificate; it is not deducted by the installer, and no installer should ask you to sign it over. ## Equipment and the rules it must meet A subsidised system must use both the modules and the cells must be made in India, and for systems commissioned on or after 1 June 2026 the cells must appear on ALMM List-II, not only the modules on List-I. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), shown as its own line on the quote. Verde Solaire's published home installations used Adani Solar modules of 530 Wp (bifacial, in Greater Kailash) and 540 Wp (in Varanasi), and Vikram Solar modules with KSolare inverters (in Janakpuri); the 2025 price posts carried 25-year performance warranties on all three panel types. A quote should name the panel's make, model and wattage and the inverter's make and rating, so you can check both against the approved lists. The [equipment pages](/equipment) explain mono, bifacial and TOPCon, and when a battery is worth adding. ## Areas of Ghaziabad we serve Verde Solaire's June 2025 Ghaziabad page listed service coverage across Vaishali, Indirapuram, Raj Nagar, Crossing Republik and Sahibabad (as published in June 2025), and the company's own pages list no Ghaziabad office; the nearest is the head office at D-2, Sector 47, Noida. The same page gave the planning figures this site uses for a 3 kW roof: 300 to 350 square feet of shadow-free space, and 360 to 400 units a month before any derate. The roof decides more than the locality does. On an independent house the only question is shade from a water tank, a stair headroom or a neighbour's extension. On a builder floor, the roof right in the sale deed and the sanctioned load on your own connection decide the size, and the other floors need to agree in writing. A society roof falls under a different part of the scheme, with its own per-kW subsidy and cap. Verde Solaire offers a free site evaluation and no-obligation proposal; the survey measures the usable roof, reads the sanctioned load off the bill and confirms the size before a quote is written. The [Ghaziabad installation page](/solar-installation/ghaziabad) covers the visit, and the roof-right question on builder floors. ## What to confirm before you compare quotes Use these checks to compare like with like. They are the policy settings that shape the amount you pay, the loan offer and the application route in Ghaziabad. - The central subsidy is not ₹30,000 per kW for every kW. It is that for the first two, ₹18,000 for the third and nothing after, so ₹78,000 is the most any home receives. - The Uttar Pradesh subsidy is not a single flat sum. It is ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, and it is paid in addition to the central amount, not instead of it. - The concessional loan is no longer around 7% (February 2024 figure, superseded). It is repo rate plus 0.5 percentage points, which was 5.75% at the last official statement in July 2026. - GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). Pages quoting the older rate predate that change. - The scheme does not end in 2026. The published end date is 31 March 2027, and a Ghaziabad application goes through PVVNL, not NPCL. Use the figures above to compare complete quotes on the same system size, equipment and net-metering support. ## Questions **How much does a 3 kW solar system cost in Ghaziabad after subsidy?** On Verde Solaire's published mid-2025 range of ₹1,99,000 to ₹2,10,000, a 3 kW system in Ghaziabad nets to ₹91,000 to ₹1,02,000 after the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy. The written quote after a roof survey is the final price. **Which electricity board does net metering in Ghaziabad?** PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), a UPPCL company. Noida city is also on PVVNL; NPCL serves only Greater Noida and Greater Noida West. The name on your bill confirms it. **How many units does a 3 kW solar system generate in Ghaziabad?** Verde Solaire's published planning figure is 360 to 400 units a month from 300 to 350 square feet of shadow-free roof. With a 10% derate for dust and monsoon, the calculator on this site uses about 338 units a month. **Is the Uttar Pradesh solar subsidy still available in 2026?** The UP Solar Energy Policy 2022 gives ₹15,000 per kW capped at ₹30,000 on top of the central subsidy, and news reports in September 2026 confirm it is still being paid. **What is the solar loan interest rate under PM Surya Ghar?** Repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, collateral-free from nationalised banks over 10 years. The 7% figure many pages quote is from 2024. **Which areas of Ghaziabad does Verde Solaire cover?** As published in June 2025: Vaishali, Indirapuram, Raj Nagar, Crossing Republik and Sahibabad. Verde Solaire has no Ghaziabad office; the nearest is the head office in Sector 47, Noida. **Is GST included in the solar panel price in Ghaziabad?** GST is shown as a separate line on your written quote. Since 22 September 2025 it is about 8.9% on a complete rooftop plant: 5% on the panels and inverter, which count as 70% of the contract value, and 18% on the remaining 30% for other material and installation. --- # Rooftop solar price in Noida, 1 to 10 kW Source: https://www.verdesolaire.com/pricing/noida Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) For most Noida homes, 3 kW is the starting point: enough for roughly two to four air conditioners and about about 338 units a month of generation a month. The published price is ₹1,99,000 to ₹2,10,000. After the central and Uttar Pradesh subsidy, the estimated amount is ₹91,000 to ₹1,02,000. On Noida’s tariff, that investment typically pays back in three to five years. Use the table below to compare 1, 2, 3, 5 and 10 kW, then check the PVVNL process before you request a quote. ## The price table for Noida | System | Published price | Central subsidy | State subsidy | Net payable | |---|---|---|---|---| | 1 kW | ₹70,000–₹80,000 | ₹30,000 | ₹15,000 | ₹25,000–₹35,000 | | 2 kW | ₹1,35,000–₹1,50,000 | ₹60,000 | ₹30,000 | ₹45,000–₹60,000 | | 3 kW | ₹1,99,000–₹2,10,000 | ₹78,000 | ₹30,000 | ₹91,000–₹1,02,000 | | 5 kW | ₹3,25,000–₹3,50,000 | ₹78,000 | ₹30,000 | ₹2,17,000–₹2,42,000 | | 10 kW | on request | ₹78,000 | ₹30,000 | quote-based | The published price includes panels, inverter, mounting structure, net metering, installation and warranty. The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, capped at ₹78,000 for any system of 3 kW or more. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under the Saurya Uttar Pradesh Yojana in the state's 2022 solar policy. A 10 kW system is quoted per site because structure, cabling and the inverter choice vary more than on a 3 kW roof; the subsidy on it is the same ₹78,000 plus ₹30,000 per consumer, on top of the central subsidy. ## Why 3 kW is the size most Noida homes choose The subsidy formula pays 60% of the benchmark cost for the first 2 kW and 40% for the third, then nothing. On a 3 kW system the ₹1,08,000 combined subsidy covers roughly half the published price. On 5 kW the subsidy is the same rupee amount against a higher price, so the net cost per kW rises. If your consumption is above about 400 units a month, 5 kW still pays back, but the arithmetic is different: see the [5 kW page](/pricing/5-kw). The published sizing guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. A quick check: add up twelve months of bills and divide by twelve; summer alone will oversize the system. ## Net metering in Noida: PVVNL, not NPCL Noida city's electricity distributor is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Check the name at the top of your bill before starting the application. Under the UPERC rooftop solar regulations, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The third amendment of those regulations set a compensation rate for injected surplus of the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). Verde Solaire files the PM Surya Ghar application, attends the PVVNL inspection and follows the net meter through to activation. Customers in Noida have written about exactly this: a 4 kW installation in Sector 25 whose owner wrote that the team handled the documentation and the liaison for the net meter with the electricity department, and a 6 kW system whose owner "was also able to get solar subsidy in record time because of the follow up of the team". The full process is on the [Noida net-metering page](/net-metering/noida). ## What the electricity bill does after solar Uttar Pradesh urban domestic tariffs for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, plus a fixed charge of ₹110 per kW per month. A home using 400 units a month sits in the third slab; a 3 kW system generating about 338 units a month removes most of that consumption, and the bill falls to the fixed charge plus whatever the system did not cover. The [bill calculator](/tools/electricity-bill-calculator) shows the exact arithmetic for your units and sanctioned load. The fixed charge does not go away, which is why "zero bill" claims are not honest; the honest claim is that the energy charge largely disappears. ## Paying for it: cash, loan or EMI The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. On the mid-point of the 3 kW net price that is an EMI close to the monthly saving, which is the point of the scheme. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and helps with the application. The [EMI calculator](/tools/emi-calculator) takes any rate and tenure. ## Equipment and compliance Subsidised systems must use both the modules and the cells must be made in India, and since 1 June 2026 the cells must appear on the ALMM List-II. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). Verde Solaire's recent Noida and Delhi installations used Adani and Vikram modules of 530 to 545 Wp with KSolare and Delta inverters; every quote names the make and model so you can check them against the approved lists. Read [panels, inverters and batteries](/equipment) for what those names mean. ## Sectors we have installed in Verde Solaire's head office is in Sector 47, and published installations and reviews cover Sectors 25, 41, 47 and 50 among others, with customers describing systems from 4 kW to 20 kW at Noida homes. Independent houses and builder floors both work; for a builder floor the roof right and the sanctioned load on your connection decide the size, which the [installation page for Noida](/solar-installation/noida) covers. ## Questions **How much does a 3 kW solar system cost in Noida after subsidy?** On Verde Solaire's published July 2025 range of ₹1,99,000 to ₹2,10,000, a 3 kW system nets to ₹91,000 to ₹1,02,000 after the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy. **Which electricity board handles net metering in Noida?** Noida city is served by PVVNL, a UPPCL company. Greater Noida and Greater Noida West are served by NPCL. Check the name on your bill; the two have different portals. **How many units will 3 kW generate in Noida?** Verde Solaire's published planning figure is 360 to 400 units a month, from about 300 to 350 square feet of shadow-free roof. **Does the UP subsidy still apply in 2026?** The UP Solar Energy Policy 2022 provides ₹15,000 per kW capped at ₹30,000 on top of the central subsidy, and September 2026 news reports confirm it is still being paid. UPNEDA has not published a separate 2026 notice yet. --- # School in Ayodhya: 20 kW Source: https://www.verdesolaire.com/projects/ayodhya-school-20-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 20 kW solar power plant at a school in Ayodhya, Uttar Pradesh. The school reports a smooth installation and a lower electricity bill after several years of operation. ## What the school said The school’s experience combines two things that matter in an institutional project: a smooth installation and an electricity bill reduced over years of use. ## At a glance | Project detail | Information | |---|---| | Capacity | 20 kW | | Site | A school in Ayodhya, Uttar Pradesh | | Customer's account | Smooth installation and lower electricity bill | ## Where it sits in Verde Solaire's school and college work Schools and colleges are a published line of work for the company. In an update of November 2024 it said it was installing 10 kW plants at schools and 20 kW plants at colleges, from its offices in Noida, New Delhi and Varanasi. The Varanasi branch, at Chetgunj, is the office nearest Ayodhya; the head office is in Sector 47, Noida. Other institutional plants with their own pages give a fuller picture of what the company has done at this scale. The [20 kW plant at NISST in Punjab](/projects/nisst-punjab-20-kw) was installed for Central Electronics Limited with CEL panels. The [35 kW plant at a college in Greater Noida](/projects/greater-noida-college-35-kw) dates from 2019. The [147 kW plant at C-MET in Pune](/projects/c-met-pune-147-kw) was ordered through CPWD and used Emmvee panels with a Delta inverter. Across all its work the company is ISO 9001:2015 certified and states it has delivered more than 50 MW of solar projects. ## What a school in Uttar Pradesh should ask before a 20 kW plant The central household subsidy under PM Surya Ghar: Muft Bijli Yojana goes to an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. A school is not a household, so an institutional plant is priced without it, and the case rests on how much of the school's consumption falls in daylight hours, on its tariff, and on net metering with its electricity board. Classrooms, fans, computer rooms and pumps draw most of their power while the sun is up, which is the load pattern that suits a grid-connected plant without batteries. Before signing, ask for the make and model of the panels and the inverter in writing, the structure design and its wind rating, confirmation that the net-metering application is included and who files it, and the warranty terms on paper. The [institutions page](/solutions/institutions) explains how Verde Solaire scopes a school or college plant, the [commercial payback model](/tools/commercial-payback) turns a monthly bill into a payback estimate, and [how to choose a solar company](/learn/how-to-choose-a-solar-company) lists the eight checks that apply to any installer. Warranty and service terms are on the [warranty and after-sales page](/about/warranty-and-after-sales). ## Questions **What did Verde Solaire install at the school in Ayodhya?** A 20 kW solar power plant. The school's review on Verde Solaire's testimonials page, written by Atul Singh, says the plant was installed four years before the review, that the installation was very smooth, and that the school's electricity bill has come down since. **Does Verde Solaire install solar at schools and colleges in Uttar Pradesh?** Yes. In a November 2024 update the company said it was installing 10 kW plants at schools and 20 kW plants at colleges, and it has offices in Noida, New Delhi and Varanasi. The Ayodhya school and a 35 kW college plant in Greater Noida are the two school or college sites with a customer review on its testimonials pages. **Can a school claim the PM Surya Ghar subsidy on a 20 kW plant?** The PM Surya Ghar household subsidy is for an Indian citizen who owns a house with a suitable roof and a valid electricity connection. A school is not a household, so an institutional plant is priced without that subsidy and the case rests on daytime consumption, the tariff and net metering with the electricity board. --- # Solar batteries: when you need one Source: https://www.verdesolaire.com/equipment/solar-batteries Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) If your home is on the grid, you almost certainly do not need a solar battery. An on-grid rooftop system sends its daytime surplus to the grid through the net meter and takes it back at night as credit on the bill, so the grid does the storing at no charge. A battery earns its place in two cases only: power cuts long or frequent enough that you want the solar to carry the house through them, which is a hybrid system, or a site with no grid connection, which is off-grid. In both cases the battery is paid for in full by you: the PM Surya Ghar: Muft Bijli Yojana pays by solar capacity, and a battery adds nothing to it. That is the short answer. The rest of this page explains how a battery fits a rooftop system, which chemistry suits which job, how to size one around the loads that must not stop, and how a quote should state it. ## What a solar battery does in a rooftop system A solar battery stores electricity the panels make and are not using, and gives it back when they make too little: at night, on a heavily overcast day, or during a power cut. Verde Solaire's own product page puts it the same way, and adds the argument most battery sellers lead with: without storage, the surplus goes to the grid and other people use it. In Delhi and Uttar Pradesh that argument has an answer. Under net metering the surplus is not lost; it is credited. In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. A unit sent out at noon and taken back at nine in the evening costs you nothing but the meter reading, whereas a unit stored in a battery costs the battery's price divided by the number of units it will ever hold. For a home with a grid connection, the meter wins on cost every time. The [net-metering guide](/net-metering) covers the rules by board. What the meter cannot do is keep the lights on when the grid fails. An on-grid inverter shuts down the moment the supply drops, by design, so that nothing flows back into a line a lineman may be repairing. If that matters to you, a battery is the only fix, and the rest of this page is about doing it properly. ## Do you need one: three cases **On-grid, the usual case.** A house with a grid connection, a roof and cuts that are short and rare. No battery; on-grid solar and net metering. Verde Solaire's June 2025 explainer says the supply in Delhi, Noida, Ghaziabad and Varanasi is "mostly stable", recommends on-grid with net metering and the subsidy, and advises adding batteries "only if frequent power cuts are a concern". If you already own an inverter battery, keep it: it charges from the grid as before and runs its circuits during a cut, alongside the solar. The [rooftop solar or inverter battery](/learn/rooftop-solar-or-inverter-battery) page sets the two side by side. **Hybrid, for cuts.** A house on the grid where cuts run for hours, arrive most evenings, or fall on loads that cannot stop: a home office, a lift, medical equipment, a shop's refrigeration. A hybrid inverter replaces the on-grid one, a battery hangs off it, the net meter stays, and the grid still covers what the panels and battery miss. This is the case the rest of the page assumes. **Off-grid, only without a grid.** A farmhouse, a site beyond the last pole, a plot where the connection is years away. Panels, a charge controller or off-grid inverter, and a battery bank sized to carry the whole load through the night and through cloudy days. Everything the grid would have done, the battery does, so it is the largest and most expensive part. Verde Solaire's explainer is plain that this route carries no subsidy under PM Surya Ghar. The [off-grid and hybrid page](/solutions/off-grid-hybrid) covers the equipment for both of the last two cases. ## Lithium or lead-acid Two chemistries are sold for homes in India, and the trade-offs below are general: the make and model in your quote, and its datasheet, are what count. **Lead-acid**, usually tubular, is the chemistry of the inverter battery already in most Delhi NCR homes. It is the cheaper to buy per kWh of rated capacity. Against that: it is sized to use only about half of that capacity, so a 150 Ah battery gives you roughly half of what the label suggests; the flooded type needs distilled water topping up and a ventilated place to stand, because it gives off gas on charge; it is heavy and takes floor space; and it wears out in hundreds of full cycles rather than thousands, faster still in a 45-degree summer. It suits backup that is used a few times a month and stays mostly idle. **Lithium**, almost always lithium iron phosphate (LFP) for homes, costs more up front. Against that: it can use most of its rated capacity, so a smaller bank does the same job; it needs no topping up; it is lighter and can be wall-mounted; a built-in battery management system watches every cell; and it is rated for thousands of cycles. It suits a battery that is cycled every day, which is what a hybrid system with solar does. It also needs a hybrid inverter that speaks its communication protocol, which is one more reason to buy the inverter and the battery as one design rather than adding one to the other later. The [inverter page](/equipment/solar-inverters) explains what a hybrid inverter is and how to recognise one in a bill of materials. Heat is the enemy of both. A battery on a bare roof or in a tin shed loses life fast; a shaded, ventilated place indoors or in a covered stairwell is worth planning for before the survey. Verde Solaire is an authorised solar solutions partner of Luminous, a brand that makes both inverters and batteries for Indian homes, and its quotes name the make and model of every component. ## Sizing for the loads that must not stop A battery is sized to the circuits it will carry and the hours it must carry them, not to the size of the solar system. The arithmetic is short, and every figure below is an assumption to be replaced by your own appliances on the survey. Start with the list. A refrigerator averages about 150 W over an evening, two ceiling fans about 150 W, four LED lights about 40 W, a router and a television together about 120 W. Call the essential circuit 500 W. Six hours of that is 3 kWh of stored energy. Divide by the usable share of the battery: lead-acid at about half gives roughly 6 kWh of rated capacity, which is four 150 Ah batteries in a 48 V bank; lithium at about 90% gives roughly 3.5 kWh, a single wall-mounted module on most brands. Now add one air conditioner. A 1.5-ton inverter air conditioner draws around 1 to 1.5 kW once the room is cool, so four evening hours is 4 to 6 kWh on its own, more than the whole essential circuit. This is why "backup" in a quote must name the appliances: backup for the lights and fans and backup for the bedroom air conditioner are different batteries at different prices. Two more checks. The panels have to recharge the battery the next morning on top of running the house, so a hybrid that is cycled daily wants solar capacity to match; Verde Solaire's explainer suggests larger homes and villas looking at full solar use plan for 8 kW or more with a battery. And the hybrid inverter must be rated for the loads that start together: a fridge compressor and an air conditioner switching on in the same second draw several times their running power. An engineer confirms both on the survey, which Verde Solaire offers as a free site evaluation and no-obligation proposal. ## What the subsidy covers, and why the battery is outside it The central subsidy is 60% of the benchmark cost for the first 2 kW and 40% for the part between 2 and 3 kW, capped at 3 kW, which works out to ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000. Delhi adds ₹26,000 per kW capped at up to ₹78,000; Uttar Pradesh adds ₹15,000 per kW capped at ₹30,000 per consumer, on top of the central subsidy. Every one of those figures is a function of kilowatts of panels. There is no line for storage, so a battery neither raises the subsidy nor disqualifies the system; it is simply outside the arithmetic. The [subsidy guide](/subsidy) has the full rules. Two consequences follow. An off-grid system has no grid connection and no net meter, and eligibility requires an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy, so it gets no subsidy, as Verde Solaire's own explainer states. A hybrid system that keeps its grid connection and net meter can claim the subsidy on its solar capacity; the panel rules are unchanged, so both the modules and the cells must be made in India, and ALMM List-II applies to net-metering systems commissioned from 1 June 2026. Ask the installer to confirm in writing that the hybrid inverter model named in the quote is accepted by your electricity board for net metering, because that approval, not the subsidy portal, is where a hybrid can stall. ## What it costs, and how the quote should say it Verde Solaire's June 2025 explainer is the company's only published battery figure: the hybrid or battery add-on for a 3 kW system at to on top of the on-grid price of ₹1,99,000 to ₹2,10,000, and a 5 kW off-grid system with batteries at to . Those are indicative and a year old; capacity, chemistry and brand move the number a long way, and the written quote after a survey is the price. The on-grid figures by size are on the [3 kW price page](/pricing/3-kw). Whatever the number, ask for the battery as its own line, with five things on it: make and model; rated capacity in kWh and the usable share; the circuits it carries and the hours it is designed for; the warranty in years and in cycles, and what counts as end of life; and which part of the total the subsidy applies to. A quote that lists an on-grid string inverter and no battery is a quote with no backup, whatever was said on the phone. The [before you pay the advance](/learn/before-you-pay-the-advance) checklist has a line for exactly this. ## Questions **Do I need a battery with rooftop solar?** Not if your home has a grid connection and a net meter. The grid takes the surplus by day and gives it back at night as credit on the bill. You need a battery only for backup during power cuts (a hybrid system) or where there is no grid at all (off-grid). **Is there a PM Surya Ghar subsidy on a solar battery?** No. The subsidy is fixed by solar capacity: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000, plus the Delhi or Uttar Pradesh top-up. A battery adds nothing to it, and an off-grid system with no grid connection gets no subsidy at all. **Lithium or lead-acid for a solar battery at home?** Lead-acid costs less to buy, uses about half its rated capacity, needs topping up and lasts fewer cycles. Lithium costs more, uses most of its rated capacity, needs no maintenance and lasts longer. For daily cycling with solar, lithium usually costs less per unit stored over its life; for a few cuts a month, the lead-acid inverter battery you already own may be enough. **How much does a solar battery cost in Delhi or Noida?** Verde Solaire's June 2025 explainer put the hybrid or battery add-on for a 3 kW system at ₹1 lakh to ₹1.5 lakh on top of the ₹1.99 lakh to ₹2.10 lakh on-grid price, and a 5 kW off-grid system with batteries at ₹3.5 lakh to ₹4.5 lakh. Capacity and chemistry decide the real figure, so ask for it as a separate line in the quote. **How big a solar battery do I need for power cuts?** List the appliances that must run during a cut, multiply each by the hours, and add them up. A fridge, two fans, four lights, a router and a television come to about 500 W; six hours is 3 kWh. Lead-acid needs roughly 6 kWh of rated capacity for that; lithium about 3.5 kWh. One air conditioner doubles the figure or more. **Can I add a battery to my on-grid solar system later?** Yes, but usually with a change of inverter. An on-grid string inverter has no battery connection; adding storage means either a hybrid inverter in its place or a separate battery inverter alongside it. If you expect to add a battery within a few years, say so before the quote so the inverter is chosen once. --- # Solar installation company in Delhi Source: https://www.verdesolaire.com/solar-installation/delhi Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installs on-grid rooftop solar for homes, housing societies and businesses across Delhi. The company is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, which is the registration a Delhi home needs to receive the ₹78,000 central subsidy and the Delhi state subsidy of ₹26,000 per kW, capped at up to ₹78,000. Its registered office is at C-213, Sarvodaya Enclave, New Delhi, and the first visit is a free site evaluation and no-obligation proposal. Delhi has three electricity boards and one municipal licensee, and the name on your bill decides which portal your net-meter application goes through. BSES Rajdhani covers south and west Delhi and runs its rooftop solar service at rts.bsesdelhi.com (helpline 19123, extension 3); BSES Yamuna covers east and central Delhi; Tata Power-DDL covers north and north-west Delhi; the NDMC area is handled separately. Verde Solaire files with all of them. This page explains what to check before you hire any installer in the city, how we answer each check, what changes between an independent house, a builder floor and a flat, and where in Delhi we have worked. ## Eight things to check in any Delhi installer Most of the trouble homeowners describe comes from one of eight gaps: an unregistered vendor, unnamed components, panels that fail the subsidy rules, a weak structure, net metering left out of the price, a subsidy that never arrives, vague warranty terms, and nobody to call afterwards. Ask every installer these questions, including us. **1. Is the vendor registered on the national portal?** The subsidy rule is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. Search the portal's vendor list for your board before you pay an advance; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where to look. **2. Does the quote name the make and model of every component?** A quote that says "Tier 1 panels" tells you nothing. Verde Solaire's published Delhi installations name their parts: Adani 530 Wp bifacial modules on a 10 kW Greater Kailash roof, and Vikram modules with KSolare inverters on a 10 kW Janakpuri roof. Your quote does the same, so you can look each part up. **3. Do the panels qualify for the subsidy?** A subsidised system must use both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on the ALMM List-II as well as the modules. An imported or non-DCR module disqualifies the whole application. Every module we quote for a subsidised home is checked against the current list; [ALMM List-II explained](/learn/almm-list-ii-explained) covers the rule. **4. What is the structure?** Delhi terraces are used for water tanks, drying and the summer evening, so the structure matters as much as the panel. An elevated structure keeps the terrace usable underneath; a Janakpuri customer described his "elevated module mounting structure" in his review. The survey decides between elevated and low-rise mounting on the basis of your roof, not a catalogue. **6. When does the subsidy arrive, and from whom?** You pay the installer; the government pays you. The official timeline is "within 30 days" of the claim; about 15 days on average and the reported practice is 30–45 days after verification in practice. No installer can "deduct" the subsidy from the invoice; anyone who offers to is asking you to take their word for the government's money. The [who pays whom guide](/subsidy/who-pays-whom) walks through the sequence. **7. What exactly is under warranty?** Verde Solaire publishes 25-year performance warranties on all three panel types. Inverter and workmanship terms are written into each quote rather than published as a single figure, so read that section before you sign; the [warranty and after-sales page](/about/warranty-and-after-sales) explains what to look for. **8. Who answers the phone in year three?** A Delhi customer with a 12 kW system wrote that the company "is very prompt in responding to queries if any". Another, whose Greater Kailash system dates from the Sirius Electric years, wrote that it "has been working continuously without a single day breakdown since 2017". Those are the after-sales facts we can publish. ## Independent houses, builder floors and society flats **Independent houses** are the simplest case. The owner holds the roof, the connection and the bill, and the only questions are the shadow-free area and the sanctioned load. A 3 kW system needs about 300 to 350 square feet of clear roof by the company's published figure, and Verde Solaire installs home systems from 1 kW to 50 kW. **Builder floors** are the common Delhi case and the one that needs the most care. The roof usually belongs to the top floor, or is shared by agreement. If you have the roof right, the installation is like a house: the system connects to your own meter, and the size is limited by your sanctioned load. If you do not, virtual net metering is the route: the Seventh Amendment of 20 January 2026 opens virtual net metering to all Delhi consumers, with DISCOMs bearing line and network costs up to set caps. The [builder floors guide](/learn/solar-on-builder-floors-and-shared-roofs) explains both routes. ## Where in Delhi we install Verde Solaire's July 2025 price post lists the areas it serves: Saket, CR Park, Greater Kailash and Defence Colony in south Delhi; Preet Vihar, Laxmi Nagar and Mayur Vihar in the east; Janakpuri, Dwarka and Rajouri Garden in the west; Model Town, Rohini and Ashok Vihar in the north; Karol Bagh, Patel Nagar and Daryaganj in central Delhi; and the NDMC colonies. Customer reviews add Chhatarpur in the south. The list is where the company has worked and named, not a boundary. ## What Delhi customers have installed The published Delhi record is residential, mostly 10 kW and above. Jai Kumar Manghnani's 10 kW system in Greater Kailash I was quoted on 530 W mono PERC Adani panels and built on Adani bifacial panels instead, "without charging anything extra from us", and the company helped with the central subsidy application. Navin Verma's 10 kW Janakpuri system used Vikram panels and KSolare inverters; he wrote that the installation was quick and of very good quality, and that the net-metering process was delayed by the electricity board rather than the installer. K. K. Sharma's 10 kW system in Chhatarpur came with a shadow analysis he found impressive. Sohail Dhir's 12 kW residence, Nikunj Aggarwal's 20 kW residence, and S. C. Garg's Greater Kailash system, running since 2017, complete the published list. The [Greater Kailash](/projects/greater-kailash-delhi-10-kw-bifacial) and [Janakpuri](/projects/janakpuri-delhi-10-kw) project pages describe two of them in detail. ## How the work goes, from first call to first bill The process follows the three stages on Verde Solaire's residential page: evaluation and consultation, proposal, then installation and support. The first conversation is on the phone: your monthly units, roof type, and which board you are on. Then an engineer visits, measures the shadow-free area, runs the shadow analysis, checks the sanctioned load on your bill and the cable route to the meter, and confirms that the roof suits solar at all. The visit is free and carries no obligation. The written proposal follows the survey. It shows the gross price, the central and Delhi subsidy as separate lines, the net payable, and the make, model and wattage of each component. Payment is in stages tied to booking, delivery and commissioning; the exact stages are printed in the quote. The subsidy is not one of those stages, because it comes to you from the government after commissioning. ## What it costs, in one paragraph A 3 kW system, the size most Delhi homes choose, is ₹1,99,000 to ₹2,10,000 on the published price list and ₹43,000 to ₹54,000 after the combined ₹1,56,000 subsidy. It generates about 326 units a month on the planning yield used across this site. A 5 kW system costs more per kW after subsidy, because the subsidy stops at 3 kW, but suits a home above about 400 units a month. The [solar calculator](/tools/solar-calculator) runs any size for your board and units, and Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans if you would rather pay by EMI. ## Questions **Is Verde Solaire a registered PM Surya Ghar vendor in Delhi?** Yes. Verde Solaire's FAQ page states that it is a registered vendor under PM Surya Ghar: Muft Bijli Yojana in Delhi and Uttar Pradesh. You can confirm this yourself by searching the vendor list for your electricity board on pmsuryaghar.gov.in before you pay anything. **Which areas of Delhi does Verde Solaire install in?** The company's July 2025 price post lists Saket, CR Park, Greater Kailash and Defence Colony in the south; Preet Vihar, Laxmi Nagar and Mayur Vihar in the east; Janakpuri, Dwarka and Rajouri Garden in the west; Model Town, Rohini and Ashok Vihar in the north; Karol Bagh, Patel Nagar and Daryaganj in central Delhi; and NDMC colonies. Published customer reviews add Chhatarpur. **Does the quoted price include net metering and the subsidy application?** Yes. The published price covers panels, inverter, mounting structure, net metering, installation and warranty. Verde Solaire files the PM Surya Ghar application, the net-meter application with your electricity board and the Delhi state subsidy claim on solar.delhi.gov.in. **How long does a rooftop solar installation take in Delhi?** Verde Solaire has not published a standard installation time. A New Delhi customer wrote that his system was installed within a few days of payment. The net meter is then in the electricity board's hands: under the DERC guidelines of 16 July 2026 a domestic system up to 10 kW is to be connected within 10 days, with no application fee. **Can I put solar on a builder floor in Delhi?** Usually, if you have the right to use the roof and your connection's sanctioned load allows the size you want. Without roof rights, DERC's Seventh Amendment of 20 January 2026 opened virtual net metering to all Delhi consumers, which credits a plant elsewhere against your meter. **What does the first visit cost?** Nothing. Verde Solaire's residential page states that the site evaluation is free and the proposal carries no obligation. The visit covers the roof area, shadow analysis, the sanctioned load on your bill and the cable route. **Which electricity board handles my net meter in Delhi?** The one printed at the top of your bill: BSES Rajdhani in south and west Delhi, BSES Yamuna in east and central Delhi, Tata Power-DDL in north and north-west Delhi, and NDMC in its own area. Each has its own portal; BSES Rajdhani's is rts.bsesdelhi.com. --- # Solar installation company in Ghaziabad Source: https://www.verdesolaire.com/solar-installation/ghaziabad Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installs rooftop solar in Ghaziabad for independent houses, builder floors and housing societies, with home systems from 1 kW to 50 kW and larger plants for factories and institutions. The company is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects with a team with combined experience of more than 2,000 MW, and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, which is the registration a Ghaziabad household needs for the PM Surya Ghar: Muft Bijli Yojana subsidy. There is no Ghaziabad office; the survey and installation teams work from the head office in Sector 47, Noida, and the company's June 2025 Ghaziabad page lists coverage across Vaishali, Indirapuram, Raj Nagar, Crossing Republik and Sahibabad. Ghaziabad homes are supplied by PVVNL, and Uttar Pradesh adds a state subsidy capped at ₹30,000 per consumer, on top of the central subsidy on top of the central amount. The rest of this page is for someone comparing installers: eight checks and how Verde Solaire answers each, what changes between a kothi, a builder floor and a society flat, the nearest installations customers have written about, and what the free site visit involves. ## Eight things to check in any Ghaziabad installer Put the same eight questions to every company you are considering, including this one, and compare the written answers. The rule behind the first question is fixed by the scheme: the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. **1. Registration for your board.** The vendor lists are kept per electricity board, so a firm registered for a Delhi licensee is not automatically registered for PVVNL. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, as stated on its FAQ and in its May 2025 application guide. Check the name on the list against the name on the quote and the GST invoice; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where the list is. **2. Named components.** A quote should carry the panel make, model and wattage and the inverter make and rating, not a phrase like "Tier-1 panels". Verde Solaire's published home installations name Adani Solar and Vikram Solar modules with KSolare inverters, and its published prices are for systems using panels with 25-year performance warranties on all three panel types. A quote from us names every component so that any later substitution has to be an upgrade you agreed to. **3. ALMM.** For a subsidised system, both the modules and the cells must be made in India, and for net-metering projects commissioned from 1 June 2026 the cells must be on ALMM List-II. A named model is a model you can look up; [ALMM List-II explained](/learn/almm-list-ii-explained) walks through the list. **4. The structure.** Ask for the material, the elevation, the anchoring and the wind load it is designed for, and ask for a shadow analysis; Ghaziabad gets the same dust storms and monsoon gusts as the rest of Delhi NCR. K. K. Sharma, with 10 kW in Chattarpur, wrote: "I was highly impressed with their shadow analysis process." Navin Verma's Janakpuri system used "an elevated module mounting structure", which keeps the roof usable underneath. **5. Net metering inside the price.** A price that leaves out the net-metering application, earthing or the AC and DC distribution boxes is not a price for a working system. Verde Solaire's published prices include panels, inverter, mounting, net metering, installation and warranty, and its Ghaziabad page lists documentation for the subsidy, the loan and net metering as part of the job. The stage-by-stage PVVNL process is on the [Ghaziabad net-metering page](/net-metering/ghaziabad). **6. Subsidy timing and who pays whom.** You pay the installer; the government pays you, after the PVVNL inspection and the commissioning certificate, officially "within 30 days" of the claim; about 15 days on average. Reports describe 30–45 days after verification in practice. The quote should show the gross price, the subsidy and the net as three separate lines, never the subsidy as a deduction from the invoice. **7. Warranty terms in writing.** There are three: the panel manufacturer's performance warranty, the inverter manufacturer's warranty and the installer's own workmanship warranty. Verde Solaire's 2025 price posts stated 25-year performance warranties on all three panel types, and its Dharuhera plant was published with a ten-year Havells inverter warranty. The inverter and workmanship terms for your system are set out in the written quote, and the [warranty page](/about/warranty-and-after-sales) explains how a claim is handled. **8. After-sales.** Ask who answers the phone after commissioning. Verde Solaire publishes an Android app for its customers, and Sohail Dhir, with 12 kW in New Delhi, wrote that the company "is very prompt in responding to queries if any". Ask at the survey for two customers near you; the [reviews page](/reviews) lists every published review verbatim. The same eight checks, with red flags, are on [how to choose a solar company](/learn/how-to-choose-a-solar-company). ## Independent houses, builder floors and society flats The locality matters less than the type of roof, and Ghaziabad has all three. **An independent house** in Raj Nagar, Sahibabad or an older colony is the simplest case. The roof is yours, the connection is yours, and the only questions are shade from the water tank, the stair headroom or a neighbour's extension, and whether the sanctioned load on the bill matches the size you want. The published planning figure is 300 to 350 square feet of shadow-free roof for 3 kW. **A builder floor** in Vaishali or Indirapuram shares one terrace between three or four owners. The system is wired to your own PVVNL connection and applied for like any house, but you need the right to use the terrace in writing from the other owners before anything goes up, and the shadow-free area you can claim is a share of the roof, not all of it. The [builder floors guide](/learn/solar-on-builder-floors-and-shared-roofs) covers who signs and what one floor's sanctioned load allows. **A society flat** in Crossing Republik or the apartment blocks of Indirapuram cannot put panels on the common roof for one flat. The route is a common-area plant owned by the society, with a central subsidy of ₹18,000 per kW for up to 500 kW (3 kW per house), EV charging included. That plant reduces the society's common-area bill for lifts, pumps and lighting, not your own flat's bill. Uttar Pradesh lets a household choose net or gross metering on its own connection, and Uttar Pradesh has not published a virtual net-metering arrangement the way Delhi has one, so a flat owner should ask PVVNL in writing before planning a shared plant. The [housing societies page](/solutions/housing-societies) sets out the society route. ## Ghaziabad's electricity board and subsidy Ghaziabad is on the same board as Noida city: PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). NPCL serves Greater Noida and Greater Noida West only, and Delhi's three licensees stop at the border. The name printed on your bill confirms the board for your application. Under the UPERC rooftop solar regulations, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net metering is the arrangement a home wants. The central subsidy is capped at ₹78,000 for 3 kW and above, and the state adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy. The published prices for 1 to 10 kW with both subsidies applied are on the [Ghaziabad pricing page](/pricing/ghaziabad); the [solar calculator](/tools/solar-calculator) runs the figures for your own size and bill. ## Installations near Ghaziabad that customers have written about The closest published customer installations are in Noida, a short drive from Vaishali and Indirapuram and on the same electricity board. Ask to see project examples relevant to your roof and system size during the survey. Brij Lal Bhardwaj, with 4 kW at his Sector 25 house, wrote that the team did the complete installation, the documentation and the liaison with the electricity department for the net meter, and that the subsidy was then processed. L. R. Singh, with 6 kW, "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". Aurbind Sharma, with 7 kW at his Sector 41 residence, wrote that the team "completed the installation in record time". Parmod Jain, with 20 kW at his Noida residence, came to the company on the recommendation of a friend whose New Delhi plant it had installed. In Greater Noida, P. Sharma's college has run a 35 kW system since 2019 and wrote that it "has resulted in huge savings in electricity bill to the college". Two Delhi reviews describe the part no installer controls. Navin Verma wrote that the installation was quick and of very good quality, but that the net-metering process was delayed by the electricity board. Arun Sibal wrote that the meter from his Delhi board took time, "which was actually not in control of Verde", and that "Verde people always kept me in the loop regarding the net meter status". That is the honest position for PVVNL too: the application, the uploads and the follow-up are the installer's job, and the inspection roster is the board's. Larger plants, from 110 kW to 430 kW, are in the [projects section](/projects). ## How the work runs, from survey to subsidy Verde Solaire offers a free site evaluation and no-obligation proposal. Nobody is asked to decide on the day. 1. Free site visit 2. Written quote 3. Application before installation 4. Installation 5. Plant details, inspection and meter 6. Commissioning certificate and subsidy Payment is tied to stages of the work rather than paid up front; the schedule belongs in the written quote, and the [advance checklist](/learn/before-you-pay-the-advance) explains what a fair one looks like. If you want the loan route, the PM Surya Ghar loan is collateral-free, from nationalised banks and Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans; the [solar loan page](/solar-loan) has the rate and tenure. The full method, including what the company does and does not promise, is on [how we work](/about/how-we-work). ## Questions **Is Verde Solaire a registered solar vendor for Ghaziabad?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, so it can install subsidised systems for PVVNL consumers in Ghaziabad. Confirm it yourself on the vendor list for PVVNL on pmsuryaghar.gov.in before you pay an advance. **Does Verde Solaire have an office in Ghaziabad?** No. The nearest office is the head office at D-2, 2nd Floor, Sector 47, Noida. The company's June 2025 Ghaziabad page lists service coverage across Vaishali, Indirapuram, Raj Nagar, Crossing Republik and Sahibabad; the survey team travels from Noida. **How much does a 3 kW solar system cost in Ghaziabad?** Verde Solaire's published mid-2025 range is ₹1,99,000 to ₹2,10,000 before subsidy. After the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy the net payable is ₹91,000 to ₹1,02,000. The written quote after a roof survey is the price. **Which electricity board handles net metering in Ghaziabad?** PVVNL, Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company. It also serves Noida city. NPCL serves only Greater Noida and Greater Noida West. Verde Solaire files the PVVNL application as part of the installation. **Can I install solar on a builder floor in Ghaziabad?** Yes, if you have the right to use the terrace in writing from the other floor owners, and the system is wired to your own PVVNL connection. The sanctioned load on your bill and the shadow-free area on the shared roof decide the size. A society's common-area plant is a separate route with its own subsidy. **How do I check any solar company in Ghaziabad before paying?** Eight checks: vendor registration for PVVNL, named panel and inverter models, cells on ALMM List-II, a specified structure, net metering inside the price, gross price and subsidy shown as separate lines, every warranty in writing, and a named after-sales contact. A blank on any line is the answer. **What happens at Verde Solaire's free site visit?** An engineer measures the shadow-free roof, reads the sanctioned load and consumption off your PVVNL bill, does a shadow analysis and confirms the size. You then receive a written quote naming every component. There is no obligation and no charge for the visit. --- # Solar installation company in Greater Noida Source: https://www.verdesolaire.com/solar-installation/greater-noida Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installs rooftop solar for homes, societies, schools and businesses across Greater Noida and Greater Noida West from its head office in Sector 47, Noida, about twenty minutes up the expressway. It is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, which means it can file your PM Surya Ghar: Muft Bijli Yojana application and claim the ₹78,000 central subsidy and the ₹30,000 per consumer, on top of the central subsidy on your behalf. The electricity board here is NPCL (Noida Power Company Limited), and the net-metering application to it is inside the price, not an extra. That is the short answer to "which solar company in Greater Noida". The rest of this page is written for the person who wants to check a company before paying an advance: the eight things worth asking any installer, how Verde Solaire answers each, what changes between an independent house, a builder floor and a society flat, the sectors covered, and what the company has already built in the city. ## Eight things to check in any installer, and our answers **1. Registration.** Under the scheme, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Ask for the vendor listing, then confirm it yourself on the portal. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) walks through the portal screens. **2. Named components.** A quote that says "Tier 1 panels" names nothing. Our quotes carry the make, model and wattage of the panels and the inverter. Published installations have used Adani and Vikram Solar modules with KSolare and Delta inverters; the company is certified by Vikram Solar as a trusted quality EPC integrator and an authorised solar solutions partner of Luminous. The [equipment section](/equipment) explains what those names mean. **3. ALMM and the Made-in-India rule.** For a subsidised system, both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on ALMM List-II. Ask which list entry the quoted module sits on. We only quote modules that qualify. **4. Structure.** Ask what the mounting structure is made of, how it is anchored to your roof, and what wind loading it is designed for. The survey engineer measures the parapet and slab before the quote, so the structure is designed for your roof rather than picked from a catalogue. **5. Net-metering filing inside the price.** Some quotes leave the NPCL application, the inspection and the meter to you. Ours does not. The published price for every capacity includes net metering, and the team follows the application through to activation, which is the part customers most often write about. **6. Subsidy timing.** Officially the subsidy is paid "within 30 days" of the claim; about 15 days on average. In practice it is 30–45 days after verification in practice. Any installer promising it faster is guessing; ask instead who files the claim and who chases it. We do both. **7. Warranty terms.** As published in July 2025, all three panel types the company supplies carry 25-year performance warranties on all three panel types. Ask for the manufacturer's warranty document, not a line on the quote, and ask separately about the inverter, because inverter warranties are shorter and vary by make. **8. After-sales.** Ask who you call when the inverter shows a fault in year four, and whether the company still has an office you can walk into. Verde Solaire has three offices, in Noida, New Delhi and Varanasi, and the head office in Sector 47 is the one that serves Greater Noida. The [warranty and after-sales page](/about/warranty-and-after-sales) sets out what is published and what is not. ## NPCL, not PVVNL: the board that matters here Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). The name printed on your bill decides which portal the application uses and which inspector visits. Under the state rules, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. That transformer limit is the reason a survey comes before a quote: a society with a heavily loaded transformer may be told a lower capacity than the roof could hold. On tariff, NPCL charges the same slab rates as the state DISCOMs with a 10% regulatory discount, so the saving per unit in Greater Noida is slightly smaller than in Noida for the same consumption, though the slabs themselves are the same. Verde Solaire's published planning figure for the net meter in Noida and Greater Noida is 20 to 30 days after installation, with your Aadhaar, electricity bill, ID proof and signature as the documents. The company's own record of a 10 kW Greater Noida installation in April 2023 notes that the electricity board installed the net meter quickly in that case. The stage-by-stage checklist is on the [Greater Noida net-metering page](/net-metering/greater-noida), and the NPCL detail is on the [NPCL board page](/net-metering/board/npcl). ## The subsidy in Greater Noida The central subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, capped at ₹78,000. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under the 2022 state solar policy. On a 3 kW system that is ₹1,08,000 in total, against a published price of ₹1,99,000 to ₹2,10,000, leaving ₹91,000 to ₹1,02,000 to pay. Larger systems get the same rupee amount, so the subsidy covers a smaller share of a 5 kW or 10 kW price. Eligibility is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The sizing guide published with the scheme is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. Full price tables for every capacity are on the [Greater Noida pricing page](/pricing/greater-noida), and the [solar calculator](/tools/solar-calculator) applies both subsidies to your bill. ## Independent houses, builder floors and society flats Greater Noida has three kinds of roof, and the paperwork differs for each. **Independent houses and villas** in the sector blocks and the gated villa projects are the simplest case. The owner holds the roof, the connection is in the owner's name, and a 3 kW to 10 kW system usually fits on the terrace with room left for a water tank. This is the case the scheme was designed for. **Builder floors** are common in the Alpha to Zeta blocks and across Greater Noida West. The roof right is the first question: it is usually written into the sale deed for the top floor, and sometimes shared. The second question is the sanctioned load on the individual connection, because the board will not approve a system larger than it. Bring the deed and the bill to the survey and both are settled in one visit. The [builder floor guide](/learn/solar-on-builder-floors-and-shared-roofs) covers the shared-roof arrangements that work. **Society flats** in the high-rise projects of Greater Noida West cannot usually take an individual system, because the flat has no roof of its own. The route is a common-area system through the RWA or the society, which the scheme supports at ₹18,000 per kW up to up to 500 kW (3 kW per house), EV charging included. That offsets the common-area bill for lifts, pumps and lighting, which in a large society is a substantial number. The [housing societies page](/solutions/housing-societies) explains how the society signs, who owns the plant and how the credit is shared. ## Areas served in Greater Noida As published in July 2025, Verde Solaire serves Pari Chowk, Alpha I and II, Beta I and II, Delta I, II and III, Gamma I, Zeta I and II, the Omicron sectors, and the societies and villas across Greater Noida West. The list is not a boundary: any address on an NPCL connection can be surveyed. The head office in Sector 47, Noida is the base for the survey and installation teams. ## What we have installed in and near the city The company's published projects in Greater Noida include a 10 kW rooftop system at a residence, installed in April 2023 and written up on the company's site, and a 35 kW system at a college, installed in 2019 and still running when its administrator wrote a review. Both are on the projects pages: the [10 kW Greater Noida residence](/projects/greater-noida-10-kw) and the [35 kW Greater Noida college](/projects/greater-noida-college-35-kw). Across the expressway in Noida, published reviews describe home systems from 4 kW to 20 kW, in Sectors 25, 41 and others. Home systems anywhere in the company's range of home systems from 1 kW to 50 kW are on the same process. Mr P. Sharma, writing about the college system, said the plant "is working very well and has resulted in huge savings in electricity bill to the college". The full set of reviews, unedited, is on the [reviews page](/reviews). ## How the process runs The process is the same one the company published for all residential work, and it does not start with a payment. 1. Evaluation and consultation 2. Site visit and proposal 3. Installation and documentation 4. Ongoing support Payment is staged against work done rather than paid in full up front; the exact milestones are in the written proposal. The company has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, and the PM Surya Ghar concessional loan is collateral-free, from nationalised banks at repo rate plus 0.5 percentage points over 10 years. The [EMI calculator](/tools/emi-calculator) shows what that looks like against your net price, and the [how we work page](/about/how-we-work) has the process in more detail. Before paying any installer an advance, read [before you pay the advance](/learn/before-you-pay-the-advance). ## Questions **Which solar company installs rooftop solar in Greater Noida?** Verde Solaire, an ISO 9001:2015 certified engineering and construction company with more than 50 MW delivered and a head office in Sector 47, Noida, installs home systems from 1 kW to 50 kW across Greater Noida and Greater Noida West. It is a registered PM Surya Ghar vendor in Uttar Pradesh. **Which electricity board handles net metering in Greater Noida?** Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited), not PVVNL, which serves Noida city. Check the name on your bill. Verde Solaire files the NPCL net-metering application as part of the installation. **How much subsidy do I get on solar in Greater Noida?** The central PM Surya Ghar subsidy is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, capped at ₹78,000. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000. A 3 kW system therefore attracts ₹1.08 lakh in total. September 2026 news reports confirm the state part is still being paid. **How long does NPCL take to install the net meter after the panels go up?** Verde Solaire's published planning figure for Noida and Greater Noida is 20 to 30 days after installation. The documents are your Aadhaar, electricity bill, ID proof and signature. **Does Verde Solaire charge for the site survey in Greater Noida?** No. The site evaluation is free and the proposal that follows it carries no obligation. **Can a flat in a Greater Noida society get solar?** A single flat rarely has its own roof right, so the usual route is a common-area system through the RWA or society, which PM Surya Ghar supports at ₹18,000 per kW up to 500 kW. An independent house or a builder floor with roof rights can apply as an individual household. --- # Solar installation company in Noida Source: https://www.verdesolaire.com/solar-installation/noida Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installs rooftop solar for homes, housing societies, offices and factories in Noida, from its head office at D-2, Sector 47. The company is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects with a team with combined experience of more than 2,000 MW, and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Home systems run from home systems from 1 kW to 50 kW. In Noida city the electricity board is PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company), and a subsidised home system receives the central subsidy of up to ₹78,000 plus the Uttar Pradesh state subsidy of up to ₹30,000 per consumer, on top of the central subsidy. This page is for someone comparing installers. It lists eight questions worth putting to any solar company in Noida and answers each for Verde Solaire from what the company has published. Prices are on the [Noida pricing page](/pricing/noida) and the PVVNL process is on the [Noida net-metering page](/net-metering/noida). ## What we install in Noida Verde Solaire, formerly Sirius Electric, has installed rooftop plants on houses, builder floors and apartment blocks in Noida, and publishes commercial installations up to commercial installations up to 16 MW. Most Noida homes take an on-grid system of 3 kW to 10 kW with net metering; a home that needs power through outages takes a hybrid system with a battery, covered under [off-grid and hybrid systems](/solutions/off-grid-hybrid). The company's July 2025 posts describe three panel types for homes, mono PERC for small or partly shaded roofs, bifacial for open terraces and TOPCon where long-term yield matters most, all carrying 25-year performance warranties on all three panel types. Published Noida and Delhi homes used Vikram Solar modules, with KSolare and Delta inverters elsewhere. Verde Solaire is an authorised solar solutions partner of Luminous and certified by Vikram Solar as a trusted quality EPC integrator. What the names mean for your roof is on the [solar panels page](/equipment/solar-panels). ## Eight things to check in any installer, and how we answer **1. Registration.** Under PM Surya Ghar: Muft Bijli Yojana, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is registered in Uttar Pradesh and Delhi. Open the vendor list on the portal for PVVNL and find the name before you pay anything. The [vendor verification guide](/learn/verify-your-pm-surya-ghar-vendor) shows where to look. **2. Named components.** A quote that says "Tier 1 panels" and "MPPT inverter" names nothing. Verde Solaire's written quote names the make and model of the panels, the inverter and the structure, and its published installations name Vikram Solar, Adani, KSolare, Delta and Havells, so each can be checked against the approved lists and the warranty document. **3. ALMM and the made-in-India rule.** For a subsidised system, both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on the ALMM List-II as well as the modules. The [ALMM List-II explainer](/learn/almm-list-ii-explained) covers the detail. **4. Structure.** The structure decides whether the panels survive a Noida dust storm and whether you keep the use of your terrace. Ask for the material, height and anchoring in writing. Verde Solaire's published Noida installations use elevated galvanised steel structures on concrete pedestals, as in the photograph above. **5. Net-metering filing inside the price.** Verde Solaire's published prices include net metering along with panels, inverter, mounting, installation and warranty, and the company files the PVVNL application, attends the inspection and follows the meter through to activation. A Sector 25 customer, Brij Lal Bhardwaj, wrote that the team did the complete installation including the documentation and the liaison for the net meter with the electricity department, and that the subsidy was processed for him as well. The July 2025 post gave 20 to 30 days after installation as the usual net-metering timeline. **6. Subsidy timing.** You pay the installer, and the government pays you. The official payout is "within 30 days" of the claim; about 15 days on average; in practice it is 30–45 days after verification in practice. Mr L. R. Singh, a 6 kW customer in Noida, wrote that he "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". **7. Warranty terms.** The panel performance warranty is the manufacturer's, and for the three panel types Verde Solaire published in 2025 it is 25-year performance warranties on all three panel types. The inverter and workmanship warranties belong in the written quote with the years stated, along with who you call when something fails. Our published position is on the [warranty and after-sales page](/about/warranty-and-after-sales). **8. After-sales.** Verde Solaire publishes full after-sales support with its installations. What the company has not published is a response time in hours, so ask for one in writing from any installer, including us. Cleaning and monitoring after commissioning are covered under [maintenance and cleaning](/solutions/maintenance-and-cleaning). ## Independent houses, builder floors and society flats An independent house is the simplest case. The owner, the roof and the electricity connection are in one name, which is what the scheme's eligibility rule assumes: an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The size follows the bill, using the published guide of 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. A builder floor works if you hold the right to use the roof and your own connection. The subsidy is paid per connection, so each floor with a separate PVVNL connection can apply on its own. Where the roof is shared, the owners need a written arrangement for the roof area before the survey, and the sanctioned load on your connection sets the largest system PVVNL will approve. The [builder floors and shared roofs guide](/learn/solar-on-builder-floors-and-shared-roofs) goes through the paperwork. A flat in a group housing society has no roof of its own. The route is the society's common-area plant under the same scheme, at ₹18,000 per kW for up to 500 kW (3 kW per house), EV charging included, which offsets the lift, pump and lighting bill that every resident pays through maintenance. Noida's group housing sectors are on the company's published service list, and the [housing societies page](/solutions/housing-societies) explains what the resident welfare association needs to resolve. ## Sectors and areas we serve The company's July 2025 post lists Sectors 15, 15A, 16, 18, 19, 46, 47, 50, 52, 62, 71, 78, 93B, 104, 137 and 151, and all other residential and group housing sectors of Noida. Published customer reviews add Sectors 25 and 41. The Sector 47 head office is the base for surveys across the city; the address is on the [offices page](/offices). Greater Noida and Greater Noida West are served from the same office but under a different electricity board, NPCL, with its own portal, so they have their own [installer page](/solar-installation/greater-noida) and [net-metering page](/net-metering/greater-noida). ## Installations in and around Noida Verde Solaire's published testimonials and project posts cover home systems in Noida from 4 kW to 20 kW: a 4 kW system at Sector 25, a 6 kW system, a 7 kW system at Sector 41, a [9 kW residence](/projects/noida-9-kw-residence) and a 20 kW residence whose owner came by recommendation from a friend with a Verde Solaire plant in New Delhi. Nearby, the company published a [10 kW plant in Greater Noida](/projects/greater-noida-10-kw) and a [35 kW system at a Greater Noida college](/projects/greater-noida-college-35-kw) installed in 2019 and, according to the college, still working well. The July 2025 post puts the company's residential experience at more than 100 rooftops. The reviews below are verbatim from the company's testimonials pages; the full set is on the [reviews page](/reviews) and every published plant is under [projects](/projects). ## How the process runs The company's own description of its process has three stages, none of which involves a payment before you have seen a written proposal. 1. **Evaluation and consultation.** A phone call to answer your questions and check whether the location suits solar. The evaluation is free: a free site evaluation and no-obligation proposal. 2. **Site visit and proposal.** An engineer visits, measures the shadow-free roof, reads the sanctioned load on the bill and returns a no-obligation proposal. The written quote names the make and model of every component and shows the gross price, the subsidy and the net payable as three separate lines. 3. **Installation and documentation.** Engineering, installation, the PVVNL inspection, the net meter and the commissioning certificate on the portal, followed by the subsidy claim. Payments follow milestones stated in the quote, typically at booking, on delivery of material and at commissioning; the exact split is in the written quote. Verde Solaire has not published a validity period for its quotes, so ask for one. How the work is organised is on [how we work](/about/how-we-work), and the [advance checklist](/learn/before-you-pay-the-advance) is the one-page version to keep beside any quote. ## Paying for it The scheme's concessional loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and helps prepare the application. The subsidy still comes to your bank account and can prepay the loan. The [solar loan page](/solar-loan) and the [EMI calculator](/tools/emi-calculator) take any rate and tenure. On savings, the company's published claim is that homeowners typically reduce their power bills by 60–90%; the figure for your home depends on your units and sanctioned load, and the fixed charge on a PVVNL bill does not go away. ## Questions **Is Verde Solaire a registered PM Surya Ghar vendor in Noida?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in both Uttar Pradesh and Delhi. You choose the vendor on pmsuryaghar.gov.in, so check the name on the portal's vendor list before you pay any advance. **Which electricity board handles net metering in Noida?** Noida city is served by PVVNL, a UPPCL company. Greater Noida and Greater Noida West are served by NPCL. The name printed on your electricity bill settles it; the two boards have different portals. **How much subsidy does a home in Noida get?** The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000 for 3 kW and above. Uttar Pradesh adds ₹15,000 per kW capped at ₹30,000, so a 3 kW system gets ₹1.08 lakh in total. **Does Verde Solaire's price include net metering?** Yes. The prices Verde Solaire published in July 2025 include panels, inverter, mounting structure, net metering, installation and warranty. The company files the PM Surya Ghar application and the PVVNL net-meter application and follows both through. **Which sectors of Noida does Verde Solaire serve?** As published in July 2025: Sectors 15, 15A, 16, 18, 19, 46, 47, 50, 52, 62, 71, 78, 93B, 104, 137 and 151, and all other residential and group housing sectors. The head office is in Sector 47. Greater Noida is covered from the same office but sits under NPCL. **Can I install rooftop solar on a builder floor in Noida?** Yes, if you have the right to use the roof and your own electricity connection. The subsidy is paid per connection, so each floor with its own PVVNL connection can apply. A shared roof needs a written agreement between the floor owners before the survey. **How long does the subsidy take to arrive in Noida?** Officially, within 30 days of the claim on the national portal. Trade and news reports put it at 30 to 45 days after the DISCOM verifies the plant. You pay the installer first and the government pays you by direct bank transfer. **Is the site survey free?** Yes. Verde Solaire publishes a free site evaluation and a no-obligation proposal. The written quote after the survey names the make and model of every component and shows gross price, subsidy and net payable separately. --- # Solar installed but not activated: what now Source: https://www.verdesolaire.com/learn/installed-but-not-activated Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A rooftop solar system that is installed but not activated is almost always waiting on the electricity board: the inspection, the net meter, or the commissioning certificate that follows them. In Delhi, the DERC net-metering guidelines amended on 16 July 2026 require the connection within 10 days for systems up to 10 kW and 25 days above that, with no application fee for domestic systems up to 10 kW. In Uttar Pradesh, timelines vary by board and the state does not fix a day count. Until the meter is fitted and the plant is commissioned, the usual practice is to keep the inverter switched off. A one-way meter does not credit what you export, so running the plant early earns nothing on the bill. ## What activation is waiting for Installation is the middle of the process, not the end. After the panels and inverter are up, the PM Surya Ghar: Muft Bijli Yojana portal still has four stages to pass through, and each belongs to a different party. 1. Plant details and the net-meter application 2. DISCOM inspection and meter 3. Commissioning certificate 4. Bank details and a cancelled cheque The net meter is what turns generation into money. Without it the board cannot see what you export, so no credit can appear on the bill and no commissioning certificate can be issued. Two Delhi rules shorten the front of the queue. Since the 2024 amendment, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. And since July 2026 the route is fixed: PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. If your application still shows the agreement stage weeks after the panels went up, the hold-up is usually the vendor, not the board; the [portal help page](/subsidy/portal-help) explains each status and who acts next. ## The official timelines, and the practical ones **Delhi.** The DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines, 2026 are the rule: connection within 10 days up to 10 kW, 25 days above, and no application fee for a domestic system up to 10 kW. They apply to BSES Rajdhani, BSES Yamuna and Tata Power-DDL alike. Before that amendment, Verde Solaire's own Delhi price post of 14 July 2025 said most net-metering approvals were completed in 20 to 30 days across the three boards. The regulator has now written a shorter clock than installers were planning on a year ago. **Uttar Pradesh.** under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering. No day count is published for the meter itself. The company's Noida and Greater Noida post of 10 July 2025 gave a planning figure of 20 to 30 days after installation, with Aadhaar, the electricity bill, an identity proof and a signature as the documents needed. Treat that as the installer's estimate, not a commitment by PVVNL or NPCL. The [Noida](/net-metering/noida), [Greater Noida](/net-metering/greater-noida), [Ghaziabad](/net-metering/ghaziabad) and [Varanasi](/net-metering/varanasi) guides have what is published for each board. ## What to check on the portal Log in to the national portal and read the stage your application is at; the stage tells you who owes the next action, as the list above shows. Note the date each stage was reached, because you will need it on any call. Then ask whether the vendor is the bottleneck. In August 2026 MNRE deactivated 66 PM Surya Ghar vendors over applications left pending, and advised vendors not to retain an application for more than 60 days without a valid reason. The [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows how to confirm yours is still registered. Applications also stall for ordinary reasons nobody has told the customer about: the name on the bill differs from the applicant's, the system is larger than the sanctioned load, the ownership proof is missing, or the plant details went up without the photographs the board wants. None of these is fatal. Each is a document, and the installer should know which one. ## Who to call In Delhi, start with the board that issues your bill. BSES Rajdhani customers use rts.bsesdelhi.com (helpline 19123, extension 3). BSES Yamuna is the same BSES Delhi portal family. Tata Power-DDL publishes the net-metering application and manual on tatapower-ddl.com. Have your consumer number, the portal application number, the installation date and the date the net-meter application went in. If the connection is past the guideline's days, say so and name the guideline and its date. In Uttar Pradesh, the licensee's name is printed at the top of the bill: PVVNL for Noida and Ghaziabad, NPCL for Greater Noida and Greater Noida West, PUVVNL for Varanasi. UPNEDA's district solar cells exist to help with net metering. There is no published helpline number for the Uttar Pradesh boards, so we do not print one here; the [board pages](/net-metering) list what is available for each board. Whichever board it is, tell your installer the same day; they are dealing with the same board on other applications. ## What your installer should be doing The net-metering work is part of the job you paid for. Verde Solaire's published prices include it, and the company's May 2025 guide to the application describes the vendor uploading the installation photograph and providing the net meter and safety certificate before the board's inspection visit. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Between installation and the meter, that means filing the application promptly, answering the board's queries, attending the inspection, and telling you where things stand without being asked. Customers describe that work in their own words. Mahender Nath Mishra, in Varanasi, wrote: "Special mention to Mr. Sachin Dubey of the firm who helped in all the processes including documentations for net metering." Brij Lal Bhardwaj, with a 4 kW system in Sector 25, Noida, wrote that the team did the complete installation, including the documentation and liaison with the board for the net meter, and got the subsidy processed. ## What customers say about the wait We would rather quote the delays than pretend they do not happen. Arun Sibal, whose New Delhi house is on BSES, wrote: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde. In fact Verde people always kept me in the loop regarding the net meter status." Navin Verma, in Janakpuri, New Delhi, wrote: "The installation of solar plant by Verde was of very good quality and their installation of solar system was also very quick. However the net metering process was delayed" by the electricity board, which he felt needed to look into it. It is not a residential problem only. Naresh Garg, writing about a 147 kW plant in Pune, said the meter "was delayed quite a lot in spite of all the documents being submitted by Verde and CPWD on time." Each one names the delay and where it sat. ## Our commitment We do not count a system as finished when the panels are up. We count it as finished when the net meter is in, the commissioning certificate is on the portal and the subsidy claim has gone in. Between those points we file, chase and report, and if the board is past its timeline we say so to the board. We do not print a response-time promise here, because none has been published; when one is, it will appear with a date. If your system was installed by us and is not yet activated, send the message below with your consumer number. If it was installed by someone else, send it anyway: we will tell you what the stage on your portal means and who owes the next step. ## Questions **How long does net metering take in Delhi?** Under the DERC net-metering guidelines amended on 16 July 2026, the connection is to be made within 10 days for systems up to 10 kW and within 25 days above 10 kW. Those are the rules; the days a particular board actually takes vary, and your installer should be chasing them. **Can I switch on my solar system before the net meter is installed?** The usual practice is to keep the inverter off until the board has fitted the net meter and the commissioning certificate is on the portal. A one-way meter does not credit what you export, so running the plant early earns you nothing on the bill. **Who do I call if BSES Rajdhani has not installed my net meter?** BSES Rajdhani's rooftop solar portal is rts.bsesdelhi.com and its helpline is 19123, extension 3. Keep your consumer number and the application number ready, and tell your installer the same day so they can follow it up with the board. **Is there a fee for the net-meter application in Delhi?** No. Since 16 July 2026 there is no application fee for domestic systems up to 10 kW under the DERC guidelines. **Can my installer hold my application on the portal?** They should not. In August 2026 MNRE deactivated 66 PM Surya Ghar vendors over pending applications and advised vendors not to retain an application for more than 60 days without a valid reason. If the portal shows a stage that depends on the vendor and nothing has moved for weeks, ask them in writing what is pending. **How long does net metering take in Noida and Ghaziabad?** The UPERC regulations of 2019 set the framework, but no day count is published for Uttar Pradesh. Verde Solaire's own July 2025 planning figure for Noida and Greater Noida was 20 to 30 days after installation; treat that as an installer's estimate, not a commitment by the board. **Will I still get the subsidy if activation is delayed?** Yes, but later. The subsidy claim follows the commissioning certificate, which follows the net meter, so a delay at the board postpones the transfer rather than cancelling it. The scheme's official end date is 31 March 2027, so leave room inside it. --- # Solar inverters: string, hybrid and sizing Source: https://www.verdesolaire.com/equipment/solar-inverters Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Almost every rooftop system in Delhi NCR needs one on-grid string inverter, rated close to the panel capacity, and it comes inside the system price: Verde Solaire's published range for 3 kW, ₹1,99,000 to ₹2,10,000, covers the panels, inverter, mounting, net metering, installation and warranty. A hybrid inverter is only for a home that wants backup during a power cut, and it needs a battery. Whichever it is, the quote names the make and model so that you can check it. The inverter is the one part of the system with a screen, and the part most likely to be replaced during the plant's life, so it deserves more attention than it usually gets. This page explains the three types, how Verde Solaire sizes them, the makes it has put on roofs, and what to ask before you sign. ## What the inverter does Panels produce direct current. The house and the grid run on alternating current at 50 Hz. The inverter converts one into the other, keeps the panels at the point where they give the most power as light and temperature change through the day, and watches the grid. If the grid's voltage or frequency drifts outside the inverter's limits, or the supply fails, an on-grid inverter disconnects by design, so that nothing is pushed into a line a lineman may be working on. That is why an on-grid system gives no backup in a power cut, which the [inverter-battery comparison](/learn/rooftop-solar-or-inverter-battery) covers. The inverter also keeps the generation log that every later question about output, export and faults comes back to; the [common problems page](/learn/common-problems-after-installing-rooftop-solar) shows how to read it. ## String, hybrid or micro **String inverter.** The panels are wired in series into strings, and the strings feed one wall-mounted unit. It is the simplest arrangement, the cheapest per kW and the easiest to service, and it is what nearly every home in Delhi, Noida, Ghaziabad and Varanasi gets. Both of Verde Solaire's published case studies use string inverters: three Delta 70 kW units on the [200 kW Jama Corporation plant in Kanpur](/projects/jama-corporation-kanpur-200-kw) and Schneider units on the [110 kW Marwar Carpets plant in Panipat](/projects/marwar-carpets-panipat-110-kw). Its weakness is shade: one shaded panel drags down the string it belongs to, which is why the shadow analysis on the survey comes before any sizing. **Hybrid inverter.** It does everything the string inverter does and also charges and discharges a battery, switching the wired backup circuits over when the grid fails. The inverter costs more, the battery costs more again, and the subsidy does not change, because it is calculated on solar capacity. The [inverter-battery page](/learn/rooftop-solar-or-inverter-battery) sets out when the extra is worth paying and the [off-grid and hybrid page](/solutions/off-grid-hybrid) covers the equipment. Batteries themselves are on the [solar batteries page](/equipment/solar-batteries). **Micro inverters.** A small inverter sits under each panel, so every panel works on its own: shade on one does not touch the rest, and monitoring is per panel. The price is that each kW costs more and there are many more units on the roof, in the sun, in Delhi's summer. None of the projects Verde Solaire has published uses micro inverters. They are quoted when a roof has partial shade that cannot be designed around. ## How Verde Solaire sizes the inverter These are Verde Solaire's working rules, not regulations, and the survey settles the model for your roof. - **AC rating at 80 to 100% of the panel capacity.** Panels in Delhi NCR seldom deliver their nameplate output at once, because of heat, dust and the angle of the sun, so an inverter rated a little below the array is fully used for most of the day. The Kanpur plant follows the same logic at scale: 200 kW of modules on three 70 kW inverters. A 3 kW home gets a 3 kW inverter; a 5 kW home gets a 5 kW inverter or one slightly smaller. - **Phase to match the connection.** A single-phase connection takes a single-phase inverter; a three-phase connection takes a three-phase inverter, which also spreads the output across the phases. The electricity board approves the inverter's rating in the net-metering application, so it is chosen against the connection on your bill as well as the panels. - **One tracker per roof face.** An inverter has one or more maximum power point trackers. A roof with panels facing two directions, or at two tilts, needs an inverter with at least two, so that each face is run at its own best point. - **String length from the inverter's voltage window.** The number of 530 to 545 Wp modules in a string is fixed by the inverter's DC input range, not by round numbers, and it is checked for the coldest winter morning and the hottest afternoon. - **A cool, shaded wall.** Over-temperature is one of the common fault codes on NCR roofs. The inverter goes on a wall out of the afternoon sun with space for air around it, never in a closed box. The [system size calculator](/tools/system-size-calculator) gives the array size from your bills; the inverter follows from it. ## Makes Verde Solaire has installed The company names its equipment on its project pages and its customers name it in their reviews, which is the only basis for this list. | Make | Where, as published | |---|---| | Delta | 200 kW Jama Corporation, Kanpur, three 70 kW string inverters; [147 kW C-MET, Pune](/projects/c-met-pune-147-kw) | | Schneider | 110 kW Marwar Carpets, Panipat, string inverters | | KSolare | [2 kW home in Varanasi](/projects/varanasi-2-kw-pm-surya-ghar) under PM Surya Ghar: Muft Bijli Yojana, with Adani 540 Wp panels; [10 kW home in Janakpuri, New Delhi](/projects/janakpuri-delhi-10-kw), with Vikram Solar panels | | Havells | [430 kW Jindal Prefab, Dharuhera](/projects/jindal-prefab-dharuhera-430-kw), with a 10-year warranty as published in March 2023 | Verde Solaire is also an authorised solar solutions partner of Luminous, announced on 25 March 2023; the [Luminous partner update](/updates/luminous-partner) has what that post said and did not say. Navin Verma, whose 10 kW Janakpuri system is in the table, wrote that he "used Vikram solar panels and KSolare inverters with an elevated module mounting structure" and that the installation "was of very good quality". There is no single best solar inverter in India, and this page will not name one. The right inverter is one whose maker has service in Delhi NCR, whose model is written on your quote, and whose warranty is in writing with the years and the name of who honours it. ## Monitoring Every current inverter logs its generation, and most send it to a phone app or a web portal through a Wi-Fi or GSM dongle. The log is the record you will need when the export is missing from a bill, when the generation seems low, or when a warranty claim is made, so settle four things before installation: that the monitoring hardware is inside the price, that the app is set up in your name before the installer leaves, that per-string readings are visible where the inverter supports them, and that the log shows generation since the commissioning date. Compare the monthly total with the figure for your city and size on the [solar calculator](/tools/solar-calculator) before deciding that anything is wrong. ## Warranty, and what to ask Three warranties sit on one system: the panel manufacturer's performance warranty, the inverter manufacturer's warranty, and the installer's own workmanship warranty. Verde Solaire's July 2025 price posts state 25-year performance warranties on all three panel types; that is the panel term, not the inverter's. The one inverter figure the company has published is the 10-year Havells warranty at Dharuhera. The years on the inverter in your own quote are set out in writing there, and the [warranty and after-sales page](/about/warranty-and-after-sales) explains how a claim is handled. Ask these before you sign, and expect the answers on paper: - The inverter's make, model and AC rating, next to the panel capacity. - Single-phase or three-phase, and whether it matches the connection on your bill. - The number of trackers, if the panels face more than one way. - Backup during a power cut: yes or no. If yes, the battery make, model and capacity. - Warranty years, and who you call for a claim. - Which monitoring app or portal, and who holds the login. - Where the inverter will be mounted, and whether the DC isolator and surge protection are inside the price. ## What an inverter costs Searches for a 5 kW solar inverter price, or an inverter price on its own, get one straight answer here: Verde Solaire publishes system prices, not component prices. The 5 kW range is ₹3,25,000 to ₹3,50,000 and includes the inverter with everything else. A replacement inverter outside warranty is quoted per site, because the model, the rating and the phase decide it. The [pricing pages](/pricing) carry every published range, and the [equipment section](/equipment) covers [panels](/equipment/solar-panels) and batteries in the same way. ## Questions **Which solar inverter is best for a home in Delhi or Noida?** For almost every home an on-grid string inverter rated close to the panel capacity, from a maker with service in Delhi NCR and a warranty in writing. A hybrid inverter is only worth its cost if you want backup during power cuts and are paying for a battery as well. **What size inverter does a 5 kW solar system need?** Verde Solaire's practice is an inverter with an AC rating of 80 to 100% of the panel capacity, so a 5 kW array gets a 5 kW inverter, or one slightly smaller, on a single-phase or three-phase model to match the connection. The exact model is fixed at the site survey and named in the quote. **What is the difference between a string inverter and a hybrid inverter?** A string inverter converts the panels' DC output to AC for the house and the grid, and shuts down when the grid fails. A hybrid inverter does the same and also charges and discharges a battery, so it can run selected circuits during a power cut. The hybrid costs more and needs a battery, which carries no subsidy. **Is the inverter included in the solar system price?** Yes. Verde Solaire's published July 2025 prices, ₹1,99,000 to ₹2,10,000 for 3 kW and ₹3,25,000 to ₹3,50,000 for 5 kW, include the panels, inverter, mounting structure, net metering, installation and warranty. The company does not publish a separate inverter price. **What warranty does a solar inverter carry?** It depends on the make and model, and the years are set out in the written quote. The one figure Verde Solaire has published is a 10-year warranty on the Havells inverters at its 430 kW Dharuhera plant. The 25-year figure on its price posts is the panel performance warranty, a different term. **Which inverter brands does Verde Solaire install?** Published projects name Delta (200 kW Kanpur, 147 kW Pune), Schneider (110 kW Panipat), KSolare (2 kW Varanasi, 10 kW Janakpuri) and Havells (430 kW Dharuhera), and the company announced in March 2023 that it is an authorised Luminous solar solutions partner. The make on your roof is named in your quote. **Does a solar inverter work during a power cut?** An on-grid inverter does not. It disconnects the moment the grid fails so that no power is fed into a line a lineman may be repairing, and restarts when supply returns. Backup needs a hybrid inverter with a battery, or the inverter battery you already own working alongside the solar system. --- # Solar loans and EMI in Delhi NCR Source: https://www.verdesolaire.com/solar-loan Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A rooftop solar loan under PM Surya Ghar: Muft Bijli Yojana is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which worked out to 5.75% on 28 July 2026, repayable over 10 years. On the mid-point of Verde Solaire's published 3 kW price for Noida after subsidy, that is an EMI of about a month, which is close to the electricity bill the system replaces. The rest of this page sets out what five nationalised banks state on their own pages, the documents they list, a worked EMI for 3 kW, and what Verde Solaire does in the application. ## The scheme loan, as the Ministry describes it The Ministry of New and Renewable Energy (MNRE) answered a question on this in the Rajya Sabha on 28 July 2026. The loan is collateral-free, from nationalised banks. The rate is repo rate plus 0.5 percentage points. The tenure is 10 years. Because the rate is linked to the repo rate, it floats: a change in the repo rate changes your EMI. Two older figures still circulate and confuse people. The February 2024 Cabinet note described a rate of around 7% (February 2024 figure, superseded), and the March 2025 backgrounder described a loan of up to ₹2 lakh at 6.75% (March 2025 figure, superseded). Both have been superseded. The current position is the repo-linked formula above, and the banks' own pages now describe a ceiling of for systems up to 10 kW, with the concessional rate applying to the first . ## What each bank states on its own page Rates and terms change; the bank's page on the day you apply is the one that counts. ### State Bank of India SBI's Surya Ghar page states two tiers. Up to : 5.75% a year (the page dates the rate to 15 December 2025), no minimum CIBIL score, no minimum income, and documents limited to KYC and a copy of the electricity bill. Above and up to : 7.90% a year, a minimum CIBIL score of 650, a minimum income of a year, and two years of ITR or Form 16 plus six months of salary statements. For both tiers the page states a maximum capacity of 10 kW, a margin of "minimum 10% of the project cost", "hypothecation of assets" as security, no processing fee, a maximum of 120 months including a six-month moratorium from disbursement, and that you must register on pmsuryaghar.gov.in first and then apply at jansamarth.in. ### Punjab National Bank PNB's rooftop solar scheme page states a maximum loan of for systems up to 3 kW and for systems above 3 kW up to 10 kW. The margin is 10% for loans up to and 20% above that. The tenure is a maximum of 10 years including a six-month moratorium, the processing fee is nil, and security is hypothecation of the equipment, with the third-party guarantee waived up to . The page asks for a CIC score of 680, a maximum applicant age of 75, and, for the larger loans, a minimum annual income of and a third-party guarantee. It states that all applications are sourced through the Jan Samarth portal. The page does not state an interest rate; check with the bank. ### Canara Bank Canara Bank publishes two pages for its CRTS-PMSGY product. Up to (including subsidy): margin "minimum 10% of total project cost", maximum 10 years, hypothecation of the equipment, service and other charges waived, a CIC score of 680 and above (or no credit history), and a self-declaration of income rather than income proof. Above and up to : margin 20%, no processing charges, a minimum annual income of , and income proof in the document list. Both pages ask for the latest electricity bill in the applicant's name, the technical feasibility report from the electricity board and a quotation from an empanelled vendor. Neither page states a rate; it refers to the bank's separate interest rate page, so check with the bank. ### Bank of Baroda Bank of Baroda's standalone PM Surya Ghar page states a rate "starting from 5.75%" for loans up to , and for larger loans a rate under its home loan scheme "starting from 7.90%, linked to CIBIL score". The maximum limit is , the tenure a maximum of 120 months, the margin 10% up to and 20% above it, and the processing fee nil irrespective of amount, with stamp duty as per the state. For loans up to the page states that no income document is required; the document list is KYC, the latest electricity bill and the digital approval letter issued through the Jan Samarth portal. ### Union Bank of India Union Bank's rooftop solar loan terms are found in the bank's retail lending rate sheet effective 24 July 2026. Section 10 lists the scheme loan up to at EBLR minus 2.25%, "presently 5.75%", and the loan above up to at EBLR plus 1.00% (9.00%) for a CIC score of 750 and above, or EBLR plus 1.50% (9.50%) below 750. Margin, tenure and documents are not on the rate sheet; check with the bank. Collateral-free, with the solar equipment hypothecated. A ceiling of for up to 10 kW. A concessional tier for the first with a 10% margin and light paperwork. A harder second tier above that with a 20% margin (SBI keeps 10%), income proof and a home-loan style rate. Ten years, including a six-month moratorium where stated. ## A worked EMI: 3 kW in Noida Verde Solaire's published price for a 3 kW system is ₹1,99,000 to ₹2,10,000, and after the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy the net cost in Noida is ₹91,000 to ₹1,02,000. The mid-point of that net range is , and the example below uses it. It is a mid-point, not a quote; the written quote after a survey is the price. - Borrow at 5.75% over 10 years: about a month, of interest over the term, repaid in total. - Bring the 10% margin the banks ask for and borrow : about a month. - If the bank prices you at the second-tier rate SBI states, 7.90%, the EMI on is about . Against that, a 3 kW system in Noida generates about 338 units a month. On the Uttar Pradesh domestic tariff, that much consumption costs more than the EMI at the concessional rate: the bill funds the loan. Two cautions. The fixed charge on your connection stays. And the subsidy arrives after commissioning, so in the early months you either fund the gross price or the bank lends against the subsidy and reduces the balance when it lands, as Canara Bank describes. The [EMI calculator](/tools/emi-calculator) takes any principal, rate and tenure and shows the EMI against your monthly saving. The [Noida pricing page](/pricing/noida) has the full price and subsidy table. ## Documents the banks list Across the five pages, the documents named for the concessional tier are: - KYC documents (identity and address). - The latest electricity bill, in the applicant's name. - The technical feasibility report from the electricity board (Canara Bank). - A quotation from an empanelled vendor (Canara Bank, Bank of Baroda). - The digital approval letter from the Jan Samarth portal (Bank of Baroda). - A self-declaration of income (Canara Bank). For the larger tier, SBI and Canara Bank add income proof: ITR or Form 16 for two years, six months of salary statements or bank statements, and a minimum annual income of . PNB adds a third-party guarantee at that level. Verde Solaire's own July 2025 post on Delhi prices described the loan under the scheme as needing "no income proof or ITR". That matches what SBI and Bank of Baroda state today for loans up to , and it does not apply above that amount. ## What Verde Solaire does in the application Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, as the company published in January 2024. In practice that means three things. We prepare the quotation in the form the bank and the portal want, naming the make and model of every component, because the banks ask for a quotation from an empanelled vendor and the electricity board's feasibility report. We file the PM Surya Ghar application and follow the feasibility approval, which the loan depends on. And we sit with you on the Jan Samarth application, since the bank pages route the loan through that portal. We do not lend, set the rate or decide the sanction; the bank does. We can tell you which tier your system falls in and what the bank will ask for before you apply, so the sanction is not held up by a missing document. The [before you pay the advance](/learn/before-you-pay-the-advance) checklist covers what to confirm with any installer, and [who pays whom](/subsidy/who-pays-whom) explains the order of payments between you, the bank, the installer and the subsidy. ## Loans for factories and small businesses The scheme loan is for households only; Bank of Baroda's page states that industrial, commercial and other consumers are not eligible. For a factory, Verde Solaire's 2023 posts described YES Bank's YES KIRAN programme for MSME manufacturers as a term loan of up to for six years with a six-month moratorium, for ground-mounted or rooftop plants for captive consumption. That was YES Bank's published description in 2023; ask the bank for its current terms. The company's tie-ups with SIDBI and other NBFCs also cover commercial plants. The [commercial payback model](/tools/commercial-payback) shows whether the saving covers the EMI at your tariff and load. ## Questions **What is the interest rate on a PM Surya Ghar solar loan?** Repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026 according to the Ministry's reply in the Rajya Sabha. It is a floating rate, so it moves with the repo rate. The 7% figure quoted in 2024 and the 6.75% figure from March 2025 are out of date. **How much can I borrow for rooftop solar?** SBI, PNB, Canara Bank and Bank of Baroda all state a maximum of ₹6 lakh for systems up to 10 kW. The concessional rate and the lighter paperwork apply to the first ₹2 lakh; above that the banks price the loan like a home loan and ask for income proof. **Is the solar loan collateral-free?** Yes. The Ministry describes the loan as collateral-free from nationalised banks, and the bank pages take only hypothecation of the solar equipment as security. PNB adds that a third-party guarantee is waived up to ₹2 lakh. **What would the EMI be on a 3 kW system in Noida?** Verde Solaire's published 3 kW price nets to ₹91,000 to ₹1,02,000 in Noida after subsidy. On the mid-point of ₹96,500, at 5.75% over 10 years, the EMI is about ₹1,059 a month. The system generates 360 to 400 units a month, so the EMI is close to the bill it replaces. **Do I need income proof or an ITR for a solar loan?** Not for the first ₹2 lakh at SBI or Bank of Baroda, whose pages state that no income document is required at that level. Above ₹2 lakh, SBI asks for two years of ITR or Form 16 and six months of salary statements, and a minimum income of ₹3 lakh a year. **Where do I apply for the loan?** Register on pmsuryaghar.gov.in first, then apply for the loan on the Jan Samarth portal (jansamarth.in). SBI and PNB both state that applications are sourced through Jan Samarth. Verde Solaire prepares the paperwork with you and works with SIDBI, SBI and other lenders. --- # Solar on builder floors and shared roofs Source: https://www.verdesolaire.com/learn/solar-on-builder-floors-and-shared-roofs Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A builder floor or a shared roof can carry rooftop solar in Delhi and Noida, and the subsidy applies to it. What decides the route is who holds the right to the terrace and whose electricity connection the panels feed: your own connection, the society's common-area connection, or, in Delhi since 20 January 2026, one plant on a common roof credited to several connections under virtual net metering. The central subsidy covers systems on a roof, terrace, balcony or elevated structure, and BSES Rajdhani's FAQ says installations under group and virtual net metering are eligible too. Terrace yours, or co-owners' consent in hand: your own connection. Roof common, and the society wants its common-area bill cut: the society's connection. Several flats want the credit on their own bills: virtual net metering, Delhi only for now. ## Who has the roof right, and who signs On a builder floor the terrace belongs to one floor or is shared by all of them, and the sale deed says which. If the terrace is yours alone, you sign everything. If it is common, every co-owner's written consent comes first: the structure stands on their share and the cable runs through the common stairwell. Net metering is applied for against an existing electricity connection only, so the applicant is the consumer named on the bill of the floor the panels feed. A tenant may apply subject to a no-objection certificate (NOC) from the owner, and a co-owner using a common terrace is in the same position: the board expects to see the owner's consent. Where neighbours cannot agree who gets the terrace, the FAQ offers a route rather than a refusal: both may jointly apply under virtual net metering, with a common roof and the credit shared in the proportion they decide. ## Sanctioned load on one floor Each floor has its own meter and its own sanctioned load, and the first fear is that a small load caps the solar size. In Delhi it does not. A consumer can install a solar system up to or beyond the sanctioned load; where the plant is larger, service line cum development charges under the DERC Supply Code apply. For small systems the 2024 amendment goes further: no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade. Size the system to your floor's consumption, not the building's; the [system size calculator](/tools/system-size-calculator) works from your own bill. ## Structure height and access A builder floor's terrace is a working space: water tanks, a staircase head, clotheslines. The FAQ answers the height question directly: the plant's height can be adjusted to the terrace height, and it can be raised above the water tank. A raised steel structure keeps the terrace usable underneath and lifts the panels clear of the tank's shadow. The space rule is 7 to 8 square metres, or 70 to 80 square feet, of shadow-free area per kWp, so about 240 to 300 square feet for 3 kWp. On a shared terrace that area has to be yours to use for the life of the system, and the cable route down to your floor needs the same consent as the roof. Assessing the roof structure for feasibility is the installer's job under the scheme, and Verde Solaire offers a free site evaluation and no-obligation proposal. ## Route 1: your own connection on your floor This is the standard PM Surya Ghar: Muft Bijli Yojana route. The system is wired to your meter, a net meter is installed, and the central subsidy is paid to your bank account: up to ₹78,000 for 3 kW or more, with Delhi's own subsidy and per-unit incentive on top, set out on the [Delhi subsidy page](/subsidy/delhi). No feasibility study is needed up to 10 kW on the same supply type. The price is the same as on an independent house: a 3 kW system was published at ₹1,99,000 to ₹2,10,000 in July 2025, which in Delhi nets to ₹43,000 to ₹54,000 after both subsidies. The [3 kW Delhi page](/pricing/delhi/3-kw) has the working and the [how to apply guide](/subsidy/how-to-apply) the nine portal steps. On a builder floor the only extra paperwork is the co-owners' consent for the terrace and, if you rent, the owner's NOC. ## Route 2: the society's common-area connection In a group housing society, or a building run by a residents' welfare association (RWA), the roof is common property and the association is the consumer. The plant feeds the common-area connection, so it is the lift, pump and lighting bill that falls, not your flat's. ## Route 3: Delhi virtual net metering, since 20 January 2026 Virtual net metering is the route for a shared roof where the flats want the benefit on their own bills. One plant is built on the common roof and its generation is credited to two or more connections in a proportion the participants agree, under an agreement or memorandum of understanding between them. Delhi has had guidelines for group and virtual net metering since 2019; the Seventh Amendment widened who may use them: the Seventh Amendment of 20 January 2026 opens virtual net metering to all Delhi consumers, with DISCOMs bearing line and network costs up to set caps. The waiver ends when each board's cap is reached, and the application form is each board's to publish; the [Delhi net-metering guide](/net-metering/delhi) will carry it. ## What the electricity board asks for on a shared roof BSES Rajdhani's list has no separate shared-roof document. At application: an online application on rts.bsesdelhi.com (helpline 19123, extension 3), the applicant's signature ID proof and scanned signatures. After installation: a single line diagram, the inverter's IEC certificates and data sheet, the net-metering connection agreement, a photograph of the earth leakage circuit breaker and geotagged photographs of the plant. At inspection: the inspection form and the serial numbers of the inverter and modules. The subsidy claim documents are on the [how to apply guide](/subsidy/how-to-apply). The shared-roof paperwork sits around that list: the owner's NOC where the applicant is a tenant, the participants' agreement or MoU under virtual net metering, and, for a society plant, the resolution naming the signatory. Keep the consent on file for as long as the plant stands. ## Noida, Greater Noida and Ghaziabad The three routes exist in Uttar Pradesh in the same shape, but the rules come from the state regulator rather than DERC: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The household state subsidy sits on top of the central one, on the [Uttar Pradesh subsidy page](/subsidy/uttar-pradesh). If your society wants one plant credited to several flats in Noida, ask your electricity board in writing before committing. The [Noida net-metering guide](/net-metering/noida) names the board and its process. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, and files the application with you in either state. ## Questions **Can I put solar panels on a builder floor in Delhi?** Yes. The system is wired to your floor's own electricity connection and the application goes through the PM Surya Ghar portal like any house. You need the right to use the terrace, in writing, from whoever owns or shares it. BSES Rajdhani's FAQ says a tenant needs an NOC from the owner; a co-owner of a shared terrace is in the same position. **Who signs the net-metering application on a shared roof?** The consumer whose electricity connection the panels feed. Net metering is applied for against an existing connection only. If two or more connections share one plant in Delhi, the participants sign an agreement or MoU and apply together under virtual net metering. **Does my sanctioned load limit the solar size on my floor?** Not strictly. BSES Rajdhani's FAQ says a consumer can install up to or beyond the sanctioned load; above it, service line cum development charges apply. For systems up to 10 kW in Delhi, the DISCOM itself handles the load increase under the 2024 DERC amendment. **What is virtual net metering in Delhi?** One solar plant on a common roof whose generation is credited to two or more electricity connections in a proportion the participants agree. The DERC amendment of 20 January 2026 opened it to all Delhi consumers, including single-point-of-supply connections, and the DISCOMs bear the service line and network cost until set capacity caps are reached. **Can a housing society get the subsidy for a common-area plant?** Yes. The central subsidy for group housing societies and RWAs is ₹18,000 per kW for common facilities, up to 500 kW at 3 kW per house, and Delhi adds ₹2,000 per kW up to 500 kW plus ₹2 per unit generated. It reduces the common-area bill, not your flat's bill. **Is there virtual net metering in Noida?** The rules in Uttar Pradesh differ from Delhi's DERC framework. In Uttar Pradesh a household chooses net or gross metering on its own connection, and the DISCOM allows capacity within transformer limits. Ask your electricity board in writing before planning a shared plant. --- # Solar panel cleaning and maintenance service Source: https://www.verdesolaire.com/solutions/maintenance-and-cleaning Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire washes solar panels and services rooftop systems in Delhi, Noida, Greater Noida, Ghaziabad and Varanasi, for plants it installed and for plants installed by others. Cleaning is offered as a single visit or on a schedule, and maintenance as an annual contract that adds a full check of the connections, earthing, inverter and structure. Both are quoted per site after a look at the roof, because the price depends on the number of panels, their height and whether there is water at roof level. Ask for a written site-specific estimate. The reason to care is the payback calculation. The panels Verde Solaire sells carry 25-year performance warranties on all three panel types, as published in its July 2025 price posts, and a performance warranty is a promise about output. Dust takes some of that output away every dry day. Every calculator on this site already takes 10% off the published generation figure for soiling and season; that is a planning assumption for Delhi NCR, not a measurement of any roof, and the point of a cleaning schedule is to keep the real loss under it. ## What takes the output down on a Delhi NCR roof Four things account for almost every drop in generation that is not the weather. **Dust.** October and November, when the air is still and the smog settles, and April to June, when the hot wind brings dust storms, are the two stretches when the film on the glass builds fastest. The monsoon rinses it off but leaves streaks where the water dries. The [seasonal generation guide](/learn/monsoon-and-dust-generation-ncr) goes through the year month by month. **Bird droppings.** A dropping shades one cell. That cell resists the current of the whole string and heats up. Wiped within the week, nothing happens; left for a season, it can mark the cell for good. **Shading that grew.** The shadow analysis done before installation is a snapshot. A neighbour's tree, a new overhead water tank or a creeper on the parapet can put a shadow across a row that was clear on the day of the survey. The annual visit repeats a version of that analysis. **Loose connections.** A DC connector or terminal that has worked loose does not show on the inverter display until it fails. It runs warm, wastes a little power, and is the most common cause of a fault in the first years. ## What a cleaning visit does A cleaning visit is plain water, a soft brush and a squeegee, done early in the morning or after sunset when the glass is cool and the system is making little. No detergent, no scouring pad and no pressure washer, because a manufacturer's care sheet excludes all three and a pressure jet can push water past the frame seals. The team works from the walkway or the terrace floor and never stands on a panel. Dried droppings are soaked and wiped, not scraped. Where the inverter keeps a log, the clear-day reading before and after the wash goes on the job sheet, so you can see what the dust was costing. The visit also reports what a wash reveals: cracked glass, a chewed cable, a discoloured connector, a nest under the array. How often is our recommendation, not a published fact: every two to three weeks from October to June, in the week after any dust storm, and once at the end of the monsoon to take the streaks off, with droppings wiped as soon as they appear. A house beside a construction site or a busy road needs the shorter interval. If you can reach every panel from the terrace without climbing, you can do this yourself, and the [maintenance guide](/learn/solar-panel-maintenance-and-cleaning) explains how. Panels on a raised structure, a sloped roof or a factory shed are a job for someone with a harness, which is where the service earns its fee. ## What the annual maintenance visit covers Cleaning keeps the light coming in; the annual visit keeps the electricity going out, and it is the part owners skip because nothing looks wrong. We recommend it in September or October, after the monsoon and before the dust. It covers: 1. **Connections.** A torque check on every DC and AC terminal in the junction boxes and at the inverter, and an inspection of each connector for heat marks, discolouration or water in the box. 2. **Inverter.** The fault log is read and cleared, the vents and fan are cleaned, firmware is updated where the maker has released one, and the year's generation is compared with what a system of that size should have produced. The [solar calculator](/tools/solar-calculator) gives the figure to compare against. 3. **Earthing.** Earth continuity of the structure and the inverter is measured, the earth pit is checked, and the lightning arrestor, where fitted, is inspected. 4. **Structure.** Bolts, clamps and module fixings are tightened, rust is treated, and the sealant at every roof penetration is checked so the terrace does not leak in July. 5. **Cables.** Insulation is checked for sun damage and rodent bites; loose ties and conduits are refitted. 6. **Under the panels.** Nests, droppings and leaves are cleared, and any gap birds are using is closed with mesh. 7. **The meter.** The net-meter reading is compared with the inverter's generation log, so a metering problem shows up as a mismatch rather than as a larger bill. Each visit ends with a short written report. A part or a repair outside the warranty is quoted separately. ## What is in writing, and what is not The two warranty figures Verde Solaire has published are the 25-year performance warranties on all three panel types in its July 2025 price posts and the 10-year warranty on the Havells inverters at its 430 kW factory plant at Dharuhera. Its July 2025 posts also list after-sales support with every installation. It has not published a workmanship warranty period, the inverter warranty on its home systems, the years of maintenance included with an installation, or a response time for service calls, so this page states none of them. Ask for each in the written quote; the [advance checklist](/learn/before-you-pay-the-advance) and the [warranty and after-sales page](/about/warranty-and-after-sales) list the questions to put to any installer. An annual maintenance contract, or AMC, should name the number of cleaning visits a year, what the annual check covers, what is charged separately, and how a fault call is handled. A contract that does not say how many visits you get is not a contract. The [common problems guide](/learn/common-problems-after-installing-rooftop-solar) describes what goes wrong on systems left without one. ## Delhi's zero-upfront scheme Households the new Delhi scheme covers are reported to get five years of vendor operation and maintenance. For everyone else, maintenance is either included in the installer's quote for a stated number of years or bought separately, and the quote should say which. ## Factory and institutional plants Large plants need cleaning designed in. Verde Solaire's 430 kW plant at Dharuhera was built with walkways and a module cleaning system, described on its [project page](/projects/jindal-prefab-dharuhera-430-kw). For a factory, school or society roof the contract is scoped with the plant, starting from a free site evaluation and no-obligation proposal. The [commercial and industrial page](/solutions/commercial-industrial) covers the tax and tariff side. ## What a well-kept system looks like nine years on Mr. S. C. Garg installed his system at his home in GK, New Delhi, when the company still traded as Sirius Electric, and wrote that "the solar system has been working continuously without a single day breakdown since 2017". One customer's experience is not a guarantee, and his panels will still have needed washing, but it is what a looked-after system does. On the service side, Mr. Sohail Dhir in New Delhi wrote that "Verde Solaire is very prompt in responding to queries if any". ## Questions **Does Verde Solaire clean solar panels?** Yes. Verde Solaire washes rooftop and factory solar plants in Delhi, Noida, Greater Noida, Ghaziabad and Varanasi, as a one-off visit or on a schedule, and services systems it did not install. Each job is quoted after a look at the roof, because the price depends on the number of panels, how high they sit and whether there is water at roof level. **How much does solar panel cleaning cost?** Verde Solaire has not published a rate card for cleaning or an annual maintenance contract, so this page does not state one. The quote names the number of visits a year, what each visit covers and what is charged separately. If you can reach the panels safely from the terrace floor, washing them yourself with plain water costs nothing. **What is a solar AMC?** An annual maintenance contract: a yearly agreement that bundles a set number of cleaning visits with one full check of the DC and AC connections, earthing, inverter, structure and cables, and a written report. Parts, bird mesh and repairs outside the warranty are usually charged separately, and the contract should say so. **How often should solar panels be cleaned in Delhi NCR?** Our recommendation, not a rule from any policy document: every two to three weeks in the dry months from October to June, in the week after any dust storm, and once at the end of the monsoon. Wipe bird droppings the same week you see them. **What does an annual solar maintenance check include?** A torque check on every DC and AC terminal, inspection of connectors and junction boxes for heat marks or water, a reading of the inverter's fault log and a comparison of its generation with what the system should have made, earth continuity and the earth pit, bolts and rust on the structure, sealant at roof penetrations, cable insulation, and the space under the panels. **Is maintenance included when Verde Solaire installs a system?** Verde Solaire's July 2025 price posts list after-sales support with every installation, but it has not published the number of years of maintenance included or a workmanship warranty period, so this page does not state either. Ask for both in the written quote before you pay an advance. **Do I need maintenance if the Delhi zero-upfront scheme covers my home?** The scheme approved by the Delhi Cabinet on 1 September 2026 is reported to include free operation and maintenance for five years for the households it covers, but the detailed rules have not yet been notified. Until they are, treat this as reported, not guaranteed. --- # Solar panel maintenance and cleaning in NCR Source: https://www.verdesolaire.com/learn/solar-panel-maintenance-and-cleaning Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A rooftop solar system in Delhi NCR needs two things from its owner: plain water on the glass every few weeks in the dry months, and one proper check a year of the connections, earthing, inverter and structure. There is nothing to oil and nothing to replace on a schedule, and the panels Verde Solaire sells carry 25-year performance warranties on all three panel types, as published in its July 2025 price posts. This page exists because dust is the one running cost a payback calculation has to carry. Every calculator on this site takes 10% off the published generation figure for soiling and season. That is a planning assumption, not a measurement of any particular roof, and the point of cleaning is to keep the real loss below it. ## What NCR dust does to output A panel makes electricity from the light that reaches its cells. A film of dust scatters and absorbs part of that light before it gets there, so the loss grows a little every dry day after the last wash and disappears with the next one. Two stretches of the year are the worst in Delhi NCR: October and November, when the air is still, there is no rain and the smog settles on every surface; and April to June, when the hot wind brings dust storms. In the monsoon, from late June to September, the rain does most of the washing, but it leaves streaks where the water dries and does nothing for bird droppings. Bird droppings are the one thing to deal with the same week. A dropping shades a single cell, the shaded cell resists the current of the whole string, and it heats up. Cleaned promptly, nothing happens. Left for a season, it can mark the cell. You can see the effect without instruments. Note the generation on a clear day from the inverter display or the app, wash the panels, and compare the next clear day. If the wash recovers a noticeable amount, you waited too long. The [monsoon and dust guide](/learn/monsoon-and-dust-generation-ncr) goes month by month through what to expect. ## How often to clean No policy document sets a frequency; what follows is a working routine for Delhi NCR, not a published fact. Rinse every two to three weeks from October to June, and always in the week after a dust storm. Leave the monsoon largely to the rain, and rinse once at its end to take the streaks off. Wipe bird droppings as soon as you see them. A house beside a construction site, a busy road or open farmland needs the shorter interval; a roof well above the traffic can stretch it. ## How to clean safely Clean early in the morning or after sunset, when the glass is cool and the system is making little or nothing. Cold water on hot glass stresses it, and a panel at midday in May is hot enough to matter. - Use plain water from a hose or a bucket. Low pressure is enough. A pressure washer can force water past the frame seals and is the first thing a manufacturer's care sheet rules out. - Loosen dirt with a soft sponge, a microfibre cloth or a long-handled soft brush. No detergent, no scouring pad, no metal, and no scraping at a dried dropping: soak it and wipe. - Hard water leaves mineral marks when it dries. Rinse, then pull a squeegee or a clean cloth across the glass while it is still wet. - Never stand, kneel or lean on a panel, and never step on the frames. Reach from the walkway, the terrace floor or a stable ladder placed on the roof, not on the array. - Do not pull on cables or connectors. If you find cracked glass, a chewed cable, a loose connector or a burn mark, stop and call the installer. Those are not cleaning jobs. Call a professional when the array is out of easy reach. Many Delhi NCR homes mount the panels on a raised steel structure above the terrace so the roof stays usable, which puts the glass above head height and the far rows beyond arm's reach. Sloped roofs, tin sheds and anything you would have to climb onto belong to someone with a harness. So do pigeon nests under the panels, which return unless the gap is closed with mesh, and larger plants: Verde Solaire's 430 kW factory plant at Dharuhera was built with walkways and a module cleaning system for exactly this reason. The [maintenance and cleaning service](/solutions/maintenance-and-cleaning) page describes what Verde Solaire offers for homes and businesses. ## The annual check Cleaning keeps the light coming in. The annual check keeps the electricity going out, and it is the part owners skip because nothing looks wrong. Have it done once a year, ideally in September or October after the monsoon and before the dry season, and ask for a short written report. It should cover: 1. **DC and AC connections.** Every connector and terminal in the DC box, the AC box and the inverter is checked for tightness, and the boxes are inspected for discolouration, burn marks or water. A loose DC connector is the most common cause of a fault after installation. 2. **Earthing.** The earth continuity of the structure and the inverter is measured and the earth pit is checked. Lightning arrestors, where fitted, are inspected. 3. **Inverter.** The fault log is read, the vents and fan are cleared of dust, the firmware is updated where the maker has released one, and the year's generation is compared with what a system of that size should have produced. The [solar calculator](/tools/solar-calculator) gives the figure to compare against. 4. **Structure and fixings.** Bolts, clamps and the fixing of the modules to the rails are checked, rust on the structure is treated, and the sealant at every roof penetration is inspected so the terrace does not leak in July. 5. **Cables.** Insulation is checked for sun damage and rodent bites, and cable ties and conduits that have worked loose are refitted. 6. **Under the panels.** Nests, droppings, leaves and anything else that has collected between the panels and the roof are cleared, and any gap the birds are using is closed. 7. **The meter.** The net-meter readings are compared with the inverter's generation log, so that a metering problem shows up as a mismatch rather than as a larger bill. Delhi's new zero-upfront scheme is reported to include five years of vendor operation and maintenance for the households it covers. For everyone else, maintenance is either included in the installer's quote for a stated number of years or bought separately. Ask which, and get the years in writing. ## Warranties: what is written down The warranty that matters most is the one on the panels, because they are most of the cost and all of the generation. Verde Solaire's July 2025 price posts state 25-year performance warranties on all three panel types: mono PERC, bifacial and TOPCon. A performance warranty is a promise about output: the manufacturer guarantees that the panel will still produce at least a stated share of its rated power at year 25. It is separate from the product warranty against defects in the glass, frame and junction box, which is usually shorter, and a quote should state both. Inverter warranties vary by make and model, and the inverter is the component most likely to be replaced once in the life of the panels. The one figure Verde Solaire has published is for a commercial plant: the Havells inverters on the 430 kW Dharuhera installation carried a 10-year warranty. Ask for the make, the model and the warranty years of the inverter in your own quote; the [inverter guide](/equipment/solar-inverters) explains what to look for. Verde Solaire has not published a workmanship warranty period or the number of years of maintenance included with a home installation, so this page does not state one. Ask for both in writing before you pay an advance; the [warranty and after-sales page](/about/warranty-and-after-sales) and the [advance checklist](/learn/before-you-pay-the-advance) list the questions to put. Cleaning with water and soft tools does not affect any of these warranties. Abrasives, detergents and pressure washers can, because the manufacturer's care instructions exclude them. ## How long the panels last The performance warranty runs 25 years, and the panels do not stop at the end of it; they keep generating at a lower output. The 25-year projections on this site assume that output falls by 0.7% a year, which is a planning assumption rather than a measurement, and on that assumption a panel is still producing more than four-fifths of its first-year output in year 25. What that looks like on a roof: Mr. S. C. Garg installed his system at his home in GK, New Delhi, when the company still traded as Sirius Electric, and wrote on Verde Solaire's testimonials page that "the solar system has been working continuously without a single day breakdown since 2017" and that "The solar plant installed at my place is maintenance free". One customer's experience is not a guarantee, and his panels will still have needed washing. It is, though, what a well-installed system looks like nine years on. ## Questions **How often should solar panels be cleaned in Delhi NCR?** Every two to three weeks in the dry months from October to June, always in the week after a dust storm, and once at the end of the monsoon. Wipe bird droppings the same week. This is a working routine for Delhi NCR dust, not a rule from any policy document. **Can I clean solar panels myself?** Yes, if you can reach them from the terrace floor or a walkway without standing on the panels. Use plain water and a soft sponge or brush early in the morning, with no detergent and no pressure washer. Panels on a raised structure or a sloped roof are a job for a professional. **Do solar panels in Delhi lose much output to dust?** The loss grows every dry day after the last wash and is worst in October and November and during the dust storms of April to June. This site's calculators take 10% off the published generation for soiling and season as a planning assumption; regular washing keeps the real loss below that. **How long do solar panels last?** The panels Verde Solaire published in July 2025 carry a 25-year performance warranty, and they keep generating past it at a lower output. This site's projections assume output falls by 0.7% a year. One Verde Solaire customer in New Delhi reports a system running without a breakdown since 2017. **What should an annual solar maintenance check include?** The tightness and condition of every DC and AC connection, earth continuity, the inverter's fault log and vents, the structure's bolts and any rust, cable insulation, nests and debris under the panels, and a comparison of the net-meter reading with the inverter's generation log. **Does cleaning solar panels affect the warranty?** Not when it is done with water and soft tools. Abrasives, detergents and pressure washers can, because manufacturers' care instructions exclude them. **What warranty does a solar inverter have?** It varies by make and model. The one figure Verde Solaire has published is a 10-year warranty on the Havells inverters at its 430 kW Dharuhera plant. Ask for the make, the model and the warranty years in your own quote. --- # Solar panel myths: cost, batteries, monsoon Source: https://www.verdesolaire.com/learn/solar-myths Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) What stops a Delhi or Noida homeowner going solar is usually a belief that was once true, or never was. A 3 kW rooftop system is ₹1,99,000 to ₹2,10,000 on Verde Solaire's published July 2025 list and ₹91,000 to ₹1,02,000 after the central and state subsidy; GST is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%); an on-grid system needs no battery; and panels keep generating through the monsoon at reduced output. Eight myths follow, each with the fact and its source. Verde Solaire published a first version of this page in May 2025. The information has been updated to reflect current policy. ## Myth: solar panels are too expensive **Fact.** The published price of a 3 kW on-grid system is ₹1,99,000 to ₹2,10,000, including panels, inverter, structure, net metering, installation and warranty. The PM Surya Ghar: Muft Bijli Yojana pays ₹78,000 on a 3 kW home system, and the state adds ₹30,000 per consumer, on top of the central subsidy in Uttar Pradesh or up to ₹78,000 in Delhi. The net payable is ₹91,000 to ₹1,02,000 in Noida, Ghaziabad or Varanasi and ₹43,000 to ₹54,000 in Delhi. The subsidy goes to an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. If that is still too much at once, the scheme's loan is collateral-free, from nationalised banks, at 5.75% on 28 July 2026, over 10 years. The 2025 page put payback at three to five years; the calculator below works it out for your own roof. Two caveats. The prices are July 2025 ranges; the written quote is the price. And you pay the installer in full; the subsidy reaches your bank account after commissioning, "within 30 days" of the claim; about 15 days on average. Every size and city is on the [pricing pages](/pricing). ## Myth: the subsidy is paid per kW, whatever the size **Fact.** The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, and nothing beyond that. So ₹78,000 is a cap, not a rate: a 5 kW or 10 kW home receives the same as a 3 kW one. The state top-ups are per kW but capped too. Uttar Pradesh pays ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy; Delhi pays ₹26,000 per kW, capped at up to ₹78,000. This is why the net cost per kW climbs above 3 kW, and why the scheme's sizing guide reads 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. The [subsidy guide](/subsidy) has the full ladder; the [3 kW versus 5 kW guide](/learn/3-kw-vs-5-kw) does the comparison. ## Myth: PM Surya Ghar gives 300 free units a month **Fact.** There is no free-units allowance. The 300 units in the scheme's publicity is what the Centre expects a roughly 3 kW system to generate in a month; the electricity is yours because your roof made it. On the published planning yield a 3 kW system in Noida generates about 338 units a month. The confusion comes from Delhi, where a separate state subsidy gives 0–200 units a month free; 201–400 units at 50% off, capped at ₹800 a month; you must opt in. It exists whether or not you have solar, and once you do, it is worked out on net units, that is import minus export. Neither scheme is "300 free units". ## Myth: GST on solar panels is 12% **Fact.** Since 22 September 2025, GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). A quote dated after that which still applies the old 12% should be reissued before you compare it with anyone else's. ## Myth: solar does not work in cloudy weather, the monsoon or winter **Fact.** Panels generate from daylight, not heat, so an overcast day still produces, just less. Output is lower in the monsoon and on short winter days, higher in the clear months before the rains, and net metering carries the surplus forward, so the annual total is what your bill sees. In Delhi, credits roll over month to month, and any surplus left at the end of the financial year is paid at the DISCOM's average power purchase cost. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. The planning figures on this site already allow for the weather. Verde Solaire's published yield is 1,450 units per kW a year in Delhi and 1,500 in Noida, and every calculator here takes a further 10% off for dust and the monsoon, a planning assumption printed under every result. The [monsoon and dust guide](/learn/monsoon-and-dust-generation-ncr) goes month by month. ## Myth: you need a battery **Fact.** An on-grid system, which is what the subsidy is built around, uses the grid as its store: surplus goes out through the net meter by day, you draw from the grid at night, and the meter nets the two. The 2025 page said the same: batteries are for off-grid sites without a reliable supply. What a battery gives you is backup during a power cut. An on-grid inverter switches off when the grid fails, by design, so it never feeds a line someone is repairing. For lights and a fan through an outage you need a hybrid system with a battery, at a higher price, and the battery will not last as long as the panels. [Rooftop solar or an inverter battery](/learn/rooftop-solar-or-inverter-battery) compares the two; the [off-grid and hybrid page](/solutions/off-grid-hybrid) covers sites where the grid itself is the problem. ## Myth: maintenance is a headache **Fact.** A rooftop system has no moving parts. The routine is cleaning the panels and glancing at the inverter display or app. The 2025 page put cleaning at once or twice a month, more often in the dusty months and less in the monsoon. The company's July 2025 price lists carried 25-year performance warranties on all three panel types. One New Delhi customer, Mr. S. C. Garg, whose system went in when the company traded as Sirius Electric, wrote that "the solar system has been working continuously without a single day breakdown since 2017". That is one roof, not a guarantee. A system needs a little attention, not none: dust, bird droppings and a tripped breaker are not warranty matters. The [maintenance and cleaning guide](/learn/solar-panel-maintenance-and-cleaning) lists what after-sales cover to ask for in the quote. ## Myth: the savings are small The opposite myth is "zero bill". The fixed charge stays, ₹110 per kW per month in Uttar Pradesh and a per-kW charge on the sanctioned load in Delhi, plus whatever the system did not cover. The 2025 page carried a worked bill example; this one does not, because the answer depends on your slab, board and sanctioned load, which the [bill calculator](/tools/electricity-bill-calculator) applies for you. ## The real disadvantages A page that only busts myths is a sales page. These are true. - **Roof.** About 300 to 350 square feet of shadow-free roof for 3 kW, as published, and the right to use it; see the [shared-roof guide](/learn/solar-on-builder-floors-and-shared-roofs) for builder floors. - **Power cuts.** An on-grid system switches off with the grid. Backup costs extra. - **Cash flow.** You pay the installer first; the subsidy follows, "within 30 days" of the claim; about 15 days on average. - **The board's timeline.** The net meter is the electricity board's job. Arun Sibal wrote that "The only issue was the time taken in installing the net meter from BSES". Delhi's deadline is now 10 days up to 10 kW. - **Equipment rules.** For a subsidised system, both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on the ALMM List-II. - **The clock.** The scheme runs until 31 March 2027. ## Why the myths persist The rules moved: GST in September 2025, Delhi's subsidy in July 2025 and again on 1 September 2026, ALMM List-II in June 2026, and the loan rate in July 2026. Check the date and source behind any figure before you use it. Our [sources page](/sources) lists the current policy documents. ## Questions **Do solar panels work in the monsoon in Delhi and Noida?** Yes, at lower output. Panels generate from daylight, so an overcast day still produces, and net metering carries the surplus from the clear months forward, so the annual total is what your bill sees. Verde Solaire's calculators take 10% off the published yield for dust and monsoon. **Is the PM Surya Ghar subsidy ₹78,000 per kW?** No. ₹78,000 is the total cap: ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third kW. A 5 kW or 10 kW home system receives the same ₹78,000 as a 3 kW one. **Does PM Surya Ghar give 300 free units of electricity?** No. There is no free-units allowance. 300 units is what the scheme expects a roughly 3 kW system to generate each month. Delhi's 0 to 200 free units are a separate state subsidy you opt into, worked out on net units once you have solar. **What is the GST on rooftop solar in 2026?** Since 22 September 2025, about 8.9% on a complete rooftop plant: 5% on the panels and inverter, which count as 70% of the contract value, and 18% on the remaining 30% for other material and installation. The old 12% rate, and the effective rates built on it, are out of date. **Do I need a battery with rooftop solar?** Not for an on-grid system, which exports surplus through the net meter by day and draws from the grid at night. A battery is only needed if you want backup during a power cut, which means a hybrid system at a higher price. **What are the real disadvantages of rooftop solar?** You need about 300 to 350 square feet of shadow-free roof for 3 kW and the right to use it; an on-grid system switches off in a power cut; output is lower in the monsoon and winter; the fixed charge on the bill stays; you pay the installer first and the subsidy arrives afterwards; and the net-meter timeline depends on your electricity board. **How much does a 3 kW solar system cost after subsidy?** On Verde Solaire's published July 2025 range of ₹1,99,000 to ₹2,10,000, a 3 kW system nets to ₹43,000 to ₹54,000 in Delhi after the ₹78,000 central subsidy and the ₹78,000 Delhi state subsidy, and to ₹91,000 to ₹1,02,000 in Uttar Pradesh after the ₹78,000 central subsidy and the ₹30,000 state subsidy. --- # Solar panel price in Greater Noida, 1–10 kW Source: https://www.verdesolaire.com/pricing/greater-noida Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) For a Greater Noida home using two or three air conditioners through summer, 3 kW is often the right place to start. It produces about about 338 units a month a month on the planning assumptions used here and typically pays back in four to five years on NPCL’s tariff. The published price is ₹1,99,000 to ₹2,10,000. After the central and Uttar Pradesh subsidy, the estimated amount is ₹91,000 to ₹1,02,000. The price is the same as in Noida city, but the process is different: Greater Noida and Greater Noida West are served by NPCL. Use the table below to compare system sizes and the NPCL guidance before you request a quote. ## The price table for Greater Noida | System | Published price | Central subsidy | State subsidy | Net payable | |---|---|---|---|---| | 1 kW | ₹70,000–₹80,000 | ₹30,000 | ₹15,000 | ₹25,000–₹35,000 | | 2 kW | ₹1,35,000–₹1,50,000 | ₹60,000 | ₹30,000 | ₹45,000–₹60,000 | | 3 kW | ₹1,99,000–₹2,10,000 | ₹78,000 | ₹30,000 | ₹91,000–₹1,02,000 | | 5 kW | ₹3,25,000–₹3,50,000 | ₹78,000 | ₹30,000 | ₹2,17,000–₹2,42,000 | | 10 kW | on request | ₹78,000 | ₹30,000 | quote-based | Each published price covers panels, inverter, mounting structure, net-metering work, installation and warranty. The central subsidy pays ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, so it reaches ₹78,000 at 3 kW and stays there for anything larger. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under its Solar Energy Policy 2022. The two are paid on top of each other, not instead of each other; the [Uttar Pradesh subsidy page](/subsidy/uttar-pradesh) has the paperwork. The 10 kW row reads "quoted per site" because a system of that size is priced after the roof survey. The structure, the cable run to the meter room and the inverter configuration vary more from house to house than they do at 3 kW. The subsidy on it is still ₹78,000 plus ₹30,000 per consumer, on top of the central subsidy; on a Greater Noida villa a system that large is justified by consumption, never by subsidy. ## Same price list as Noida, different electricity board Verde Solaire's July 2025 post priced Noida and Greater Noida together, from its head office in Sector 47, Noida, and the ladder above is that list. Three things change once you cross into NPCL's area. The tariff slabs are the state's, but NPCL applies a regulatory discount to them, which makes each unit you displace worth a little less. The net-metering application goes through NPCL's own portal rather than a UPPCL one. And the inspection before the meter is fitted is NPCL's, because the inspecting body under the scheme is the DISCOM. None of this changes the subsidy, which is a central and state matter and does not depend on the board. If your bill says PVVNL (Paschimanchal Vidyut Vitran Nigam Limited), you are in Noida city and the [Noida pricing page](/pricing/noida) is the one to read. Choose the board printed on the bill before starting an application. ## 3 kW or 5 kW The subsidy formula is 60% of the benchmark cost for the first 2 kW and 40% for the part between 2 and 3 kW, capped at 3 kW, so it stops growing at 3 kW. On a 3 kW system the combined ₹1,08,000 covers about half of the published price. On 5 kW the same rupee amount sits against ₹3,25,000 to ₹3,50,000, leaving ₹2,17,000 to ₹2,42,000 to pay, and the cost per kW you fund yourself roughly doubles. That is not an argument against 5 kW; it is an argument for sizing to consumption. The published guide is 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW, and the honest way to apply it is to average twelve months of bills rather than the summer ones. Independent houses and villas in Greater Noida can sit above 400 units a month once two or three air conditioners run, and for those homes 5 kW pays back on its own arithmetic. The [3 kW versus 5 kW guide](/learn/3-kw-vs-5-kw) and the [system size calculator](/tools/system-size-calculator) work through it for your bills. ## Net metering in Greater Noida: NPCL The distributor for Greater Noida and Greater Noida West is NPCL (Noida Power Company Limited). The rules are set by the Uttar Pradesh Electricity Regulatory Commission (UPERC), not by NPCL: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net metering is the usual choice for a house, since the units you export at midday are set against the units you import at night. Surplus injected into the grid is compensated at the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). The application itself is made on NPCL's portal. What Verde Solaire does is register you on the PM Surya Ghar national portal, file the NPCL application, attend the inspection, and follow the meter through to the day it is energised and the subsidy claim can go in. The company's own planning figure for the net-metering stage in Noida and Greater Noida is 20 to 30 days after installation, with Aadhaar, the electricity bill, an identity proof and a signature as the documents needed; this is the installer's estimate, not a commitment by the board. The [Greater Noida net-metering guide](/net-metering/greater-noida) and the [NPCL board page](/net-metering/board/npcl) list what to check at each stage. There is a published example from this side of the expressway. In April 2023 Verde Solaire installed a 10 kW plant on a Greater Noida rooftop and wrote at the time that the DISCOM fitted the net meter very quickly. ## What the electricity bill does after solar Uttar Pradesh urban domestic tariffs for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit. In Greater Noida, NPCL charges the same slab rates as the state DISCOMs with a 10% regulatory discount. Take a house using 400 units a month. Without solar it is billed through three slabs plus a fixed charge of ₹110 per kW per month on the sanctioned load. With a 3 kW system producing about 338 units a month, most of those units are netted off before they are billed, and what remains is the fixed charge, the small balance of units the system did not cover, and the taxes and duties this site does not model. The fixed charge is why the bill never reaches zero, and any page that promises a nil bill is skipping it. The [bill calculator](/tools/electricity-bill-calculator) does the slab arithmetic for your own units and load. The NPCL discount has two consequences. Your bill before solar is a little lower than a PVVNL customer's for the same consumption, and so is the saving after solar, so the payback is a few months longer in Greater Noida than in Noida city for an identical system. The calculator at the foot of this page uses the state slab rates, and therefore slightly overstates the saving for an NPCL consumer. ## Paying for it: cash, loan or EMI The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which came to 5.75% on 28 July 2026, repaid over 10 years. Financing the whole 3 kW net price at that rate gives an equated monthly instalment (EMI) in the same region as the monthly saving, which is what the scheme was designed to do; the [EMI calculator](/tools/emi-calculator) lets you test any rate and tenure. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, and prepares the paperwork with you. The [solar loan page](/solar-loan) carries the current terms. ## Equipment and compliance For a subsidised system, both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on the ALMM List-II, the Ministry of New and Renewable Energy's Approved List of Models and Manufacturers for cells. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%). Verde Solaire's July 2025 post for Noida and Greater Noida describes three panel types, mono PERC, bifacial and TOPCon, with 25-year performance warranties on all three panel types. Its published home installations in Delhi, Noida and Varanasi used Adani and Vikram modules with KSolare inverters. Every quote names the make and model, so you can check them against the approved lists before you pay an advance; [panels, inverters and batteries](/equipment) explains what those names mean. The scheme's official end date is 31 March 2027, so leave room inside it for the survey, the application and the inspection. ## Where we have installed in Greater Noida Verde Solaire's published service list for Greater Noida, from July 2025, names Pari Chowk, the Alpha, Beta, Delta, Gamma, Zeta and Omicron sectors, and societies and villas across Greater Noida West. An independent house in the lettered sectors is the simplest roof. A villa inside a gated society may need the society's consent for the roof and cable route; a flat in a tower is a [housing-society project](/solutions/housing-societies) rather than an individual one. The [installation page for Greater Noida](/solar-installation/greater-noida) describes the survey and what a roof needs to pass it. The company is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, and offers a free site evaluation and no-obligation proposal. The Greater Noida installation on the company's testimonials page is a 35 kW system at a college, installed in 2019. Mr. P. Sharma wrote that it "is working very well and has resulted in huge savings in electricity bill to the college". That project has its own page at [Greater Noida college, 35 kW](/projects/greater-noida-college-35-kw), and the rooftop pictured above at [Greater Noida, 10 kW](/projects/greater-noida-10-kw). ## Questions **How much does a 3 kW solar system cost in Greater Noida after subsidy?** On Verde Solaire's published July 2025 range of ₹1,99,000 to ₹2,10,000, a 3 kW system in Greater Noida nets to ₹91,000 to ₹1,02,000 after the ₹78,000 central subsidy and the ₹30,000 Uttar Pradesh subsidy. The price list is the same as for Noida city. **Which electricity board handles net metering in Greater Noida?** Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Noida city is served by PVVNL, a UPPCL company. The name printed on your electricity bill settles which portal your application goes through. **Is electricity cheaper under NPCL than in Noida?** NPCL charges the same Uttar Pradesh domestic slab rates as the state distributors, with a reported 10% regulatory discount, plus a fixed charge of ₹110 per kW per month. A slightly lower bill means a slightly smaller saving from solar, so payback in Greater Noida runs a few months longer than in Noida city for the same system. **How many units will a 3 kW system generate in Greater Noida?** This site's planning figure is about 338 units a month, from 1,500 units per kW per year with a 10% derate for dust and monsoon. Verde Solaire's published figure for the region is 360 to 400 units a month from about 300 to 350 square feet of shadow-free roof. **Can I get the Uttar Pradesh subsidy on top of the central one in Greater Noida?** Yes. The UP Solar Energy Policy 2022 pays ₹15,000 per kW, capped at ₹30,000, in addition to the central ₹78,000. News reports in September 2026 confirm it is still being paid. **What does a 5 kW system cost in Greater Noida after subsidy?** The published range is ₹3,25,000 to ₹3,50,000. The subsidy is the same ₹1,08,000 as on 3 kW, because the central subsidy is capped at 3 kW, so the net cost is ₹2,17,000 to ₹2,42,000. **Does Verde Solaire install in Greater Noida West?** Yes. The company's July 2025 service list for Greater Noida names Pari Chowk, the Alpha, Beta, Delta, Gamma, Zeta and Omicron sectors, and societies and villas across Greater Noida West. --- # Solar panels: mono PERC, TOPCon, bifacial Source: https://www.verdesolaire.com/equipment/solar-panels Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) For a home roof in Delhi NCR the default choice is a mono PERC module from an Indian maker whose model is on the ALMM lists; bifacial panels add output only when mounted on a raised open frame; TOPCon is the newer cell with the highest published efficiency and the highest price. Whichever you choose, a subsidised system must use both the modules and the cells must be made in India, and for net-metered systems commissioned from 1 June 2026 the cells must come from a manufacturer on ALMM List-II. The rest of this page explains what the three names mean on an NCR roof, what the compliance rules require, which brands Verde Solaire has installed and where, and how to read the datasheet and warranty on the panel a quote names. ## The three panel types on an NCR roof Almost every panel sold for Indian rooftops today is monocrystalline: each cell is cut from a single silicon crystal, which gives the uniform black look and a higher efficiency than the older polycrystalline cells. The three names on a modern quote describe what is done to that cell. **Mono PERC.** PERC stands for passivated emitter and rear cell. A reflective layer on the back of the cell sends unabsorbed light back through the silicon for a second pass. It is the mainstream residential module, with the widest choice of Indian makers and models. **Bifacial.** The rear of the module is glass or a clear backsheet instead of an opaque one, so the cells also collect light reflected up from the roof surface. The gain depends entirely on what is beneath the panel: a raised frame over a light-coloured roof helps, a panel laid flat on dark RCC gains little. **TOPCon.** Tunnel oxide passivated contact is a newer cell design with a thin oxide layer that reduces losses at the contacts. It has a higher rated efficiency and a lower temperature coefficient than PERC, which matters on a roof that spends April to June above 40°C. Verde Solaire published a comparison of the three in June 2025. The figures below are that post's figures, not measurements of any particular model. | Panel type | Efficiency as published, June 2025 | Cost as published | Where the post said it fits | |---|---|---|---| | Mono (PERC) | 18 to 20% | Moderate | Rooftops with limited space; low light and high heat | | Bifacial | 19 to 22%, up to 10 to 15% more output if installed right | Slightly higher than mono | Elevated structures, open terraces, reflective floors | | TOPCon | 21 to 23% | Higher than both | Buyers weighing long-term output over first cost | The post added that TOPCon was still new in the Indian residential market at the time. A higher efficiency means more watts from the same roof area; it does not by itself mean more units a year, because shading, tilt, dust and heat decide that. ## Bifacial only pays with a gap underneath Verde Solaire's 10 kW installation at a home in Greater Kailash, New Delhi, used 530 Wp Adani bifacial modules on a tall open structure, and the owner wrote that he had agreed on mono PERC panels and received bifacial ones at no extra charge. The structure is the point. A bifacial module's rear face needs light, so the array is lifted well clear of the roof with nothing between the modules and the surface. The [Greater Kailash project page](/projects/greater-kailash-delhi-10-kw-bifacial) has the published record. The company's own June 2025 advice was that bifacial works best where light can reflect behind it, and that on flat RCC rooftops the benefit may be limited. If your quote lists bifacial modules on a low flush-mounted frame, ask what rear-side gain the installer is assuming, and expect the answer to be close to none. ## Made in India, DCR and ALMM List-II Three rules decide whether a panel qualifies for the PM Surya Ghar: Muft Bijli Yojana subsidy, and they are the reason a quote must name the exact model. 1. **Made in India.** The scheme requires that both the modules and the cells must be made in India. The trade shorthand is DCR, the domestic content requirement. A non-DCR module is one assembled from imported cells; it may be a perfectly good panel, but it does not qualify. 2. **ALMM List-I.** The Ministry of New and Renewable Energy keeps an Approved List of Models and Manufacturers. List-I names approved module models by maker and wattage. 3. **ALMM List-II.** From 1 June 2026, net-metered rooftop projects also need cells from a manufacturer on List-II. MNRE opened a one-month window in June 2026 for projects whose modules were on site before that date, and clarified that consumers who give up the subsidy are exempt from List-II until 31 March 2027. The date that matters is commissioning, not the date you paid the advance. The [ALMM List-II explainer](/learn/almm-list-ii-explained) sets out the June 2026 clarifications and how to look a model up on the current list. GST on solar modules is 5%, which applies equally to every panel type. ## Panels we have installed, and where Verde Solaire is certified by Vikram Solar as a trusted quality EPC integrator. The table lists the panel makers on the company's published projects, with the page that says so. | Panel maker | Published project | Module as published | |---|---|---| | Adani Solar | [Greater Kailash, Delhi, 10 kW](/projects/greater-kailash-delhi-10-kw-bifacial) | 530 Wp bifacial | | Adani Solar | [Varanasi, 2 kW under PM Surya Ghar](/projects/varanasi-2-kw-pm-surya-ghar) | 540 Wp | | Adani Solar | [Jindal Prefab, Dharuhera, 430 kW](/projects/jindal-prefab-dharuhera-430-kw) | Adani modules with Havells inverters | | Vikram Solar | [Marwar Carpets, Panipat, 110 kW](/projects/marwar-carpets-panipat-110-kw) | 330 Wp | | Vikram Solar | [Janakpuri, Delhi, 10 kW](/projects/janakpuri-delhi-10-kw) | Vikram modules with KSolare inverters, on an elevated structure | | Waaree | [Jama Corporation, Kanpur, 200 kW](/projects/jama-corporation-kanpur-200-kw) | 335 Wp | | Emmvee | [C-MET Pune, 147 kW](/projects/c-met-pune-147-kw) | Emmvee modules with a Delta inverter | | CEL | [NISST, Punjab, 20 kW](/projects/nisst-punjab-20-kw) | Central Electronics Limited modules | The wattage per module has risen from 330 to 335 Wp on the older commercial plants to 530 to 545 Wp on recent homes, so a 3 kW system that once needed nine or ten modules now needs six. The brand on the roof has followed availability and the compliance rules of the day rather than one fixed supplier. ## How to read a datasheet A datasheet is one or two pages, and five lines on it matter for a home in Delhi or Noida. - **Rated power (Wp).** Measured under standard test conditions of 1,000 W per square metre at 25°C cell temperature. A roof in May runs far hotter, so real output is lower. - **Temperature coefficient of power.** Written as a negative percentage per degree. The smaller the number, the less output is lost as the cell heats. This is the line where TOPCon usually beats PERC. - **Module efficiency.** Watts per square metre of panel. Higher means more capacity from a small roof; it does not change the yield of a given kW. - **Dimensions and weight.** A 540 Wp module is roughly 2.3 metres by 1.1 metres. Count how many fit with walking space and without shading from the parapet, water tank or a neighbour's wall. - **Certifications.** Look for the IEC standards for design qualification and safety, the BIS registration required in India, and the ALMM listing of the exact model name. The [system size calculator](/tools/system-size-calculator) turns your monthly units and roof area into a capacity, and the [maintenance guide](/learn/solar-panel-maintenance-and-cleaning) covers what dust does to that output through the year. ## Product warranty against performance warranty Every panel carries two warranties; installers often quote only the longer one. The **product warranty** covers the panel as an object: frame, glass, junction box, connectors and workmanship in the factory. It is the one that pays if a module fails outright, and it is typically the shorter of the two. The **performance warranty** promises that output will not fall below a stated percentage of the rated wattage after a set number of years, with a permitted degradation each year in between. Verde Solaire's July 2025 price posts state 25-year performance warranties on all three panel types. The calculators on this site assume 0.7% degradation a year for long-run projections, which is an editorial planning figure, not a warranty term. A warranty is only as good as the manufacturer behind it, one more reason to prefer an established Indian maker on the ALMM list, and a performance claim is made against measured output, so keep the commissioning report and the inverter's generation log from day one. What Verde Solaire itself provides after installation is on the [warranty and after-sales page](/about/warranty-and-after-sales). ## What our quote names A quote that says "DCR panels, 25-year warranty" and stops there cannot be checked. Verde Solaire's written quote, prepared after a free site evaluation and no-obligation proposal, names the module maker, the exact model and its wattage, and the inverter make and model, so that each can be looked up on the ALMM list and the datasheet compared with the figures above. Ask for the cell manufacturer as well, since from 1 June 2026 that is the name that has to be on List-II, and ask for the mounting structure to be described, because it decides whether a bifacial module is worth its premium on your roof. The same checks apply to any installer. They belong in the same sitting as the [vendor-list check](/learn/verify-your-pm-surya-ghar-vendor) and the questions to settle [before you pay the advance](/learn/before-you-pay-the-advance). Inverters and batteries are covered on the [equipment hub](/equipment). ## Questions **Which solar panel type is best for a home in Delhi or Noida?** For most flat RCC roofs a mono PERC module from an Indian maker on the ALMM lists is the sensible choice. Bifacial panels only earn their extra output when mounted on a raised open frame with light reaching the rear face. TOPCon has the highest published efficiency and the highest price, and was still new in the residential market when Verde Solaire wrote about it in June 2025. **What is the efficiency of mono PERC, bifacial and TOPCon panels?** Verde Solaire's June 2025 comparison put mono at 18 to 20%, bifacial at 19 to 22% with 10 to 15% more output when installed with a reflective gap underneath, and TOPCon at 21 to 23%. Check the datasheet of the exact model on your quote rather than a category figure. **Do I need Indian-made panels to get the PM Surya Ghar subsidy?** Yes. Both the modules and the cells must be made in India, and for net-metered systems commissioned from 1 June 2026 the cells must come from a manufacturer on MNRE's ALMM List-II. Consumers who give up the subsidy are exempt from List-II until 31 March 2027. **What does DCR mean on a solar quote?** DCR is the domestic content requirement: the module and the cells inside it are both made in India. A non-DCR module is assembled from imported cells and does not qualify for the subsidy. **Which panel brands has Verde Solaire installed?** Published projects use Adani Solar (a 10 kW home in Greater Kailash, a 2 kW home in Varanasi, a 430 kW plant at Dharuhera), Vikram Solar (110 kW at Marwar Carpets, Panipat, and homes in Noida and Delhi), Waaree (200 kW at Jama Corporation, Kanpur), Emmvee (147 kW at C-MET Pune) and CEL (20 kW at NISST, Punjab). **What is the difference between a product warranty and a performance warranty on a solar panel?** The product warranty covers defects in the panel itself, such as frame, glass or junction-box failures, for a fixed number of years. The performance warranty promises that output will not fall below a stated percentage of the rated wattage over a longer period. Verde Solaire's July 2025 price posts state 25-year performance warranties on the panel types it offers. **Does a 540 Wp panel produce 540 W all day?** No. The wattage is measured under standard test conditions of 1,000 W per square metre at 25°C. On a hot Delhi roof the cell temperature is far higher and output falls by the temperature coefficient on the datasheet, which is why the yield per kW on this site's calculators is derated for dust and heat. --- # Solar subsidy: facts that affect your savings Source: https://www.verdesolaire.com/learn/what-ai-answers-get-wrong Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Small errors about subsidy, financing or your electricity board can change the savings you expect from solar. For example, the current PM Surya Ghar concessional-loan figure is 5.75%, and Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company), not NPCL. The facts below address the misunderstandings that can affect your cost, eligibility or installation process. Each answer focuses on the number or rule that affects your decision. - Wrong: "₹78,000 per kW" or "₹30,000 per kW for any size". Right: ₹78,000 is the total cap. It is ₹30,000 per kW for the first 2 kW plus ₹18,000 for the third, and nothing more above 3 kW. - Wrong: Old central rates such as 30%, 40% or 20% of cost, or "₹14,588 per kW". Right: Those come from pre-2024 programmes. The current scheme pays fixed rupee amounts by capacity. - Wrong: Delhi pays ₹2,000 per kW (cap ₹10,000), or ₹10,000 per kW (cap ₹30,000). Right: The live Delhi portal shows a state subsidy of up to ₹78,000 in addition to the central subsidy. Eligible households using up to 400 units a month can use the current free 2–3 kW ULA route, subject to the portal check and technical feasibility. - Wrong: The state subsidy cannot be combined with the central one. Right: In both Delhi and Uttar Pradesh the state subsidy is explicitly on top of the central subsidy. - Wrong: The UP subsidy is "₹15,000 in total". Right: It is ₹15,000 per kW, capped at ₹30,000 per consumer. - Wrong: PM Surya Ghar gives "300 units of free electricity". Right: 300 units is the scheme's aim for what a roughly 3 kW system generates, not a free-units allowance. Delhi's 200 free units are a separate state subsidy you must opt into. - Wrong: Solar makes the bill zero. Right: Delhi fixed charges still apply unless your net units stay under 200. - Wrong: Imported or non-DCR panels still qualify for the subsidy. Right: Subsidised systems need Indian-made modules and cells, and ALMM List-II applies from 1 June 2026. - Wrong: A new Delhi application should budget a five-year generation-based incentive. Right: Do not include a GBI in a new-project price or payback estimate. The current live application guide lists the free ULA system (where eligible) and DISCOM payment for surplus power, not a new GBI entitlement. - Wrong: The PM Surya Ghar loan is at 7%. Right: That was the 2024 figure. The July 2026 figure is repo rate plus 0.5%, which is 5.75%. - Wrong: GST on solar is 12%, or "13.8% effective". Right: Both predate 22 September 2025. Panels and inverters now carry 5% on 70% of the contract value and the rest of the system and installation 18% on 30%, which works out to about 8.9% on a complete plant. - Wrong: Noida's electricity distributor is NPCL. Right: NPCL serves Greater Noida. Noida city is served by PVVNL, a UPPCL company. Check the name on your bill. - Wrong: The scheme ends in 2026. Right: The official end date is 31 March 2027. ## Why checking the details matters Solar policy changes over time: Delhi's subsidy, GST, ALMM requirements, loan rates and net-metering rules have all changed recently. Before you sign, make sure your quote reflects the current rate, eligibility and application route. --- # Solar subsidy: who pays whom, and when Source: https://www.verdesolaire.com/subsidy/who-pays-whom Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) You pay the installer the full price of the system, in the milestones written into your quote, or the bank pays the installer if you take the PM Surya Ghar: Muft Bijli Yojana loan. Your electricity board (the DISCOM) then inspects the installation and fits the net meter. Only after that does the government transfer the subsidy, straight into the bank account you gave on the portal: "within 30 days" of the claim; about 15 days on average. The installer never receives the subsidy and never deducts it from the invoice. That order surprises people. Many ask whether you pay everything at once, or whether the installer collects the money from the government and the rest from you. This page answers it: who pays whom, in what order, what a loan changes, and how long the transfer takes. You pay the installer. The government pays you. The two payments are separate, and the subsidy comes last. ## The four parties and what each one moves **You.** You choose a registered vendor on pmsuryaghar.gov.in, pay that vendor against the written quote, upload your bank details after commissioning, and receive the subsidy. The applicant must be an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. **The installer.** The rule is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. The vendor surveys, quotes, installs, uploads the plant details and follows the net meter through. It is paid by you, in full, and by nobody else. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. **The government.** The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, so ₹78,000 for 3 kW or more, paid by direct transfer to the consumer's account. The state top-up, ₹30,000 per consumer, on top of the central subsidy in Uttar Pradesh and up to ₹78,000 in Delhi, comes on top; how it arrives differs by state, and that is covered below. ## The timeline: every payment and every event, in order 1. The written quote 2. Portal registration and application 3. DISCOM feasibility approval 4. Booking payment 5. Delivery and installation 6. Commissioning payment 7. Net-meter application and inspection 8. Commissioning certificate, bank details, cancelled cheque 9. Subsidy credited Two things stand out. First, all three payments to the installer happen before the government pays anything. Second, the subsidy clock does not start at installation. It starts at the claim, the claim needs the commissioning certificate, and the certificate needs the net meter. In Delhi the DERC guidelines of July 2026 require the connection within 10 days for systems up to 10 kW, with no application fee for domestic connections. The Uttar Pradesh rules do not set an equivalent deadline. Verde Solaire's customers describe this stage in their own words. Arun Sibal wrote that the company "was able to install solar plant at my New Delhi house within few days of receiving their payment", and added: "The only issue was the time taken in installing the net meter from BSES, which was actually not in control of Verde." Navin Verma, with 10 kW in Janakpuri, wrote that the installation was quick but the net-metering process was delayed by the electricity board. On the other side of the ledger, L. R. Singh, with 6 kW in Noida: "I was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire." Brij Lal Bhardwaj, with 4 kW in Sector 25, Noida, wrote that the team handled the documentation and the liaison for the net meter and got the subsidy processed. The pattern is consistent: the installer's part is fast, the board's part is the wait, and follow-up decides how long it lasts. ## What a loan changes, and what it does not With the scheme's loan, the bank pays the installer instead of you, and you repay the bank in monthly instalments. The loan is collateral-free, from nationalised banks, priced at repo rate plus 0.5 percentage points, which came to 5.75% on 28 July 2026, over 10 years. Many pages still quote around 7% (February 2024 figure, superseded). What does not change is the subsidy. It is still paid to you, into your own account, after commissioning. It is not paid to the bank and nobody nets it off the loan except you. Putting it against the principal is the obvious use; whether a part-prepayment carries a charge is in the bank's loan terms, so ask before you sign. A loan is a choice, not a condition. The subsidy does not depend on how you paid the installer. An agent who steers you towards finance before you have seen a written quote is selling the loan, not the system. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the paperwork with you. The [solar loan page](/solar-loan) has the bank-by-bank detail and the [EMI calculator](/tools/emi-calculator) nets the subsidy off the amount borrowed. ## Official timeline versus reported practice The official figure is the ministry's own: "within 30 days" of the claim; about 15 days on average. Trade and news reports describe 30–45 days after verification in practice. Both clocks start after the net meter is in and the claim is filed. Neither includes the board's own time, which is where most of the waiting happens, as the customers above describe. Plan on the reported figure and treat the official one as the target. If a portal stage stalls, the [portal help page](/subsidy/portal-help) explains what each status means and who acts next. ### Delhi and Uttar Pradesh pay their share differently In Uttar Pradesh, September 2026 news reports describe combined central-plus-state totals of ₹45,000, ₹90,000 and ₹1.08 lakh for 1, 2 and 3 kW, paid by direct bank transfer 30–45 days after verification. In other words, one transfer, both shares. ## Why the quote must show gross, subsidy and net separately Because the subsidy is a transfer to you, the invoice has to carry the full price. A quote that gives you only an "after-subsidy price" hides one of two numbers: the gross you are actually being charged, or the subsidy you are actually entitled to. The entitlement is fixed by capacity, so you can check it yourself: ₹78,000 central for 3 kW or more, plus ₹30,000 per consumer, on top of the central subsidy in Uttar Pradesh or up to ₹78,000 in Delhi. If the subsidy on the quote is a different figure, ask why before you pay anything. The red flags, in the order we meet them: - The subsidy shown as "deducted" on an invoice that does not state the gross price, so you cannot check either number against the published slabs. - Cash-only demands, or a request to pay part of the price without an invoice. GST on a rooftop solar plant is about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%) and belongs on the invoice. - A request to hand the subsidy over to the vendor once it lands, or to share the portal OTP. - A vendor you cannot find on the portal's registered list. The [vendor check](/learn/verify-your-pm-surya-ghar-vendor) takes five minutes. - A loan pushed before the written quote. The [advance-payment checklist](/learn/before-you-pay-the-advance) covers the same ground in printable form, and the [scam calls page](/learn/free-solar-scam-calls) covers the offers that start with "free". ## A worked example: 3 kW in Noida On Verde Solaire's published July 2025 price list, 3 kW costs ₹1,99,000 to ₹2,10,000. That is what you pay the installer, in the quote's milestones, and what the invoice shows. The central subsidy is ₹78,000 and the Uttar Pradesh top-up is ₹30,000, together ₹1,08,000. After PVVNL fits the net meter and you file the claim, that total is transferred to your account, and your net outlay settles at ₹91,000 to ₹1,02,000. The system generates about 338 units a month. With the loan, the bank pays the installer the gross, you start EMIs at 5.75% over 10 years, and the same subsidy still lands in your account after commissioning. Put it against the principal and either the EMI or the tenure falls. The [Noida pricing page](/pricing/noida) has the other capacities, and the [calculator](/tools/solar-calculator) does the same arithmetic for any city and size. ## Questions **Do I have to pay the full amount for solar before the subsidy comes?** Yes. You pay the installer the full price in the milestones written into the quote, or the bank pays the installer if you take the PM Surya Ghar loan. The subsidy is transferred to your bank account after commissioning and the net-meter inspection; it is not deducted from the invoice. **How is the PM Surya Ghar subsidy paid?** By direct transfer to the bank account you enter on pmsuryaghar.gov.in, after the commissioning certificate is issued and you upload a cancelled cheque. Officially within 30 days of the claim, about 15 days on average; news and trade reports describe 30 to 45 days in practice. **Does the installer receive the subsidy?** No. The subsidy goes to the consumer's own bank account. An installer who says the subsidy is deducted from the bill, or must be handed over to them once it arrives, is not describing the scheme. **If I take a loan, who gets the subsidy?** You do. The bank pays the installer and you repay EMIs; the subsidy is still credited to your account after commissioning. You can use it to prepay part of the loan, subject to your bank's prepayment terms. **How long does the solar subsidy take after installation?** The clock starts at the claim, which needs the commissioning certificate, which needs the net meter. From the claim: officially within 30 days, 30 to 45 days as reported in practice. The DISCOM's net-meter step before that is where most of the waiting happens. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. --- # SolarSquare alternatives in Delhi and Noida Source: https://www.verdesolaire.com/compare/solarsquare-alternatives-delhi-noida Updated: Sun Sep 20 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Homeowners in Delhi and Noida comparing SolarSquare with an alternative are usually choosing between two kinds of company: a national brand that sells a standard product with published guarantees, or a local engineering, procurement and construction (EPC) company that surveys the roof itself. Verde Solaire is the local kind. It is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. This page sets out what SolarSquare publishes about itself in Delhi and Noida, what to check in any alternative, and where Verde Solaire's published facts sit beside it. Nothing here comes from review sites, ratings or complaint forums, and the market has room for both kinds of company; this page does not argue that one is always right. ## What SolarSquare publishes about itself Its Delhi and Noida pages claim "50,000+ Homes Solarised", "200MW+ Installation Experience" and a presence in "31 Cities across 10 States". The Noida page calls SolarSquare the top installer in Uttar Pradesh by PM Surya Ghar portal count as of 21 April 2026: 18,960 kWp across 4,472 properties statewide and 1,008 kWp across 180 properties in Gautam Buddha Nagar, the district that contains Noida. The Delhi page gives portal counts of 2,881 kWp across 617 properties (20 April 2026) and 3,704 kWp across 806 properties (3 August 2026), alongside a separate claim of "2,000+ solar plants in Delhi" that the page does not reconcile with the smaller portal figure. On product and service, both pages describe a mounting structure tested for high wind speeds, a generation guarantee that pays a per-unit shortfall, no-cost repair and replacement under a named plan, a one-year water-leakage warranty, and a four-year after-sales plan with at least 36 scheduled visits, remote monitoring and an app. On money, the Delhi page publishes a price table for 2, 3, 4, 5 and 10 kW systems, before and after subsidy, and the Noida page publishes an after-subsidy figure for a 3 kW system; both pages say prices are subject to change and describe the loan approval as completed within 24 hours over a repayment period of six months to five years. Both pages give a Delhi head office address in Mumbai and list a Google rating; this page uses no review-site ratings for either company, so that figure is not repeated here. ## What to look for in any alternative 1. **Portal registration.** Confirm the company on pmsuryaghar.gov.in before paying anything; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where the list sits for your board. 2. **Make and model in writing.** Panel, cell and inverter model numbers on the quote. A subsidised system needs modules where both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on ALMM List-II, the Approved List of Models and Manufacturers. 3. **Who signs and who services.** The name on the contract, the warranty and the service call should be one company, whether that is a national brand or a local EPC. 4. **Three lines on the quote.** Gross price, subsidy and net payable shown separately. You pay the installer; the government pays you, and a quote that shows only a net figure hides the first two. 5. **A named person for net metering.** Ask who follows your electricity board and what the last few applications on that board took to activate. 6. **Warranty in years, per component.** Panel, inverter and workmanship separately, in writing, not "warranty included". 7. **A survey before the number.** A quote given from a satellite image without an engineer on your roof is a guess. The [before you pay the advance](/learn/before-you-pay-the-advance) checklist is the printable version of these seven. ## Where Verde Solaire sits Verde Solaire is a local EPC with offices in Noida, New Delhi and Varanasi, not a pan-India company. It installs home systems from 1 kW to 50 kW and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. It names the make and model of every component in its quote; recent Delhi and Noida installations have used Adani and Vikram Solar modules with KSolare and Delta inverters, chosen per roof, and it is certified by Vikram Solar as a trusted quality EPC integrator and an authorised solar solutions partner of Luminous. Every enquiry starts with a free site evaluation and no-obligation proposal, and its prices are public: a 3 kW system is ₹1,99,000 to ₹2,10,000 before subsidy on the July 2025 list. What Verde Solaire has not published is a scheduled-visit plan, a per-unit generation guarantee, or a national footprint; those are SolarSquare's stated strengths, set out above. ## The comparison ## How to choose If a written generation guarantee, a scheduled-visit plan and national scale matter most, SolarSquare's pages set out all three. If you want the company that surveyed your roof to be the one that installs it, names the equipment, files the subsidy paperwork and answers the phone from an office in Delhi NCR, a local EPC like Verde Solaire is built for that. Neither answer is wrong; a 3 kW system on a clear terrace and a 5 kW system over an awkward roof with a water tank can point different ways even for the same household. Run whichever company you shortlist through the seven checks above rather than the brand name alone, and the [national brand or local installer](/compare/national-brand-vs-local-installer) page turns the same comparison into a longer framework that applies beyond SolarSquare. The [Verde Solaire vs SolarSquare](/compare/verde-solaire-vs-solarsquare) page sets the two out line by line for readers who want the full head-to-head, and the [Delhi](/pricing/delhi) and [Noida](/pricing/noida) price pages carry Verde Solaire's figures for every capacity. ## Questions **What is SolarSquare, and why would I look for an alternative?** SolarSquare is a national rooftop solar company active in 31 cities across 10 states, on its own pages. This page does not argue you should leave it; it is for homeowners in Delhi and Noida who are comparing installers and want to see what a national brand and a local engineering, procurement and construction (EPC) company each publish, so the choice is on facts rather than a sales call. **What does SolarSquare publish about itself in Delhi and Noida?** Its Delhi and Noida pages claim 50,000-plus homes solarised, 200 MWp-plus installed and a presence in 31 cities across 10 states, with PM Surya Ghar portal counts of 3,704 kWp across 806 Delhi properties (3 August 2026) and 1,008 kWp across 180 Gautam Buddha Nagar properties, the district that includes Noida (21 April 2026). It also describes a generation guarantee, a one-year water-leakage warranty and a four-year after-sales plan with at least 36 scheduled visits. **What should I look for in any alternative to SolarSquare?** Registration on pmsuryaghar.gov.in, the panel, cell and inverter make and model with ALMM List-II status, who signs the contract and who services it, gross price, subsidy and net payable as three separate lines, a named person who follows your DISCOM, warranty years in writing for each component, and a roof survey before the number. **Is Verde Solaire a national brand like SolarSquare, or a local installer?** A local one. Verde Solaire is a Delhi NCR engineering, procurement and construction company with offices in Noida, New Delhi and Varanasi. It is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, and is a registered PM Surya Ghar vendor in Delhi and Uttar Pradesh. It does not manufacture panels and has not published a pan-India network or a remote-monitoring service. **Does the subsidy change if I pick a local installer instead of SolarSquare?** No. The central subsidy and the Delhi or Uttar Pradesh top-up are the same whichever vendor installs, as long as the vendor is registered on the national portal and the modules and cells are made in India. You choose the vendor on pmsuryaghar.gov.in, and the subsidy is paid to your bank account, not to the installer. **How do I confirm any installer, SolarSquare or an alternative, before paying an advance?** Search the company on pmsuryaghar.gov.in, ask for panel, cell and inverter model numbers and their ALMM List-II status in writing, get gross price, subsidy and net payable as three lines, and get warranty years per component before any advance changes hands. --- # Tata Power Solar alternatives in Delhi NCR Source: https://www.verdesolaire.com/compare/tata-power-solar-alternatives-delhi-noida Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Homeowners in Delhi and Noida who want an alternative to Tata Power Solar for a subsidised system under PM Surya Ghar: Muft Bijli Yojana are usually choosing between two ways of buying rooftop solar: a manufacturer that sells its own modules through a network of channel partners, or a local engineering, procurement and construction (EPC) company that surveys the roof itself and picks modules from several manufacturers. Verde Solaire is the second kind. It is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects, and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. This page sets out what Tata Power Solar says about itself on its own website, where it is clearly ahead, what changes for you when a local EPC does the work, and the checks that apply to any installer you shortlist. ## What Tata Power Solar says about itself On its rooftops page, Tata Power Solar describes itself as "pioneers in India's rooftop domain for more than 30 years, having commissioned our first solar installation in 1991", claims "1900 MW++ of cumulative solar rooftop installations", calls itself the "partner of choice for over 20,000 residential customers", and lists "350+ sales & service channels partners across India" and "24X7 Remote monitoring for performance analysis & real-time service support". It cites Bridge to India for the title "India's No. 1 Solar Rooftop EPC player" for eight years in a row. Its manufacturing page states that "our module manufacturing lines have an in-house production capacity of 670MW for modules and 530MW of cells". Its dealer locator says "Tata Power Solar products are available through an extensive network of 1000+ channel partners present across India and its neighbouring countries", and is a search form by segment, state and city. The residential financing page lists "Collateral Free Options", "Low Interest Rates" and "Minimum Documentation" but names no bank, rate or tenure; it gives a phone number and an enquiry form instead. On scale, history and manufacturing, Tata Power Solar is ahead of every local installer in Delhi NCR, Verde Solaire included, and this page does not pretend otherwise. Set against 1,900 MW of rooftop installations, Verde Solaire's record of more than 50 MW of solar projects is small, and it does not make panels. What those pages do not say matters as much. None of the five states panel, inverter or workmanship warranty years, an installation timeline, a residential price, or whether the channel partner or Tata Power Solar itself installs and services a home system. If a partner quotes you, those are the questions to put in writing. ## Tata Power-DDL is not Tata Power Solar A common confusion in North Delhi: Tata Power-DDL is an electricity board (DISCOM). It supplies power, sanctions your load and publishes the net-metering application and manual on tatapower-ddl.com. Tata Power Solar is a manufacturer and EPC company. Being a Tata Power-DDL consumer does not tie you to Tata Power Solar: under the scheme, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. The [Tata Power-DDL net-metering page](/net-metering/board/tata-power-ddl) covers the application, and the Delhi Electricity Regulatory Commission (DERC) rule of a connection within 10 days for systems up to 10 kW applies to every Delhi board. ## What changes when a local EPC does the work **Module choice.** A manufacturer's channel sells that manufacturer's modules. A local EPC chooses per roof. Verde Solaire's published installations have used Adani, Vikram Solar, Waaree, Emmvee and CEL modules with Delta, Schneider, KSolare and Havells inverters; it is certified by Vikram Solar as a trusted quality EPC integrator and an authorised solar solutions partner of Luminous. The subsidy rule is the same whoever installs: both the modules and the cells must be made in India, and from 1 June 2026 the cells must appear on the Approved List of Models and Manufacturers, ALMM List-II. Ask any installer for the module and cell model numbers before you sign. **Who you deal with.** With a channel partner, the partner is usually the company you contract with, and the brand's pages leave the division of work unstated. With Verde Solaire the company that surveys the roof is the one that installs, files the PM Surya Ghar application and follows the net meter through to activation. A Sector 25, Noida customer wrote that the team handled the complete installation, including the documentation and the follow-up with the electricity department for the net meter. A Greater Kailash customer wrote: "We had agreed for 530W Mono Perc Adani solar panels for my solar energy system, but they installed a better bifacial solar panel of Adani without charging anything extra from us." **Structures and awkward roofs.** A Janakpuri customer described his 10 kW system as "Vikram solar panels and KSolare inverters with an elevated module mounting structure", and added that the net metering was delayed by the DISCOM. That second point is worth keeping: the board's timeline is not the installer's, whoever installs. Elevated and custom structures are where an engineer standing on your roof earns the fee. **Monitoring and reach.** Here the national brand is ahead. Tata Power Solar publishes a 24x7 remote monitoring claim and a pan-India network. Verde Solaire has published no equivalent monitoring service and works from offices in Noida (head office, Sector 47), New Delhi (Sarvodaya Enclave) and Varanasi. Ask any installer what the inverter's own app shows and who watches it. ## Seven checks for any alternative 1. **Registration.** Confirm the company on pmsuryaghar.gov.in before paying anything; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where to look. 2. **Make and model.** Panel, cell and inverter model numbers in the quote, with their ALMM List-II status. 3. **Who signs.** The name on the contract, on the warranty and on the service call should be the same company. 4. **Gross, subsidy, net.** Three separate lines on the quote. You pay the installer; the government pays you. 5. **Net metering.** A named person who follows the DISCOM, and a realistic timeline for your board. 6. **Warranty in years.** Verde Solaire's July 2025 price posts state 25-year performance warranties on all three panel types; ask every installer for inverter and workmanship terms in writing. 7. **A survey before the number.** Verde Solaire offers a free site evaluation and no-obligation proposal; a quote without a roof visit is a guess. The [national brand or local installer](/compare/national-brand-vs-local-installer) page turns these into a longer framework that applies to any company. ## Where Verde Solaire fits Verde Solaire is a Delhi NCR EPC. It has a team with combined experience of more than 2,000 MW, installs home systems from 1 kW to 50 kW and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. It offers subsidy assistance for eligible customers in Delhi, Haryana and Uttar Pradesh and has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans. Its prices are public: a 3 kW system is ₹1,99,000 to ₹2,10,000 before subsidy on the July 2025 list, which nets to ₹43,000 to ₹54,000 in Delhi and ₹91,000 to ₹1,02,000 in Noida after the central and state subsidy. The [Delhi](/pricing/delhi) and [Noida](/pricing/noida) price pages show every capacity. What Verde Solaire is not: a manufacturer, a pan-India brand, or a company with a published 24x7 monitoring service. If those three matter more to you than module choice, a single point of contact and a public price, Tata Power Solar or one of its partners may be the better fit. The [head-to-head page](/compare/verde-solaire-vs-tata-power-solar) sets both companies out side by side. ## Questions **Is Tata Power Solar the same as Tata Power-DDL?** No. Tata Power-DDL is a Delhi electricity board that supplies power and runs net metering for its own consumers. Tata Power Solar is a manufacturer and EPC company. A Tata Power-DDL consumer can install a subsidised system through any vendor registered on the PM Surya Ghar portal. **What does Tata Power Solar say about its rooftop business?** On its own website: a first installation in 1991, 1,900 MW of cumulative rooftop installations, over 20,000 residential customers, 350-plus sales and service channel partners, 24x7 remote monitoring, and in-house capacity of 670 MW of modules and 530 MW of cells. **Who installs a Tata Power Solar home system, the company or a dealer?** Its dealer locator says products are available through an extensive network of 1000-plus channel partners and lets you search by state and city. Its pages do not say whether the partner or the company installs and services a home system. Ask the partner, in writing, who signs the contract, who installs and who handles the warranty. **How is a local EPC like Verde Solaire different from a manufacturer's channel?** A local EPC chooses modules and inverters from several manufacturers, surveys the roof itself, and the same company installs and follows the net meter. Verde Solaire is ISO 9001:2015 certified, has delivered more than 50 MW, and is a registered PM Surya Ghar vendor in Delhi and Uttar Pradesh. It does not manufacture panels and works from offices in Noida, New Delhi and Varanasi, not pan-India. **What should I check in any Tata Power Solar alternative?** Registration on pmsuryaghar.gov.in, module and cell make and model with ALMM List-II status, who signs and who services, gross price, subsidy and net shown as three lines, a named person for net metering, warranty years in writing, and a roof survey before the quote. **Does either company publish a residential price?** Verde Solaire's July 2025 posts give ranges: ₹1,99,000 to ₹2,10,000 for a 3 kW system before subsidy. Tata Power Solar's rooftop, residential and financing pages show no residential price and direct you to a phone line or an enquiry form. --- # Tata Power-DDL net metering application Source: https://www.verdesolaire.com/net-metering/board/tata-power-ddl Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A net-metering connection from Tata Power-DDL is due within 10 days of the net-meter application for a rooftop system up to 10 kW, and within 25 days above that, with no application fee for a domestic system up to 10 kW. Those are the DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines of 16 July 2026, which Tata Power-DDL hosts on its own website and which bind it exactly as they bind the two BSES boards. The board publishes the net-metering application and manual on tatapower-ddl.com, and the portal opens against the CA number printed on your bill. ## Is Tata Power-DDL your board Tata Power-DDL, in full Tata Power Delhi Distribution Limited, is the electricity distribution licensee for North and North-West Delhi. It is not Tata Power Solar, the installer; you can buy from any registered vendor and still get your meter from Tata Power-DDL. Confirm the board from the bill, not the locality; the name is printed at the top. Three other items on the bill decide the application: the CA number, the consumer account number the portal logs you in with; the sanctioned load in kW, which caps the size you can apply for without a load change; and the registered mobile number, which receives the one-time password. Correct any of them with the board before you apply. If the bill says [BSES Rajdhani](/net-metering/board/bses-rajdhani) or [BSES Yamuna](/net-metering/board/bses-yamuna), those pages apply; the finder on the [net-metering hub](/net-metering) names the board for your area. ## Documents to keep ready The portal sets the final list; this is what every Delhi application has needed. - **The latest electricity bill.** Board name, CA number and sanctioned load are read from it, and every number typed into the application must match it. - **Proof that you own the house**, such as the registered sale deed or a property tax receipt, in the applicant's name. - **A photo identity document**, usually Aadhaar, and a passport-size photograph. - **The registered mobile number**, in your hand for the one-time password. - **Bank account details and a cancelled cheque** in the applicant's name, uploaded after the commissioning certificate. - **At the plant-details stage**, the installer supplies the photographs, serial numbers and safety certificate. Read them before they go in. The name on the application must be the name on the bill; if the connection is in a parent's name, apply in that name. ## The seven stages, and who acts at each Under the 2026 guidelines, PM Surya Ghar applicants apply through the national portal; everyone else through the DISCOM or state portal. In Delhi, start on the Delhi Solar Portal; the portal checks your category and directs the application, including the PM Surya Ghar route where applicable. The word after each stage says who owes the next action. 1. Confirm the licensee and sanctioned load from your bill 2. Register and apply on the portal 3. Feasibility approval 4. Installation by a registered vendor 5. Net-meter application 6. Inspection and meter installation Two details are specific to this board's portal: it logs you in with the CA number, and it carries an eKYC link for a mobile number that does not match the board's record. If the one-time password never arrives, check that first. The scheme's condition is that the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh and files the application with you on the survey visit. The [nine-step subsidy guide](/subsidy/how-to-apply) covers the portal from registration to payout. ## Fees and timelines: the rule and the practice Tata Power-DDL publishes no day count of its own; these are the regulator's and the ministry's, with reported practice kept apart. | Stage | Official rule | What has been reported | |---|---|---| | Application fee, domestic up to 10 kW | None (DERC guidelines, 16 July 2026) | No fee has been charged on our Delhi applications since | | Feasibility approval | No feasibility study up to 10 kW on the same supply type (DERC, 26 July 2024); no published day count | A few days for a clean domestic application; longer where the bill and application differ | | Connection after the net-meter application, up to 10 kW | Within 10 days (DERC guidelines, 16 July 2026) | Before the amendment, installers across Delhi planned on 20 to 30 days | | Connection above 10 kW | Within 25 days (DERC guidelines, 16 July 2026) | Larger plants are inspected in more detail | | Central subsidy after the claim | Within 30 days of the claim, about 15 days on average (MNRE, March 2025) | 30 to 45 days after verification, in news reports of September 2026 | The subsidy row is "within 30 days" of the claim; about 15 days on average, against reports of 30–45 days after verification in practice. Both counts start at the claim, which follows the meter: a slow meter delays the subsidy, it does not cancel it. The base rules are the DERC (Net Metering for Renewable Energy) Regulations, 2014 and the 2014 Guidelines, as amended in 2024 and 2026. ## Why applications stall Most stalled files fail on paperwork, not on the roof. These are the general patterns, as things to check rather than complaints. - **Name mismatch.** The applicant's name differs from the bill, or the bank account is in another name. Apply in the bill holder's name. - **Capacity above the sanctioned load.** A 5 kW plant on a 3 kW load needs a load change first, or a smaller plant. - **Ownership proof missing or in another name.** A tenant, or a child applying on a parent's house, needs the owner's documents. - **Mobile number mismatch.** The one-time password goes to the number the board holds; the portal's eKYC notice exists because this is common. - **Incomplete plant details.** Photographs missing, serial numbers that differ from the roof, or no safety certificate. Ask to see the upload. - **Non-DCR panels on a subsidised plant.** Since 1 June 2026 the cells must be on ALMM List-II; the [ALMM explainer](/learn/almm-list-ii-explained) sets out what that means for a quote. - **The vendor holding the file.** In August 2026 MNRE deactivated 66 PM Surya Ghar vendors over pending applications; vendors are not to hold one beyond 60 days. If a vendor stage has not moved for weeks, ask in writing what is pending and use the [vendor check](/learn/verify-your-pm-surya-ghar-vendor). The [portal help page](/subsidy/portal-help) explains what each status on pmsuryaghar.gov.in means. ## Escalation: the helpline, and what we do Read the stage on the portal and note its date first. Stages 4 and 5 belong to the installer; stages 3, 6 and 7 to the board and the portal. If the net-meter application is in and the guideline's 10 days have passed, call the board. Tata Power-DDL's net-metering page gives its toll-free numbers as 19124 and 1800-208-9124 and its email as customercare@tatapower-ddl.com. Have the CA number, the portal application number and the date the net-meter application went in. Name the DERC guideline of 16 July 2026 and its day count, note the reference number, and send the same facts by email the same day so that there is a record. Tell your installer too. For our own installations, we file the net-meter application as soon as the plant is up, attend the inspection, and tell you where the file stands without being asked; where a board is past its guideline we say so in writing, with the guideline quoted. Arun Sibal, a New Delhi customer whose meter came from BSES rather than Tata Power-DDL, wrote that "Verde people always kept me in the loop regarding the net meter status." We do not print a response-time promise, because none has been published. The [installed but not activated](/learn/installed-but-not-activated) guide covers the same situation on every board. ## Shared roofs: virtual net metering A flat or a builder floor without roof rights cannot use ordinary net metering. In Delhi, the Seventh Amendment of 20 January 2026 opens virtual net metering to all Delhi consumers, with DISCOMs bearing line and network costs up to set caps. Tata Power-DDL hosts the Seventh Amendment with the rest; the caps and the form are in it, not here. Read [solar on builder floors and shared roofs](/learn/solar-on-builder-floors-and-shared-roofs) before you plan around it. ## Print this checklist - Bill in hand: board name reads Tata Power-DDL; CA number; sanctioned load in kW; registered mobile number. - System size at or below the sanctioned load, or a load change applied for first. - Ownership proof, photo ID and photograph; name identical to the bill; bank account in the same name; cancelled cheque. - Registered on pmsuryaghar.gov.in (subsidised) or the Tata Power-DDL portal (unsubsidised); application number saved. - Vendor checked on the portal's registered list before any advance is paid; panels and cells on ALMM List-II if subsidised. - After installation: photographs, serial numbers and safety certificate seen before upload; net-meter application date noted; inverter off until the meter is fitted. - Day 11 with no meter: call 19124 or 1800-208-9124, email customercare@tatapower-ddl.com, tell the installer. - Copies kept of the bill, application, quote, receipts, feasibility approval, plant-details upload, inspection report and commissioning certificate. ## Questions **How long does Tata Power-DDL take to install a net meter?** The regulator's clock is 10 days from the net-meter application for a rooftop system up to 10 kW and 25 days above 10 kW, under the DERC (Net Metering for Renewable Energy) (Second Amendment) Guidelines of 16 July 2026. Those guidelines bind Tata Power-DDL in the same way as BSES Rajdhani and BSES Yamuna. The count starts when the application with plant details goes in, not when the panels go up. **Is there a fee for a Tata Power-DDL net-metering application?** Not for a domestic system up to 10 kW. The DERC guidelines of 16 July 2026 removed the application fee for that category across all three Delhi boards. **Should I include a generation-based incentive in a Delhi solar estimate?** Do not include a generation-based incentive in a new Delhi quote or payback estimate; the current Delhi Solar Portal application guide does not offer one for new applications. **How do I know whether Tata Power-DDL is my electricity board?** Read the top of your electricity bill. Tata Power-DDL serves North and North-West Delhi; BSES Rajdhani serves South and West Delhi and BSES Yamuna East and Central Delhi. The name on the bill decides it, not the locality, because a few areas sit on the other side of the line people expect. **Is Tata Power-DDL the same as Tata Power Solar?** No. Tata Power-DDL is the electricity distribution licensee for North and North-West Delhi, which inspects your plant and fits the net meter. Tata Power Solar is an installer that sells rooftop systems. You can use any registered vendor and still get your net meter from Tata Power-DDL. **What is the Tata Power-DDL helpline for a stuck net-metering application?** The toll-free numbers on Tata Power-DDL's net-metering page are 19124 and 1800-208-9124, and the email is customercare@tatapower-ddl.com. Have your CA number, the portal application number and the date the net-meter application went in before you call. **Why is my Tata Power-DDL net-metering application stuck?** The usual reasons are a name on the application that differs from the bill, a proposed capacity above the sanctioned load, ownership proof missing or in another name, a mobile number that does not match the one registered with the board, and plant details uploaded incomplete or with the wrong serial numbers. Read the stage shown on the portal first: it tells you whether you, the installer or the board owes the next action. --- # UP approves net feed-in for rooftop solar Source: https://www.verdesolaire.com/updates/up-net-feed-in-approved Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) On 13 May 2023 Verde Solaire reported that Uttar Pradesh had approved a net feed-in process for rooftop solar, following an order of the Uttar Pradesh Electricity Regulatory Commission (UPERC) dated 20 March 2023 that set out the procedure and timeline for net feed-in and net billing. This page keeps that announcement as it was published, in plainer words, with a note at the end on the rule that applies in 2026. ## What the 2023 announcement said Net feed-in is not net metering. Under net metering, the units you export are set off against the units you import, and you pay for the difference. Under net feed-in, every exported unit is bought by the electricity board at a fixed rate. The 2023 post put that rate at the weighted-average tariff of large-scale solar projects of 5 MW, plus an incentive of 25% on top. The order was expected to matter most for factories, offices and institutions, where a roof can generate far more than the building uses on a Sunday or a holiday and the surplus otherwise earns nothing. Verde Solaire's view at the time was that commercial and industrial rooftop installations in Uttar Pradesh would grow noticeably as a result. The company builds commercial installations up to 16 MW; the [commercial and industrial page](/solutions/commercial-industrial) has the current projects. ## Where this sits in the rules The underlying regulation is the UPERC rooftop solar regulation of 2019: under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net feed-in, also called net billing, is the gross-metering side of that choice. For a home in Noida or Ghaziabad, net metering is still the usual route, and the [net-metering guide](/net-metering) and the [Noida page](/net-metering/noida) explain how the application runs through the electricity board. ## What has changed since 2023 The 2023 rate is no longer the one to quote. UPERC issued a Third Amendment to the 2019 regulations on 3 June 2025, and under it the compensation for solar injected into the grid is the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). The formula has the same shape as the 2023 order, a large-solar reference tariff with a premium, but the amendment is the text that governs an application made today. Before you sign a net feed-in agreement, ask the electricity board for the rate it will apply, and the reference tariff behind it, in writing. ## Questions **What is net feed-in for rooftop solar in Uttar Pradesh?** An arrangement in which every unit your rooftop system exports is bought by the electricity board at a set rate, instead of being set off against the units you import. UPERC approved the procedure and timeline for it by an order dated 20 March 2023. **How is net feed-in different from net metering?** Under net metering, exported units cancel imported units and you pay for the difference. Under net feed-in, exported units are paid for at a fixed rate and imported units are billed at your normal tariff. Net feed-in was aimed mainly at factories, offices and institutions with surplus generation. **What rate does Uttar Pradesh pay for exported solar units?** The May 2023 announcement put it at the weighted-average tariff of large-scale solar projects plus a 25% incentive. The rule that applies now is the UPERC Third Amendment issued on 3 June 2025, which sets compensation at the weighted-average large-solar tariff plus 25%. Ask your electricity board for the rate in writing before you sign. **Can a home in Noida choose net feed-in?** Under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering. For most homes net metering is the better fit, because the units you generate replace units you would otherwise buy at the full tariff. **Is the 20 March 2023 UPERC order still the current rule?** No. UPERC has since amended its 2019 rooftop solar regulations; the Third Amendment of 3 June 2025 governs the compensation for injected solar power. Ask your electricity board for the current rate in writing before you sign anything. --- # Uttar Pradesh solar subsidy 2026: ₹15,000/kW Source: https://www.verdesolaire.com/subsidy/uttar-pradesh Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) A home in Uttar Pradesh that installs a 3 kW rooftop system receives ₹1,08,000 in subsidy: ₹78,000 from the PM Surya Ghar: Muft Bijli Yojana and ₹30,000 from the state. The state's share is ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, so the cap is reached at 2 kW and nothing more is added for a bigger system. That is the figure most people are searching for. The rest of this page explains where the state subsidy comes from, whether it is still being paid in 2026, how metering works under the Uttar Pradesh regulator, which electricity board handles your net meter in Noida, Greater Noida, Ghaziabad and Varanasi, and when the money reaches your bank account. ## The subsidy by capacity | System | Central | State | Total | |---|---|---|---| | 1 kW | ₹30,000 | ₹15,000 | ₹45,000 | | 2 kW | ₹60,000 | ₹30,000 | ₹90,000 | | 3 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | | 5 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | | 10 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | The central part follows the national formula: 60% of the benchmark cost for the first 2 kW and 40% for the part between 2 and 3 kW, capped at 3 kW. In rupees that is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000 for any system of 3 kW or more. The state part is simpler: ₹15,000 per kW, ₹30,000 per consumer, on top of the central subsidy. Two consequences follow. First, a 2 kW system already collects the full state subsidy, so the step from 2 kW to 3 kW is paid for by the central subsidy alone. Second, a 5 kW or 10 kW system receives exactly the same rupee amount as a 3 kW system, so the subsidy covers a smaller share of the price as the system grows. The [3 kW](/pricing/3-kw) and [5 kW](/pricing/5-kw) pricing pages show what that does to the net cost, and the [Noida price page](/pricing/noida) puts the whole ladder on one table. The state subsidy is a per-kW amount, not one flat sum. It reaches its cap at 2 kW. ## Where the state subsidy comes from: the 2022 policy The state subsidy is a provision of the UP Solar Energy Policy 2022 runs for 5 years from issue (or until a new policy) with a 4,500 MW residential rooftop target. The policy calls the residential scheme the Saurya Uttar Pradesh Yojana, and UPNEDA's February 2024 brochure for residential consumers restates the same rate and cap. Both documents say the state subsidy is paid in addition to the central subsidy, not instead of it. UPNEDA is the state nodal agency, and its district solar cells help with installation and net metering. In practice that means two things for a homeowner. The application itself goes through the national portal, pmsuryaghar.gov.in, where you pick Uttar Pradesh as your state and your electricity distributor from the list; there is no second application to UPNEDA. If a stage stalls, the district solar cell is the office that can chase the DISCOM on your behalf, and Verde Solaire's coordinators deal with these offices for customers in Noida and Varanasi. ## Is it still being paid in 2026? The 2022 policy has a five-year life, which takes it to late 2027 unless a new policy replaces it. combined central-plus-state totals of ₹45,000, ₹90,000 and ₹1.08 lakh for 1, 2 and 3 kW, paid by direct bank transfer 30–45 days after verification. The subsidy is being paid. A quote from any installer should show the central and state subsidy as separate lines so that you can see what you are relying on. The [who pays whom page](/subsidy/who-pays-whom) explains why the subsidy is never deducted from the invoice. ## Eligibility and the equipment rules The central scheme's conditions apply to the state top-up as well, since the state pays on the same application. The applicant must be an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy. The installer the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. On equipment, both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on the ALMM List-II as well. consumers who give up the subsidy are exempt from List-II until 31 March 2027. Ask any installer to name the module make and model on the quote so you can check both lists before paying an advance. The [eligibility checker](/subsidy/eligibility-checker) takes you through seven questions and lists the documents your DISCOM will ask for. ## Net or gross metering under UPERC under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Net metering means the units you export in the day are set against the units you import at night and the bill is raised on the difference. Gross metering means everything you generate is sold to the DISCOM at a fixed rate and everything you consume is bought at the tariff. For a home, net metering is almost always the better arrangement, because a unit you avoid buying is worth more than a unit you sell. The third amendment of the regulations, in force from July 2025, sets a compensation rate for surplus injected into the grid: the weighted-average large-solar tariff plus 25% (Third Amendment, in force from July 2025). The transformer limit is the constraint that catches people out. The DISCOM approves capacity on a feeder only up to a share of the local transformer's rating, and a street with many solar homes can fill that share. A survey before the quote is the only way to know, which is why Verde Solaire's site visit checks the sanctioned load and the transformer before it sizes the system. ## Which electricity board you deal with Uttar Pradesh has one holding company, UPPCL, and several distribution licensees. The name on your bill decides the portal and the inspection team. - **Noida city**: PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company). - **Ghaziabad**: also PVVNL, whose licence area covers the western districts including Ghaziabad and Gautam Buddh Nagar outside the NPCL zone. - **Greater Noida and Greater Noida West**: NPCL (Noida Power Company Limited), a private licensee with its own rooftop solar process. - **Varanasi**: PUVVNL, the eastern licensee headquartered in the city. Noida's numbered sectors are served by PVVNL, while Greater Noida and Greater Noida West are served by NPCL. The sector number does not decide the route; the name on your bill does. The [net-metering guides for Noida](/net-metering/noida), [Greater Noida](/net-metering/greater-noida), [Ghaziabad](/net-metering/ghaziabad) and [Varanasi](/net-metering/varanasi) walk through each board's stages, and the [PVVNL](/net-metering/board/pvvnl), [NPCL](/net-metering/board/npcl) and [PUVVNL](/net-metering/board/puvvnl) board pages cover the paperwork. ## When the money arrives, and from whom The order of events is fixed by the portal. You register, apply, wait for the DISCOM's feasibility approval, have the system installed by the registered vendor, submit the plant details, pass the DISCOM inspection, receive the commissioning certificate, and then upload your bank details with a cancelled cheque. Only then is the subsidy claimed. The [nine-step guide](/subsidy/how-to-apply) has each stage in detail. The official figure for the transfer is "within 30 days" of the claim; about 15 days on average. In Uttar Pradesh the reported experience is 30–45 days after verification in practice, by direct bank transfer, covering the central and state amounts together. You pay the installer the full price, or the loan does, and the government pays you. Nobody legitimately offers to "adjust" the subsidy in the quote. Verde Solaire's customers in Uttar Pradesh have described this sequence themselves: a Noida customer with a 6 kW system wrote that he "was also able to get solar subsidy in record time because of the follow up of the team", and a Varanasi customer thanked a coordinator "who helped in all the processes including documentations for net metering". ## What it does to a UP electricity bill Uttar Pradesh urban domestic tariffs for FY 2026-27 are ₹5.50 (0–150 units), ₹6.00 (151–300), ₹6.50 (301–500) and ₹7.00 (above 500) per unit, plus a fixed charge of ₹110 per kW per month. A 3 kW system generates about 338 units a month, which is roughly what a home with two or three air conditioners uses across the year. Under net metering those units come off the top of the bill, out of the highest slab first, so the energy charge largely disappears and what remains is the fixed charge plus any units the system did not cover. The fixed charge stays, which is why "zero bill" is not a claim to trust. The [bill calculator](/tools/electricity-bill-calculator) works the arithmetic for your own units and sanctioned load. ## Paying for the system The PM Surya Ghar concessional loan is collateral-free, from nationalised banks, at repo rate plus 0.5 percentage points, which was 5.75% on 28 July 2026, over 10 years. Verde Solaire has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans and prepares the paperwork with you. The [solar loan page](/solar-loan) and the [EMI calculator](/tools/emi-calculator) cover the rest. ## Verde Solaire in Uttar Pradesh Verde Solaire's head office is in Sector 47, Noida, with a branch in Chetgunj, Varanasi. Its published installations under PM Surya Ghar in the state include a 2 kW plant in Varanasi in March 2024 and a 5 kW plant in Varanasi in June 2024, alongside home systems in Noida of 4 kW to 20 kW. The company offers a free site evaluation and no-obligation proposal, files the portal application with you on the survey visit, attends the DISCOM inspection and follows the net meter through to activation. The [installation pages for Noida](/solar-installation/noida) and [Varanasi](/solar-installation/varanasi) describe the process for each city. ## Questions **How much solar subsidy do I get in Uttar Pradesh?** ₹15,000 per kW from the state, capped at ₹30,000, on top of the central PM Surya Ghar subsidy of ₹30,000 per kW for the first 2 kW and ₹18,000 for the third. Combined: ₹45,000 on 1 kW, ₹90,000 on 2 kW and ₹1,08,000 on 3 kW or more. **Is the UP state subsidy still available in 2026?** The UP Solar Energy Policy 2022 runs for five years from issue, and news reports of 9 and 10 September 2026 confirm the combined ₹1,08,000 on 3 kW is still being paid. UPNEDA has not published a separate 2026 notice yet. **Do I apply to UPNEDA separately for the state subsidy?** No. You apply once on pmsuryaghar.gov.in, choosing Uttar Pradesh and your electricity distributor. The state top-up is paid alongside the central subsidy; UPNEDA is the nodal agency and its district solar cells help with installation and net metering. **Which electricity board do I deal with in Noida?** Noida city is served by PVVNL, a UPPCL company, as is Ghaziabad. Greater Noida and Greater Noida West are served by NPCL. Varanasi is under PUVVNL. The name at the top of your electricity bill settles it. **When is the subsidy paid in Uttar Pradesh?** After commissioning, the net meter inspection and your bank details on the portal. Officially within 30 days of the claim; September 2026 news reports say 30 to 45 days after verification by direct bank transfer. You pay the installer first. **Can I choose gross metering instead of net metering in UP?** Yes. Under the UPERC rooftop solar regulations of 2019, residential consumers may choose net or gross metering, within the capacity the DISCOM allows on the local transformer. Almost every home chooses net metering. **Is the subsidy the same in Noida and Varanasi?** Yes. The state subsidy is set by the UP policy, not the city, so Noida, Greater Noida, Ghaziabad and Varanasi all get ₹15,000 per kW capped at ₹30,000. Only the electricity board and its net-metering process differ. --- # Varanasi: 2 kW under PM Surya Ghar Source: https://www.verdesolaire.com/projects/varanasi-2-kw-pm-surya-ghar Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 2 kW rooftop solar system at a home in Varanasi, Uttar Pradesh, under PM Surya Ghar: Muft Bijli Yojana, and posted about it on 22 March 2024. The system uses Adani 540 Wp panels and a KSolare inverter. The post says the owner receives a central subsidy of ₹60,000 and a state subsidy of ₹30,000, both paid directly into their bank account. The post describes this as the start of the company's PM Surya Ghar work in Varanasi. Everything here comes from that post and from the policy documents behind the two subsidy figures; what the post did not publish is left out. ## The system as published | Item | Published figure | |---|---| | Location | Varanasi, Uttar Pradesh | | Capacity | 2 kW | | Scheme | PM Surya Ghar: Muft Bijli Yojana | | Panels | Adani, 540 Wp | | Inverter | KSolare | | Central subsidy | ₹60,000 | | Uttar Pradesh subsidy | ₹30,000 | | Paid to | the owner's bank account | | Posted | 22 March 2024 | ## How the two subsidies add up The central subsidy is ₹30,000 per kW for the first 2 kW, so a 2 kW system receives ₹60,000. A third kilowatt would add ₹18,000, up to the cap of ₹78,000, and nothing more above that. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under the UP Solar Energy Policy 2022, which means a 2 kW system already reaches the state cap. Together they come to ₹90,000 for this system, as the post describes. News reports in September 2026 confirm the state top-up is still being paid: combined central-plus-state totals of ₹45,000, ₹90,000 and ₹1.08 lakh for 1, 2 and 3 kW, paid by direct bank transfer 30–45 days after verification. The post also said the owner would get free electricity of up to 300 units a month. That phrase comes from the scheme's publicity: 300 units is what the government expects a roughly 3 kW system to generate, not an allowance credited to the bill. A 2 kW roof in Varanasi generates about 225 units a month, and the net meter sets those units against the ones the house draws from the grid. The [who pays whom](/subsidy/who-pays-whom) guide separates the subsidy, the credit and the bill. ## What a 2 kW system costs today Verde Solaire's July 2025 price list puts a 2 kW system at ₹1,35,000 to ₹1,50,000, including panels, inverter, mounting structure, net metering, installation and warranty. After the same ₹90,000 of subsidy, a Varanasi owner pays ₹45,000 to ₹60,000. The [Varanasi price page](/pricing/varanasi) carries the full ladder from 1 kW to 10 kW, and the [Uttar Pradesh subsidy guide](/subsidy/uttar-pradesh) explains how the state top-up is claimed. ## Net metering in Varanasi Varanasi's electricity distributor is PUVVNL (Purvanchal Vidyut Vitran Nigam Limited), a UPPCL company. Under the UPERC rooftop solar regulations, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits. Verde Solaire's Varanasi branch at Chetgunj files the application and follows the net meter through to activation; the steps are on the [Varanasi net-metering page](/net-metering/varanasi). Mahender Nath Mishra, a Varanasi customer, described the same subsidy and net-metering process: > "Special mention to Mr. Sachin Dubey of the firm who helped in all the processes including documentations for net metering." > > Mahender Nath Mishra ## Equipment and compliance Subsidised systems must use both the modules and the cells must be made in India. A system installed today must also use cells on ALMM List-II, which applies from 1 June 2026; this March 2024 installation predates that rule. The [ALMM List-II explainer](/learn/almm-list-ii-explained) covers what to check on a quote. ## Related projects Verde Solaire posted a [5 kW installation in Varanasi](/projects/varanasi-5-kw) under the same scheme on 1 June 2024, where the subsidy arithmetic changes because the system passes 3 kW. The [Varanasi installation page](/solar-installation/varanasi) covers the survey, the paperwork and the timeline. ## Questions **What subsidy did the 2 kW Varanasi system get under PM Surya Ghar?** Verde Solaire's post of 22 March 2024 says the owner receives a central subsidy of ₹60,000 and an Uttar Pradesh state subsidy of ₹30,000, both paid directly into their bank account, a combined ₹90,000. **Which panels and inverter were used on the Varanasi 2 kW plant?** Adani 540 Wp solar panels and a KSolare inverter. **How much does a 2 kW rooftop system cost in Varanasi?** Verde Solaire's July 2025 price list gives ₹1,35,000 to ₹1,50,000 for 2 kW, including panels, inverter, structure, net metering, installation and warranty. After the ₹60,000 central and ₹30,000 UP subsidy, the estimated amount is ₹45,000 to ₹60,000. **Does PM Surya Ghar give 300 free units a month on a 2 kW system?** No. 300 units is the scheme's expectation for what a roughly 3 kW system generates, not an allowance credited to the bill. A 2 kW system in Varanasi generates fewer units than that, and the net meter sets what it produces against what the house draws from the grid. **Who handles net metering for a rooftop system in Varanasi?** Varanasi is served by PUVVNL, Purvanchal Vidyut Vitran Nigam Limited, a UPPCL company. Verde Solaire's Varanasi branch at Chetgunj files the application and follows the net meter through to activation. --- # Varanasi: 5 kW home system Source: https://www.verdesolaire.com/projects/varanasi-5-kw Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire installed a 5 kW rooftop solar system at a home in Varanasi, Uttar Pradesh, under PM Surya Ghar: Muft Bijli Yojana, and published the installation on 1 June 2024. The customer, Sushma Pandey, later wrote on the company's testimonials page that her electricity bills had noticeably decreased. The post itself is short. It gives the capacity, the city and the scheme, and states that Verde Solaire is registered to provide the subsidy to homeowners who install a plant on their residence. It does not name the modules, the inverter, the yield or the bill before and after, so none of those appear here. ## The system as published | Item | Published figure | |---|---| | Location | Varanasi, Uttar Pradesh | | Rated system power | 5 kW | | Scheme | PM Surya Ghar: Muft Bijli Yojana | | Installer | Verde Solaire, a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh | | Published on | 1 June 2024 | | Modules and inverter | not published | The photo shows the array on a raised structure above the parapet, with the roof still usable underneath. Whether a roof needs that structure or a flush mount is settled at the site survey, which is why the written quote follows the visit rather than the phone call. ## What the subsidy on 5 kW looks like The central subsidy is 60% of the benchmark cost for the first 2 kW and 40% for the part between 2 and 3 kW, capped at 3 kW, so a 5 kW system gets the same ₹78,000 as a 3 kW one. Uttar Pradesh adds ₹15,000 per kW, capped at ₹30,000 per consumer, on top of the central subsidy, under the state's 2022 solar policy. Together that is ₹1,08,000 for this home. The company published its price ladder in July 2025, a year after this installation, so the figures below are the current published range and not this project's cost. A 5 kW system is listed at ₹3,25,000 to ₹3,50,000 before subsidy, which nets to ₹2,17,000 to ₹2,42,000 after the combined subsidy. The [Varanasi pricing page](/pricing/varanasi) sets that against the smaller sizes, and the [Uttar Pradesh subsidy guide](/subsidy/uttar-pradesh) explains how the state top-up is claimed. ## The customer's review Sushma Pandey's review names the capacity and the city, which is how this project is matched to the post. She writes that she recently had a 5 kW solar plant installed in Varanasi by Verde Solaire and is extremely satisfied with the results, and goes on: > "The installation process was seamless, and their team was professional and efficient. My electricity bills have noticeably decreased" > > Sushma Pandey A second Varanasi customer, Mahender Nath Mishra, wrote on the same page that the plant was installed in very quick time and that a member of the firm helped with all the processes, including the documentation for net metering. Net metering in Varanasi runs through Purvanchal Vidyut Vitran Nigam Limited (PUVVNL); the process is on the [Varanasi net-metering page](/net-metering/varanasi). ## Registered vendor, local office Under the scheme, the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, and it runs a branch office at Chetgunj in Varanasi alongside the Noida head office and the Delhi registered office; the addresses are on the [offices page](/offices). Before paying any installer an advance, check the registration yourself: the steps are in [verify your PM Surya Ghar vendor](/learn/verify-your-pm-surya-ghar-vendor). ## What this project shows It followed the company's [2 kW Varanasi installation published on 22 March 2024](/projects/varanasi-2-kw-pm-surya-ghar), which did name its equipment: Adani 540 Wp modules and a KSolare inverter. A 5 kW roof suits a home that uses well above 300 units a month, which is the band the scheme's own sizing guide puts above 3 kW: 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW. If you are in Varanasi and choosing between 3 kW and 5 kW, the [installation page for Varanasi](/solar-installation/varanasi) and the [system size calculator](/tools/system-size-calculator) take your own bills. ## Questions **What did Verde Solaire install in Varanasi under PM Surya Ghar?** A 5 kW rooftop solar system at a home in Varanasi, Uttar Pradesh, published on the company's site on 1 June 2024. The customer, Sushma Pandey, reviewed the installation on the testimonials page. **How much subsidy does a 5 kW home system get in Varanasi?** The central PM Surya Ghar subsidy is capped at ₹78,000 for any system of 3 kW or more, and Uttar Pradesh adds ₹15,000 per kW capped at ₹30,000, so a 5 kW system in Varanasi qualifies for ₹1.08 lakh in total. **What does a 5 kW system cost in Varanasi?** Verde Solaire's published July 2025 range for 5 kW is ₹3,25,000 to ₹3,50,000 before subsidy, which nets to ₹2,17,000 to ₹2,42,000 after the ₹1.08 lakh combined subsidy. The written quote after a site survey is the price. **Which panels and inverter were used on the 5 kW Varanasi system?** The company did not publish the make of the modules or the inverter for this installation. Its 2 kW Varanasi system of March 2024 used Adani 540 Wp modules and a KSolare inverter. **Is Verde Solaire a registered PM Surya Ghar vendor in Varanasi?** Yes. Verde Solaire is a registered PM Surya Ghar vendor in Uttar Pradesh and Delhi, and it has a branch office at Chetgunj in Varanasi. You can check any vendor's registration on pmsuryaghar.gov.in before paying an advance. --- # Verde Solaire Android app Source: https://www.verdesolaire.com/app Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Keep Verde Solaire close at hand on your Android phone. Download the app from [tinyurl.com/verdesolaire](https://tinyurl.com/verdesolaire), or scan the QR code below. It is a direct Android download (an APK file), rather than a Google Play Store app. The app gives customers one place to reach Verde Solaire’s products and services from their phone. ## Download Point your Android camera or Google Lens at the code and follow the prompt, or type the short link into your phone’s browser. Both routes lead to the same download. Your phone may ask you to allow installs from the browser or file manager you used before it can continue. ## Install steps Getting started takes four steps: 1. Scan the QR code, or open the link. 2. Select your email ID when the phone asks for one. 3. Tap Install on the package prompt. 4. Tap Open. If your phone pauses the install at step 3, allow installs from the browser or file manager you used. Android labels this setting differently across versions, but the prompt will usually take you straight to it. ## Not on the Play Store The app is not currently available through the Play Store, so searching there will not find it. When Verde Solaire releases a new version, it will share an updated link or QR code. There is no iPhone version at present. If you use iOS, you can still reach the team by phone, email or WhatsApp through the [contact page](/contact). ## Need help installing it? Get in touch if you need a hand with the download or installation: - Email: sales@verdesolaire.com - Phone: 080 4889 0647 (dial with the leading 0 from India) - WhatsApp: +91 88263 18849 For office details, visit the [offices page](/offices). ## Passing the app on You can share the QR code or link with friends, family and business contacts over WhatsApp, email or social media. The [referral programme](/referral) is a separate scheme for introductions that lead to an order. ## App details The download announcement does not include a feature list, minimum Android version, file size or version number. For the original announcement, visit the [updates page](/updates/android-app). To learn more about Verde Solaire, visit the [about page](/about). ## Questions **Where do I download the Verde Solaire app?** Open https://tinyurl.com/verdesolaire on your Android phone, or scan the QR code on this page with the camera app or Google Lens. The link downloads the app package directly. **Why is the Verde Solaire app not on the Play Store?** The app is a direct Android download (an APK file), rather than a Play Store listing. Android may ask you to allow the download from this source before installing it. **What are the install steps for the Verde Solaire app?** Scan the QR code or open the link, select your email ID when asked, tap Install, then tap Open. **Is there an iPhone version of the Verde Solaire app?** No. Verde Solaire has published an Android app only. iPhone users can reach the company by phone on 080 4889 0647, by email at sales@verdesolaire.com, or by WhatsApp. **Who do I contact if the app will not download or install?** The announcement lists sales@verdesolaire.com, the phone line 080 4889 0647 and WhatsApp on +91 88263 18849 for download and installation problems. --- # Verde Solaire Android app Source: https://www.verdesolaire.com/updates/android-app Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) On 9 February 2026 Verde Solaire published an Android app, downloaded by scanning a QR code or opening a short link, that gives customers access to the company's products and services from a phone. The app is for Android only, and it installs directly from the link rather than through the Play Store. ## How to install it Two routes lead to the same download. Scan the QR code above with your Android camera or with Google Lens, or type the link [tinyurl.com/verdesolaire](https://tinyurl.com/verdesolaire) into the browser on your phone. The published steps are short: 1. Scan the QR code or open the link. 2. Select your email ID when the phone asks for one. 3. Tap Install on the package prompt. 4. Tap Open. The prompt at step 3 is the standard Android screen for an app package (an APK file) that arrives outside the Play Store. It asks you to allow the install from this source once; that is expected for a direct download and is not an error. ## Sharing the app The company asks customers to pass the QR code and the link on to friends, family and business contacts over WhatsApp, email or social media. If you are already a customer, the [referral programme](/referral) is the separate scheme that pays for an introduction that turns into an order. ## If it will not download or install The announcement gives three support contacts for download or installation problems: sales@verdesolaire.com by email, 080 4889 0647 by phone, and +91 88263 18849 on WhatsApp. The general [contact page](/contact) lists the head office in Noida and the other offices. ## What this page does not say The announcement does not describe the app's features screen by screen, name a minimum Android version, or give a file size, so this page does not either. The [app page](/app) carries the same download details in one place and will be updated when the company publishes more. Other dated announcements are on the [updates](/updates) page. ## Questions **How do I download the Verde Solaire app?** Scan the QR code on this page with your Android camera or Google Lens, or open https://tinyurl.com/verdesolaire on your phone. The link downloads the app package directly. **Is the Verde Solaire app on the Google Play Store?** The published download is a direct link to the app package, not a Play Store listing. Android asks you to allow the install from that source before it opens. **Does the Verde Solaire app work on iPhone?** The company has published an Android app only. iPhone users can reach the same team by phone, email or WhatsApp. **Who do I contact if the app will not install?** Email sales@verdesolaire.com, call 080 4889 0647, or message +91 88263 18849 on WhatsApp, the contacts given with the announcement. --- # Verde Solaire fact sheet Source: https://www.verdesolaire.com/about/fact-sheet Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire Private Limited is an ISO 9001:2015 certified rooftop solar company headquartered in Noida, Uttar Pradesh, with a registered office in New Delhi and a branch in Varanasi. It has delivered more than 50 MW of solar projects, is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, and installs residential, housing-society, commercial and institutional systems across Delhi NCR and Uttar Pradesh. This page gathers those facts in one place, each with the page the company published it on, for anyone who needs to describe the business accurately. ## Names and spellings The legal name is Verde Solaire Private Limited, abbreviated Verde Solaire Pvt Ltd on invoices. The brand is two words, Verde Solaire, both capitalised; the second word ends in "aire". The company is formerly Sirius Electric, a name that still appears on some older customer reviews and listings. It is trading since 2010. The website is www.verdesolaire.com. The company's GSTIN 09AAGCV4977Q1Z6 is printed on its contact page; the 09 prefix is the Uttar Pradesh state code, which matches the Noida head office. Punit Singh, Director, is the director named in the company's published commentary. ## Credentials and registrations - ISO 9001:2015 certified. - more than 50 MW of solar projects delivered, and a team with combined experience of more than 2,000 MW. - a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Delhi's vendor lists are linked from the [Delhi Solar Portal](https://solar.delhi.gov.in/page/empaneled-vendors); the [national portal](https://pmsuryaghar.gov.in) lists registered vendors by state and district. - registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. UHBVN and DHBVN are Haryana's two electricity boards, IPGCL is Delhi's generation company, BRPL is BSES Rajdhani and CEL is Central Electronics Limited. - an authorised solar solutions partner of Luminous, and certified by Vikram Solar as a trusted quality EPC integrator. - tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, and registered with Indian Oil for solar plants at petrol pumps. - 4.3 stars from 38 Google reviews. The company has not published its PM Surya Ghar vendor codes for Delhi or Uttar Pradesh, its workmanship or inverter warranty terms, or its opening hours, so none of those appear here. The [warranty and after-sales page](/about/warranty-and-after-sales) explains what is documented. ## What the company does Verde Solaire designs, supplies, installs and commissions grid-connected rooftop solar. Its published range is home systems from 1 kW to 50 kW and commercial installations up to 16 MW, with subsidy assistance for eligible customers in Delhi, Haryana and Uttar Pradesh. Every enquiry starts with a free site evaluation and no-obligation proposal. The [how we work page](/about/how-we-work) describes the process from survey to net-metering approval, and the [solutions hub](/solutions) lists each segment. Panels the company has published using are Adani Solar, Vikram Solar, Waaree, Emmvee and CEL; inverters are Delta, Schneider, KSolare and Havells. Which brand went on which site is recorded on the [equipment page](/equipment) and on each project page. ## Largest published projects - [Jindal Prefab, Dharuhera: 430 kW](/projects/jindal-prefab-dharuhera-430-kw), Adani panels and Havells inverters, financed. - [Jama Corporation, Kanpur: 200 kW](/projects/jama-corporation-kanpur-200-kw), Waaree panels and Delta string inverters. - [Patna division: 170 kW](/projects/patna-division-170-kw), won on tender. - [C-MET Pune: 147 kW](/projects/c-met-pune-147-kw), delivered for CPWD with Emmvee panels. - [Marwar Carpets, Panipat: 110 kW](/projects/marwar-carpets-panipat-110-kw), Vikram Solar panels and Schneider inverters. Residential work is documented on the [projects hub](/projects), from a 2 kW PM Surya Ghar system in Varanasi to a 30 kW home plant on a custom structure. ## Offices **Head office, Noida.** D-2, 2nd Floor, Sector 47, Noida, Uttar Pradesh 201303. **Registered office, New Delhi.** C-213, Basement, Block C, Sarvodaya Enclave, New Delhi 110017. **Branch office, Varanasi.** Laxmi Niwas, Chetgunj, Varanasi, Uttar Pradesh. The [offices page](/offices) has maps and directions for each. ## Contact - Phone: 080 4889 0647 (dial with the leading 0 from India) - WhatsApp: +91 88263 18849 - Email: info@verdesolaire.com; sales enquiries to sales@verdesolaire.com - Web: www.verdesolaire.com - Social: [Facebook](https://www.facebook.com/verdesolaire), [Instagram](https://www.instagram.com/solaireverde/), [X](https://twitter.com/verdesolaire) - Customer app: see the [Android app page](/app) ## Boilerplate Copy this paragraph as it stands; every claim in it is documented above. Verde Solaire Private Limited is an ISO 9001:2015 certified rooftop solar company headquartered in Noida, with a registered office in New Delhi and a branch in Varanasi. It has delivered more than 50 MW of solar projects, is a registered PM Surya Ghar: Muft Bijli Yojana vendor in Delhi and Uttar Pradesh, and installs systems from 1 kW homes to multi-megawatt commercial rooftops. The company is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST, is an authorised solar solutions partner of Luminous, and is certified by Vikram Solar as a quality EPC integrator. Its team carries combined experience of more than 2,000 MW. Contact: 080 4889 0647, info@verdesolaire.com, www.verdesolaire.com. ## Logo Download the [Verde Solaire logo](/images/brand/67be8235353af16b6735b39c.jpg) for editorial use. Please do not alter the mark or the colours. For a different format, write to info@verdesolaire.com. ## Questions **What is Verde Solaire's legal name?** Verde Solaire Private Limited, GSTIN 09AAGCV4977Q1Z6. The company was earlier known as Sirius Electric. The brand is written as two words: Verde Solaire. **Where is Verde Solaire based?** The head office is at D-2, 2nd Floor, Sector 47, Noida 201303. The registered office is at C-213, Basement, Block C, Sarvodaya Enclave, New Delhi 110017, and there is a branch at Laxmi Niwas, Chetgunj, Varanasi. **Is Verde Solaire a registered PM Surya Ghar vendor?** Yes, in both Delhi and Uttar Pradesh. The Delhi Solar Portal links to each DISCOM's empanelled vendor list, and the national portal at pmsuryaghar.gov.in lists vendors by state and district. **How much solar has Verde Solaire installed?** The company reports more than 50 MW of solar projects delivered, with a team whose combined experience exceeds 2,000 MW. Its largest published project is a 430 kW rooftop plant at Jindal Prefab, Dharuhera. **How do I contact Verde Solaire?** Phone 080 4889 0647 (dial with the leading 0 from India), WhatsApp +91 88263 18849, or email info@verdesolaire.com. Sales enquiries go to sales@verdesolaire.com. **Who is the director of Verde Solaire?** Punit Singh is the Director, as named in the company's own published commentary on the ALMM deadline extension. --- # Verde Solaire vs Adani Solar Source: https://www.verdesolaire.com/compare/verde-solaire-vs-adani-solar Updated: Sun Sep 20 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Adani Solar manufactures solar panels. Verde Solaire is a Delhi NCR engineering, procurement and construction (EPC) company that installs rooftop systems, and on three published projects it has installed Adani's own panels: a 10 kW bifacial system in Greater Kailash, New Delhi, a 2 kW system in Varanasi, and a 430 kW factory plant in Dharuhera, Haryana. The two are not really rivals for a homeowner's decision. One makes the module that goes on the roof; the other surveys the roof, chooses the modules, installs the system and files the subsidy paperwork. Verde Solaire is ISO 9001:2015 certified and has delivered more than 50 MW of solar projects. ## What Adani Solar publishes about itself Adani Solar's site describes a manufacturing capacity of "4 GW cells & 10 GW of modules and 2 GW of ingots & wafers", cumulative shipments of "over 20 GW of modules", and calls itself "India's 1st and largest vertically integrated solar PV manufacturer". It cites a "Top performer 9 years in a row" ranking from an independent module reliability testing programme, a Bloomberg Tier 1 listing, and 6th place globally in Wood Mackenzie's Global Solar Photovoltaic Module Manufacturer Rankings for 2026. Its parent, Adani Group, is described as having a market capitalisation of over USD 200 billion, and its main manufacturing campus is said to span more than 800 acres. On product, the site lists a PRIDE series (MonoPERC, 610 to 650 Wp, described for "excellent low-light performance"), a SHINE series (MonoPERC, 520 to 545 Wp) and a SHINE TOPCon series with a stated module efficiency of 22.3%, plus an Elan Bifacial line. The MonoPERC Shine product page gives a wattage range of 540 to 560 Wp and an efficiency of up to 21.22%, with a P-type PERC cell on an M10 gallium-doped wafer. The site does not publish a product or performance warranty in years, an ISO or IEC certification list, or an ALMM List-II status for a specific panel, and does not describe a dealer network, an installer, or a price for a home rooftop system. Those questions belong to whoever installs the panel, not to the manufacturer's own pages. ## Where Verde Solaire has installed Adani panels Verde Solaire's published projects using Adani modules span a home rooftop, a smaller PM Surya Ghar system and a factory plant. The [Greater Kailash, Delhi project](/projects/greater-kailash-delhi-10-kw-bifacial) is a 10 kW home system built with 530 Wp Adani bifacial modules on a raised frame, so light reaches both faces of the panel. The owner, Jai Kumar Manghnani, wrote on Verde Solaire's testimonials page: "We had agreed for 530W Mono Perc Adani solar panels for my solar energy system, but they installed a better bifacial solar panel of Adani without charging anything extra from us." The [Varanasi project](/projects/varanasi-2-kw-pm-surya-ghar) is a 2 kW home system under PM Surya Ghar, published in March 2024, using 540 Wp Adani panels with a KSolare inverter; the post describes it as the start of Verde Solaire's PM Surya Ghar work in the city. The [Dharuhera, Haryana project](/projects/jindal-prefab-dharuhera-430-kw) is a 430 kW plant on the Jindal Prefab factory roof, built with Adani modules and Havells inverters carrying a published 10-year warranty on the inverters, and financed almost entirely through a SIDBI loan repaid over seven years out of the factory's bill savings. ## What Verde Solaire brings beyond the panel brand A panel is one part of a rooftop system. Verde Solaire is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh, installs home systems from 1 kW to 50 kW from offices in Noida, New Delhi and Varanasi, and names the make and model of every component in its quote. Its recent Delhi and Noida installations have used Adani and Vikram Solar modules alongside KSolare and Delta inverters, chosen per roof rather than sold from one manufacturer's catalogue; it is also certified by Vikram Solar as a trusted quality EPC integrator. Every enquiry starts with a free site evaluation and no-obligation proposal, and the same team that surveys the roof installs the system, files the PM Surya Ghar application and follows the net meter through. ## The comparison table ## How to choose There is no real choice between the two companies, because they answer different questions. Which panel goes on the roof is a manufacturer question, and Adani's own pages set out its product range and manufacturing scale in detail. Who surveys the roof, installs the system, gets the subsidy paid and follows the net meter to activation is an installer question, and that is where Verde Solaire's published projects, including the three built with Adani panels, show what the company has actually done. If you want Adani panels specifically, say so when you request a quote; Verde Solaire has fitted them on a bifacial home system, a smaller PM Surya Ghar installation and a large factory plant. If you are open to the brand, ask instead for the module and cell model numbers in the written quote and their ALMM List-II status, since the subsidy rule applies equally to both the modules and the cells must be made in India. The [ALMM List-II guide](/learn/almm-list-ii-explained) explains what to check the numbers against, and the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows how to confirm any installer on the national portal before paying an advance. ## Questions **Is Adani Solar a competitor to Verde Solaire?** No, not in the way two installers compete. Adani Solar manufactures panels. Verde Solaire is a Delhi NCR engineering, procurement and construction (EPC) company that surveys roofs, installs systems and files subsidy paperwork, and it has used Adani's own panels on published projects in Greater Kailash, Varanasi and Dharuhera. One makes the module; the other puts it on the roof. **What does Adani Solar publish about its manufacturing scale?** Its about-us page states manufacturing capacity of 4 GW of cells, 10 GW of modules and 2 GW of ingots and wafers, cumulative shipments of over 20 GW of modules, and calls itself India's first and largest vertically integrated solar photovoltaic manufacturer. It also cites a nine-year top-performer streak in independent module reliability testing, a Bloomberg Tier 1 listing, and 6th place globally in Wood Mackenzie's 2026 module manufacturer ranking. **Has Verde Solaire installed Adani solar panels?** Yes, on at least three published projects: a 10 kW bifacial system in Greater Kailash, New Delhi with 530 Wp Adani modules; a 2 kW system in Varanasi with 540 Wp Adani modules and a KSolare inverter; and a 430 kW factory plant in Dharuhera, Haryana with Adani modules and Havells inverters, financed largely through a SIDBI loan. **Does Adani Solar publish a warranty for its home panels?** Its MonoPERC Shine product page states wattage of 540 to 560 Wp and an efficiency of up to 21.22%, but does not list product or performance warranty years, ISO or IEC certification, or ALMM List-II status for that panel. Ask for warranty years and the ALMM listing in writing, whichever installer you use. **Who installs Adani panels for a home in Delhi or Noida?** Adani Solar's pages describe manufacturing, not a residential sales network, and do not list home installers. Verde Solaire is a registered PM Surya Ghar vendor in Delhi and Uttar Pradesh that buys modules from several manufacturers, Adani included, and installs, surveys and files the subsidy application. **Should I ask my installer for Adani panels specifically?** You can ask, but the subsidy rule is the same whichever brand a vendor uses: the modules and cells must be made in India, and from 1 June 2026 the cells must appear on ALMM List-II. Verde Solaire's recent installations have used Adani, Vikram Solar, Waaree, Emmvee and CEL modules, chosen per roof; ask for the model number in the written quote rather than the brand name alone. --- # Verde Solaire vs SolarSquare in Delhi NCR Source: https://www.verdesolaire.com/compare/verde-solaire-vs-solarsquare Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) SolarSquare is the larger company by every figure on its own website, and it publishes guarantees that Verde Solaire does not. Verde Solaire is a Delhi NCR engineering, procurement and construction (EPC) company that is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh; it works from offices in Noida, New Delhi and Varanasi, names the make and model of every component in its quote, and builds custom structures for awkward roofs. Which of those matters more depends on your roof and on what you want from the company after commissioning. This page puts the two side by side. SolarSquare's side is quoted as it appears on its Delhi and Noida pages, and Verde Solaire's side comes from its own published facts. Where a claim could not be found on a company's pages the table says so. ## What SolarSquare says about itself The Noida page lists "10+ Years of Experience", "50,000+ Homes Solarised", "200MW+ Installation Experience" and a presence in "31 Cities across 10 States". It calls SolarSquare "the #1 solar panel installation company in the entire Uttar Pradesh, in terms of number of solar installations, as listed on the PM Surya Ghar Muft Bijli Yojana National Portal, as of 21st April 2026", and gives the portal figures behind that claim: 18,960 kWp across 4,472 properties in Uttar Pradesh and 1,008 kWp across 180 properties in Gautam Buddha Nagar, the district that contains Noida. The Delhi page makes the equivalent claim for Delhi and gives two portal counts: 2,881 kWp across 617 properties as of 20 April 2026 and 3,704 kWp across 806 properties as of 3 August 2026. It also states "2,000+ solar plants in Delhi", a larger number than the portal count, which the page does not reconcile; the portal counts subsidised residential systems, so the two figures may measure different things. Both pages carry a Google rating claim. This page uses no review-site ratings for either company, so it is not repeated here. On products, both pages describe a mounting structure called WindPro Mount, "tested for 170 kmph storms" and "Approved by IIT Bombay", with an 80-micron hot-dip galvanised coating and a "99.91%" storm-safety record over the last two years. On after-sales, they describe a four-year plan with a minimum of 36 scheduled visits, remote monitoring, a monitoring app on Google Play, panel cleaning and on-call support. On guarantees, the GoodZero plan promises a generation guarantee under which SolarSquare pays eight rupees for every unit the system produces below its estimate, no repair or replacement cost, and a one-year water-leakage warranty with a stated rupee value. On money, the Delhi page publishes a price table dated 7 August 2026 for 2, 3, 4, 5 and 10 kW systems, before and after subsidy, and a 25-year savings table built on "annual tariff escalation of 3% and annual plant degradation rate of 1%". The Noida page publishes an after-subsidy table dated 21 April 2026. Both say prices are subject to change. Financing is described as "zero initial out-of-pocket down payment", loan approval within 24 hours and a repayment period of six months to five years. ## Where SolarSquare is ahead Scale, and the evidence for it. SolarSquare publishes national portal counts with dates, which is the most checkable kind of installation claim there is. Verde Solaire's more than 50 MW of solar projects includes commercial and industrial plants of up to commercial installations up to 16 MW, so its residential count is smaller than the megawatt figure suggests, and it has published no portal count. Product guarantees. A generation guarantee with a per-unit payout, a no-cost repair promise and a leakage warranty are written commitments that Verde Solaire has not published. Its July 2025 price posts state 25-year performance warranties on all three panel types, and the company has not published inverter or workmanship warranty years or a scheduled-visit plan. If you want a service contract with a visit count on paper, SolarSquare's pages offer one and Verde Solaire's do not. A dated, per-capacity price. Both companies publish prices, which is rarer than it should be. SolarSquare's tables are dated August and April 2026; Verde Solaire's ranges were published in July 2025. The [Delhi](/pricing/delhi) and [Noida](/pricing/noida) price pages show those ranges and the subsidy arithmetic under them, and the written quote after a survey is the price. ## Where Verde Solaire differs Local offices. Verde Solaire's head office is in Sector 47, Noida, with a branch in New Delhi and one in Varanasi. SolarSquare's Delhi and Noida pages give only its Mumbai head office address; whether it has a service centre in Delhi NCR is not stated on its pages. When a net meter stalls or an inverter trips, the distance to the nearest office is a practical matter. Named components. Verde Solaire's quote names the make and model of the panel, the inverter and the structure. Its recent Delhi and Noida installations used Adani and Vikram Solar modules of 530 to 545 Wp with KSolare and Delta inverters; it is certified by Vikram Solar as a trusted quality EPC integrator and an authorised solar solutions partner of Luminous. SolarSquare's pages describe its panels as ALMM-approved and made in India, which is the subsidy rule either way, but name no panel or inverter manufacturer. Ask for model numbers from whichever company you choose; the [ALMM List-II guide](/learn/almm-list-ii-explained) explains what to check them against. Custom structures. A Janakpuri customer described his 10 kW system as "Vikram solar panels and KSolare inverters with an elevated module mounting structure". Elevated structures, split roofs and builder floors are designed per site by Verde Solaire's own engineers. SolarSquare's pages describe one standard mount, the six-foot WindPro variant, with published wind testing behind it; whether it builds non-standard structures is not stated. Commercial range. Verde Solaire installs home systems from 1 kW to 50 kW and commercial plants up to commercial installations up to 16 MW, with published projects at a 430 kW factory in Dharuhera and a 200 kW plant in Kanpur. SolarSquare's Delhi and Noida pages are about homes; the reader with a factory roof is on a different page. Registrations. Beyond PM Surya Ghar, Verde Solaire is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations and holds ISO 9001:2015. SolarSquare states "DISCOM-approved" and its portal listing, and cites the IIT Bombay approval for its mount. ## Subsidy and net metering, side by side Both companies say they file the PM Surya Ghar application. The rule is the same for both: the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in, and the central subsidy is ₹78,000 for a system of 3 kW or more, with Delhi adding ₹26,000 per kW capped at up to ₹78,000 and Uttar Pradesh adding ₹15,000 per kW capped at ₹30,000 per consumer, on top of the central subsidy. SolarSquare's Noida page states the Uttar Pradesh totals correctly. On net metering the pages diverge in detail rather than in claim. SolarSquare's Noida page says net metering exists and that it helps, but does not name the electricity board; Noida city is served by PVVNL (Paschimanchal Vidyut Vitran Nigam Limited, a UPPCL company), and Greater Noida by NPCL (Noida Power Company Limited). Verde Solaire's customers have written about the filing itself: a Noida owner of a 6 kW system "was also able to get solar subsidy in record time because of the follow up of the team", and the Janakpuri customer quoted above noted that his net metering "was delayed by the Discom", a reminder that the board's timeline belongs to the board. In Delhi the Delhi Electricity Regulatory Commission (DERC) now requires a connection within 10 days for systems up to 10 kW. The [Delhi net-metering page](/net-metering/delhi) covers the process for each board. ## The comparison table ## How to choose between them If a written generation guarantee, a scheduled-visit plan and a national brand's scale are what you want, SolarSquare's pages offer all three and Verde Solaire's do not. If you want the company that surveyed your roof to be the one that installs it, names the equipment, files the paperwork from an office you can drive to, and designs a structure for a roof that is not flat and empty, Verde Solaire is built for that. A 5 kW system with a raised structure over a water tank is a different job from a 3 kW system on a clear terrace, and the pages of both companies are honest about which job they are describing. Either way, do the same four checks. Confirm the vendor on pmsuryaghar.gov.in; the [vendor check guide](/learn/verify-your-pm-surya-ghar-vendor) shows where to look. Get panel, cell and inverter model numbers in the quote. Get gross price, subsidy and net payable as three lines. Get warranty years and who services them in writing. The [national brand or local installer](/compare/national-brand-vs-local-installer) page turns these into a longer framework, and the [SolarSquare alternatives](/compare/solarsquare-alternatives-delhi-noida) page lists what else to look at in Delhi and Noida. Verde Solaire offers a free site evaluation and no-obligation proposal. The survey is where the roof, the shadow and the structure get decided, and the number that comes after it is the number you pay. ## Questions **Is SolarSquare bigger than Verde Solaire?** Yes, on every figure it publishes. SolarSquare's Delhi and Noida pages claim 50,000-plus homes, 200 MWp-plus installed and a presence in 31 cities across 10 states, with PM Surya Ghar portal counts of 3,704 kWp across 806 Delhi properties (3 August 2026) and 18,960 kWp across 4,472 Uttar Pradesh properties (21 April 2026). Verde Solaire has published more than 50 MW of solar projects, including commercial plants, and home systems from 1 kW to 50 kW. **What does SolarSquare publish for a 3 kW system in Delhi and Noida?** Its Delhi page, dated 7 August 2026, shows a 3 kW on-grid system at about ₹2.4 lakh before subsidy and about ₹1.32 lakh after. Its Noida page, dated 21 April 2026, shows about ₹1.17 lakh after subsidy. Both pages say prices are subject to change. Verde Solaire's published July 2025 range for 3 kW is ₹1,99,000 to ₹2,10,000 before subsidy, which nets to ₹43,000 to ₹54,000 in Delhi and ₹91,000 to ₹1,02,000 in Noida after the ₹78,000 central subsidy plus the state subsidy, ₹78,000 in Delhi and ₹30,000 in Uttar Pradesh. **What guarantees does SolarSquare offer that Verde Solaire does not?** SolarSquare's pages describe a generation guarantee under which it pays ₹8 for every unit the system produces below its estimate, no repair or replacement cost under its GoodZero plan, a one-year water-leakage warranty stated as worth ₹1 lakh, and a four-year after-sales plan with at least 36 scheduled visits and remote monitoring. Verde Solaire has published none of these; its July 2025 price posts state 25-year performance warranties on panels, and inverter and workmanship terms should be asked for in writing. **Does either company have an office in Delhi or Noida?** Verde Solaire's head office is at D-2, Sector 47, Noida, with a branch in New Delhi and one in Varanasi. SolarSquare's Delhi and Noida pages list only its Mumbai head office; no Delhi or Noida address appears on those pages. **Are both companies registered PM Surya Ghar vendors?** Verde Solaire states it is a registered vendor in Delhi and Uttar Pradesh. SolarSquare states it is listed on the PM Surya Ghar national portal and DISCOM-approved, and cites portal installation counts for Delhi and Uttar Pradesh. Check either company yourself on pmsuryaghar.gov.in before paying an advance. **Which company names the panel and inverter in the quote?** Verde Solaire's quotes name the make and model of every component; its recent Delhi and Noida installations used Adani and Vikram Solar modules with KSolare and Delta inverters. SolarSquare's Delhi and Noida pages name its own mounting structure and describe panels as ALMM-approved and made in India, but name no panel or inverter manufacturer. --- # Verde Solaire vs Tata Power Solar Source: https://www.verdesolaire.com/compare/verde-solaire-vs-tata-power-solar Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire and Tata Power Solar are two different kinds of solar company. Tata Power Solar manufactures modules and cells and sells rooftop systems across India through channel partners; Verde Solaire is a Delhi NCR engineering, procurement and construction (EPC) firm that buys modules from several makers, surveys the roof itself and does the installation, subsidy filing and net metering with its own team. Verde Solaire is ISO 9001:2015 certified, has delivered more than 50 MW of solar projects and is a registered PM Surya Ghar vendor in both Delhi and Uttar Pradesh. Tata Power Solar's own pages claim 1,900 MW of rooftop installations and over 20,000 residential customers. The comparison below uses each company's published information and focuses on the things that help you shortlist an installer: capability, local service, equipment, process and written terms. ## Side by side ## What Tata Power Solar says about itself Tata Power Solar's rooftops page describes the company as "pioneers in India's rooftop domain for more than 30 years, having commissioned our first solar installation in 1991", claims "1900 MW++" of cumulative rooftop installations, "350+ sales & service channels partners across India" and "24X7 Remote monitoring for performance analysis & real-time service support". It cites Bridge to India for the title "India's No. 1 Solar Rooftop EPC player" eight years running and promises "Upto 40% Cheaper Electricity". Tata Power Solar's residential page lists a grid-tie inverter range from 1 kVA to 10 kVA and two off-grid power conditioning units, states "20,000+ residential systems commissioned", and offers "24X7 service support, for complete peace of mind". The manufacturing page describes "670MW for modules and 530MW of cells", mono cells of 182 mm, "over 3GW of modules shipped globally in the past 33 years" and a list of ISO and IEC certifications. The dealer network page says products are "available through an extensive network of 1000+ channel partners present across India and its neighbouring countries". The financing page promises "Collateral Free Options", "Low Down Payment" and "Instant EMI options". On history, scale, manufacturing and monitoring, Tata Power Solar is ahead of every local installer in Delhi NCR. Verde Solaire's record of more than 50 MW of solar projects is smaller by comparison. The pages do not state a residential price, warranty terms in years, installation timeline, PM Surya Ghar registration, or whether the channel partner or Tata Power Solar itself installs and services a home. Those are the questions to ask a partner in writing before you pay an advance. ## What Verde Solaire has published Verde Solaire, formerly Sirius Electric, installs home systems from 1 kW to 50 kW from offices in Noida, New Delhi and Varanasi. It is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations and offers subsidy assistance for eligible customers in Delhi, Haryana and Uttar Pradesh. Its price list is public: a 3 kW system is ₹1,99,000 to ₹2,10,000 before subsidy on the July 2025 list, netting to ₹43,000 to ₹54,000 in Delhi and ₹91,000 to ₹1,02,000 in Noida once the central and state subsidy are applied. The price posts state 25-year performance warranties on all three panel types. It has tie-ups with SIDBI, SBI and other NBFCs for collateral-free solar loans, is certified by Vikram Solar as a trusted quality EPC integrator and an authorised solar solutions partner of Luminous, and every enquiry starts with a free site evaluation and no-obligation proposal. Verde Solaire has not published a remote monitoring service, has no manufacturing, and its inverter and workmanship warranty years appear on the written quote rather than on a web page. That is the honest limit of what this side of the comparison can claim. ## Manufacturer-plus-EPC or local EPC: what changes for you **Which modules go on your roof.** A manufacturer's channel sells that manufacturer's modules; with Tata Power Solar you get Tata modules and, on the residential page, Tata inverters. A local EPC picks from several makers per roof. Verde Solaire's published installations have used Adani, Vikram Solar, Waaree, Emmvee and CEL modules with Delta, Schneider, KSolare and Havells inverters. A Greater Kailash customer, Jai Kumar Manghnani, wrote: "We had agreed for 530W Mono Perc Adani solar panels for my solar energy system, but they installed a better bifacial solar panel of Adani without charging anything extra from us." The subsidy rule is the same for both: both the modules and the cells must be made in India, and from 1 June 2026 the cells must be on ALMM List-II. Ask either company for module and cell model numbers in the quote. **Who you contract with.** Through a dealer network the partner is usually the company on the contract, and Tata Power Solar's pages do not describe how installation and after-sales are divided. With a local EPC the company that measures the roof is the company that installs, files the portal application and follows the electricity board. Brij Lal Bhardwaj in Sector 25, Noida wrote that the team "did the complete installation including documentations and liasoning for installation of net meter"; L. R. Singh, also in Noida, "was also able to get solar subsidy in record time because of the follow up of the team of Verde Solaire". **Customisation.** Awkward roofs, elevated structures and shadow from a water tank are decided by an engineer standing on the roof. K. K. Sharma in Chattarpur wrote, "I was highly impressed with their shadow analysis process." A national brand's partner may do the same; the brand's pages do not say. **Reach and monitoring.** Here the manufacturer wins outright. Tata Power Solar publishes a pan-India dealer network, 24x7 remote monitoring and doorstep service. Verde Solaire serves Delhi NCR and eastern Uttar Pradesh and has published no monitoring service of its own; what you get is the inverter maker's app and a phone number that customers describe as responsive, in Sohail Dhir's words "very prompt in responding to queries if any". ## Tata Power-DDL is not Tata Power Solar Homeowners in North and North-West Delhi often assume their electricity board and the panel brand are one company. Tata Power-DDL is a distribution licensee (DISCOM): it supplies power, sanctions your load and publishes the net-metering application and manual on tatapower-ddl.com. Tata Power Solar is the manufacturer and EPC business. Being a Tata Power-DDL consumer does not tie you to Tata Power Solar, because under the scheme the installer must be a vendor registered on the national portal, and you choose the vendor on pmsuryaghar.gov.in. The Delhi Electricity Regulatory Commission (DERC) timeline of 10 days for a net-metering connection up to 10 kW applies to every Delhi board and every installer. The [Tata Power-DDL net-metering page](/net-metering/board/tata-power-ddl) walks through the application. ## The rules that do not change with the brand The central subsidy is capped at ₹78,000 for 3 kW and above whoever installs. Delhi adds a state subsidy capped at up to ₹78,000 and Uttar Pradesh ₹30,000 per consumer, on top of the central subsidy. Both companies' systems must clear the same made-in-India and ALMM List-II tests to qualify, and the net meter is issued by your DISCOM on the DISCOM's clock. Navin Verma in Janakpuri described a 10 kW installation on Vikram modules and KSolare inverters as quick and well made, and added that the net metering was held up at the electricity board's end. That delay would have been the same with any installer. The [subsidy guide](/subsidy) and [who pays whom](/subsidy/who-pays-whom) explain the money flow. ## Which one fits you Choose Tata Power Solar, or one of its partners, if a manufacturer's name on the panel, a pan-India network and a published 24x7 monitoring service matter most, and you are comfortable that the price, warranty years and installer identity come from the partner rather than the website. Choose Verde Solaire if you want a choice of module brands, a price you can read before the phone call, and one company answerable for the survey, the installation, the subsidy claim and the net meter. The [Delhi](/pricing/delhi) and [Noida](/pricing/noida) price pages carry every capacity, and the [national brand or local installer](/compare/national-brand-vs-local-installer) page turns this comparison into a checklist for any company you shortlist. ## Questions **What is the difference between Verde Solaire and Tata Power Solar?** Tata Power Solar makes its own modules and cells and sells rooftop systems through a network of channel partners across India. Verde Solaire is a local engineering, procurement and construction company in Delhi NCR that buys modules from several manufacturers, surveys the roof itself, installs, and follows the subsidy and net meter through. Its prices are published; Tata Power Solar's residential pages show no price. **Are Tata solar panels better than the panels Verde Solaire uses?** We cannot say from published material. Tata Power Solar's manufacturing page lists ISO 9001, 14001 and 45001 and IEC 61215, 61730, 61701, 62716 and 60068 certifications. Verde Solaire's installations have used Adani, Vikram Solar, Waaree, Emmvee and CEL modules with 25-year performance warranties as stated in its July 2025 price posts. For a subsidised system both must use Indian-made modules and cells, and ALMM List-II cells from 1 June 2026. **Is Tata Power Solar the same company as Tata Power-DDL?** No. Tata Power-DDL is a Delhi electricity board that supplies North and North-West Delhi and runs net metering for its own consumers. Tata Power Solar is a manufacturer and EPC company. A Tata Power-DDL consumer may use any vendor registered on the PM Surya Ghar portal, Verde Solaire included. **Who installs a Tata Power Solar system in Delhi or Noida?** Its dealer locator says products are available through 1000-plus channel partners and lets you search by state and city. Its pages do not say whether the partner or Tata Power Solar itself installs and services a home system, so ask the partner in writing who signs the contract and who handles the warranty. **Does Verde Solaire publish a price and Tata Power Solar not?** Verde Solaire's July 2025 posts give ₹1,99,000 to ₹2,10,000 for a 3 kW system before subsidy, which nets to ₹43,000 to ₹54,000 in Delhi and ₹91,000 to ₹1,02,000 in Noida after the ₹78,000 central subsidy plus the state subsidy, ₹78,000 in Delhi and ₹30,000 in Uttar Pradesh. Tata Power Solar's pages show no residential price and direct you to a phone line or enquiry form. **Which company should I pick for a 3 kW home system in Delhi NCR?** If you want a manufacturer's brand, a pan-India network and published 24x7 remote monitoring, Tata Power Solar or one of its partners fits. If you want a choice of module brands, a public price, and the same company surveying, installing and following the net meter, Verde Solaire fits. The subsidy, the DISCOM timeline and the equipment rules are identical whichever you choose. --- # Warranty and after-sales support Source: https://www.verdesolaire.com/about/warranty-and-after-sales Updated: Fri Sep 18 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Verde Solaire's panels carry 25-year performance warranties on all three panel types, as stated in the company's July 2025 price posts for Delhi and Noida. Inverter warranties are the manufacturer's: on the published 430 kW plant at Dharuhera, the Havells inverters came with a 10-year warranty, and on a home system the years depend on the make and model named in your quote. After the installation, support means an engineer you can reach by phone or WhatsApp, a site visit when a fault needs one, and help with the electricity board if the net meter or the subsidy stalls. This page states only what Verde Solaire has published. Where a figure has not been published, such as the number of years of workmanship cover or maintenance included, the page says so and points you to the written quote, which is the document that binds. ## What the warranties cover A solar system has three layers of warranty, and they are honoured by different people. **Panels.** The performance warranty is the manufacturer's promise that the panel will still produce at least a stated share of its rated output after a set number of years. Verde Solaire's published range is 25-year performance warranties on all three panel types: mono PERC, bifacial and TOPCon. The exact output curve is printed on the datasheet of the model in your quote, which is why every quote from Verde Solaire names the panel make and model rather than "Tier 1 panels". Recent installations used Adani and Vikram Solar modules; Verde Solaire is certified by Vikram Solar as a trusted quality EPC integrator. **Inverters.** The inverter is the component most likely to need attention inside the life of the system, and its warranty is shorter than the panels'. It is the manufacturer's warranty. The published example is the Dharuhera factory plant, where the Havells inverters carried 10 years. Residential systems in the company's posts and testimonials used KSolare and Delta inverters; ask for the warranty years of the model quoted to you and keep the datasheet with your invoice. The [inverter guide](/equipment/solar-inverters) explains what the makes mean. **Structure, wiring and workmanship.** Verde Solaire has not published a number of years for this layer, so this page does not state one. The written quote should. If it does not, ask before you pay, and read [before you pay the advance](/learn/before-you-pay-the-advance) for the other items that belong in writing. ## Who honours which warranty The manufacturer honours the panel and inverter warranties. The installer's job is the part you cannot do from home: diagnosing which component has failed, logging the claim with the manufacturer, arranging the replacement and fitting it. An installer that is still trading and still answering the phone is therefore worth more than a long warranty from a company that has moved on. Verde Solaire's earliest surviving customer accounts are from 2017: S. C. Garg, whose system at his Greater Kailash residence in New Delhi had, in his words, been "working continuously without a single day breakdown since 2017", and who describes the plant as maintenance free. ## What after-sales looks like in practice The company's published pages describe after-sales support as part of every installation, from consultation and site visit through feasibility, approvals, installation and maintenance. In practice it works like this: - **Phone and WhatsApp.** The published numbers are 080 4889 0647 (dial with the leading 0 from India) and +91 88263 18849 on WhatsApp. The company's own contact page tells customers to use WhatsApp for the faster response when something is urgent. - **Engineer diagnosis first.** Most inverter questions are answered from a photo of the display or a screenshot of the monitoring app; a site visit follows when the fault needs hands on the roof. - **Electricity board follow-up.** If the net meter has not been installed, the bill has not started showing export, or the subsidy has not arrived, the same team that filed the application follows it up with BSES Rajdhani, BSES Yamuna, Tata Power-DDL, PVVNL, NPCL or PUVVNL. See [installed but not activated](/learn/installed-but-not-activated) for what each delay usually means. Customers describe the same thing. Sohail Dhir, with a home system in New Delhi, wrote that Verde Solaire "is very prompt in responding to queries if any". Aurbind Sharma, with a 7 kW system in Sector 41, Noida, wrote that "the workmanship and the service provided by the Verde Solaire team was exemplary". Both reviews are quoted in full on the [reviews page](/reviews). ## Monitoring, cleaning and maintenance Every grid-connected inverter sold today reports generation to a display and, on most models, to the manufacturer's phone app. That app is your first line of monitoring: a day with no generation while the sun is out is the signal to call. Verde Solaire's own Android app is for reaching the company and its services; it is not a plant monitor. Cleaning is the one maintenance task a rooftop system needs on a schedule in Delhi NCR, because dust cuts output between rains. The published Dharuhera plant was built with a module cleaning system and walkways; a home system is cleaned by hand with water and a soft brush, and [maintenance and cleaning](/learn/solar-panel-maintenance-and-cleaning) explains how often and what to avoid. Verde Solaire also offers [maintenance and cleaning as a service](/solutions/maintenance-and-cleaning). The company has not published a standard annual maintenance contract or the years of maintenance included with an installation, so if you want one, ask for it in the quote. ## How to raise an issue 1. Read the inverter 2. Check the two switches 3. Send the details 4. Diagnosis by phone, then a visit Most problems in the first year are not equipment failures: a tripped breaker, a monitoring app that lost its Wi-Fi, or a net meter that has not yet been read. [Common problems after installing rooftop solar](/learn/common-problems-after-installing-rooftop-solar) walks through each one with what to check before you call. For anything on this page that you would like to see against your own system, [how we work](/about/how-we-work) describes the survey, the quote and the handover. ## Questions **What warranty do Verde Solaire solar panels have?** Verde Solaire's July 2025 price posts state 25-year performance warranties on all three panel types it offers (mono PERC, bifacial and TOPCon). The warranty is the manufacturer's and its terms are on the panel datasheet named in your quote. **How long is the solar inverter warranty?** Inverter warranties are the manufacturer's, not the installer's. On Verde Solaire's published 430 kW plant at Dharuhera the Havells inverters carried a 10-year warranty. For a home system the years depend on the inverter make and model, which the written quote names. **Does Verde Solaire provide after-sales service?** Yes. The company's published pages describe after-sales support with every installation: an engineer you can reach by phone or WhatsApp, a site visit when one is needed, and help with the electricity board if a net meter or subsidy stalls. Customers on the testimonials pages describe the team as prompt in responding to queries. **Is there an AMC or annual maintenance contract for rooftop solar?** Verde Solaire has not published a standard AMC or the number of years of maintenance included with an installation, so this page does not state one. Ask for maintenance terms in the written quote before you pay the advance. **How do I raise a complaint about my solar system?** Note what the inverter display or app shows, check that the AC isolator is on and that grid supply is present, then call 080 4889 0647 or send the details on WhatsApp to +91 88263 18849. An engineer diagnoses by phone first and visits if needed; a faulty component is claimed under the manufacturer's warranty. --- # What size solar system do I need? Source: https://www.verdesolaire.com/learn/what-size-solar-system-do-i-need Updated: Wed Sep 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) Divide your average monthly units by roughly 110 to 115, the number of units a kilowatt of rooftop solar generates in a month on Verde Solaire's published planning yield after a derate for dust and monsoon, and round to the nearest published capacity. A 300-unit household lands close to 3 kW, and most homes using 300 to 400 units a month settle on 3 kW. The rest of this guide works the formula through worked examples, sets out roof area and panel count per kilowatt, and covers the DISCOM limits that can change the answer. Getting the size wrong costs money in both directions. A system too small still leaves a chunk of the bill on the grid at the most expensive slab, so the saving is smaller than the roof could have delivered. A system too large past the subsidised 3 kW step pays full price for the extra kilowatts and spends part of the year exporting more than it uses, credited at the DISCOM's own rate rather than what you would have paid to buy it. The right answer sits at the average of your bill, not at the smallest system that fits the roof or the largest one the roof can hold. ## Reading your bill for the right number The figure to divide is units, sometimes printed as kWh, on the consumption section of your electricity bill, not the rupee total. Add up the units on your last twelve bills and divide by twelve; a single month understates winter and overstates a summer peak, and either one on its own points to the wrong size. If your board bills every two months, halve the two-monthly figure before averaging. A household moving into a new connection with no bill history can use a comparable neighbour's bill or the [solar calculator](/tools/solar-calculator), which asks for the same average and returns a size, generation and net-price estimate together. ## The formula, and why it uses a derate Verde Solaire's commercial planning pages give a yield of about 1,450 units per kW a year in Delhi and 1,500 in Noida before losses. This guide applies a further 10% derate for dust and monsoon shading, which is Verde Solaire's own editorial assumption rather than a published figure, and divides by twelve for a monthly average. Per kilowatt, that works out to about 109 units a month in Delhi and about 113 units a month in Noida, or call it 3.5 to 3.7 units a kilowatt a day. Divide your monthly average by that per-kilowatt figure and you have the capacity that would offset it over a year; the [system size calculator](/tools/system-size-calculator) runs the same arithmetic on your own bill. 0–150 units a month: 1–2 kW · 150–300 units: 2–3 kW · above 300 units: above 3 kW is the scheme's own shorthand, and it agrees with the arithmetic above at every band. ## Sizing ladder: capacity, generation, roof and price The table below turns the formula into a lookup. Pick the row closest to your twelve-month average from the generation columns, and read off the roof area and the published price for that capacity; if your average falls between two rows, the worked examples further down show how Verde Solaire's own customers usually decide. | Capacity | Generates in Noida | Generates in Delhi | Roof area (approx.) | Published price | |---|---|---|---|---| | 1 kW | about 113 units a month | about 109 units a month | 100 to 117 sq ft | ₹70,000 to ₹80,000 | | 2 kW | about 225 units a month | about 218 units a month | 200 to 233 sq ft | ₹1,35,000 to ₹1,50,000 | | 3 kW | about 338 units a month | about 326 units a month | 300 to 350 sq ft | ₹1,99,000 to ₹2,10,000 | | 5 kW | about 563 units a month | about 544 units a month | 500 to 585 sq ft | ₹3,25,000 to ₹3,50,000 | | 7 kW | about 788 units a month | about 761 units a month | 700 to 820 sq ft | quoted per site | Roof area scales from the 300 to 350 square feet Verde Solaire publishes for a 3 kW system, which uses six panels of about 540 Wp, the module size on its recent Noida and Delhi installations; a 5 kW system uses ten, and a 7 kW system about thirteen. Prices beyond the published 1, 2, 3 and 5 kW steps, including 7 kW above, are quoted per site after a survey, and the [10 kW price page](/pricing/10-kw) carries the next published step. ## Worked examples for 200, 400 and 700 units a month **About 200 units a month.** By the formula, roughly 1.8 kW; round up to the published 2 kW step. Roof area is about 200 to 233 square feet, and the [2 kW price page](/pricing/2-kw) has the published range. This is a small flat or a one- or two-person household with modest air-conditioner use. **About 400 units a month.** By the formula, roughly 3.5 to 3.7 kW, on the boundary between the published 3 kW step and the next one up. A 3 kW system generates about 338 units a month in Noida and about 326 units a month in Delhi, which covers most but not all of a 400-unit household and leaves a smaller residual bill; because the subsidy is capped at 3 kW, every kilowatt bought beyond that is unsubsidised, so some households buy 3 kW and accept the residual, and others step up to 5 kW for headroom. The [3 kW vs 5 kW guide](/learn/3-kw-vs-5-kw) sets out that trade-off with the same figures used here. **About 700 units a month.** By the formula, roughly 6.2 to 6.4 kW, above the published ladder. A system in this range is quoted per site after a roof survey; a 5 kW system alone generates about 563 units a month in Noida, which would still leave a meaningful residual for a 700-unit household, so 6 to 7 kW is the more realistic target, subject to the roof area and the sanctioned load below. ## Sanctioned load and DISCOM limits The kilowatt figure above is what your roof and your bill call for; what the electricity board allows is a separate check. In Delhi, under the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade, so a 5 or 7 kW system on a smaller existing connection is not refused outright, and Delhi's rule applies up to 10 kW regardless of what you are sanctioned for today. In Uttar Pradesh, under the UPERC rooftop solar regulations of 2019, residential users may choose net or gross metering, and the DISCOM allows capacity within transformer limits, which is where a large request on a crowded local transformer, more than a formula on this page can predict, may be trimmed by the DISCOM. Either way, the feasibility check happens after you apply, not before, so size on your bill first and let the survey and the DISCOM confirm the rest. ## Do not size on your highest bill Twelve months, not one. A home that reads 250 units in a winter month and 800 in June averages around 450, and the formula above works from that average, not the peak. A system bought to offset the June air-conditioner load alone spends the cooler months generating more than the house draws, and in Delhi any surplus at year end is settled at the DISCOM's own rate rather than the retail tariff you would have paid for it. The [summer AC bill guide](/learn/cut-your-summer-ac-bill-delhi-noida) and the [seasonal generation guide](/learn/monsoon-and-dust-generation-ncr) both work from the same twelve-month view. ## Questions **What size solar system do I need for my home?** Take the average of your last twelve electricity bills in units, and divide by roughly 110 to 115, the units a kilowatt generates in a month on Verde Solaire's published planning yield after a derate for dust and monsoon. A 300-unit average points to about 3 kW, and a 400-unit average to 3 to 4 kW. The scheme's own guide is similar: 0 to 150 units a month suits 1 to 2 kW, 150 to 300 suits 2 to 3 kW, and above 300 suits above 3 kW. **How many units does a 1 kW solar panel system produce?** On the published planning yield less a 10% derate for dust and monsoon, about 109 units a month in Delhi and 113 in Noida, averaged over the year. Summer months generate above that average and the monsoon and winter fog below it. **How much roof space do I need per kW of solar?** Roughly 100 to 117 square feet per kW, scaled from Verde Solaire's published 300 to 350 square feet for a 3 kW system, which is six panels of about 540 Wp. A 5 kW system needs about 500 to 585 square feet, or ten panels. **Do I need to increase my sanctioned electricity load for a bigger solar system?** Usually not. In Delhi, under the DERC amendment of July 2024, no feasibility study is needed up to 10 kW on the same supply type, and the DISCOM handles any load increase or transformer upgrade itself. In Uttar Pradesh, residential users may choose net or gross metering, and the DISCOM allows capacity within the local transformer's limits, so a large request on a crowded transformer may be trimmed. **What size solar system suits a 400-unit-a-month home?** About 3.5 to 4 kW by the calculation above, on the edge between the published 3 kW step and the next one up, which is quoted per site. Many households on this boundary buy 3 kW, since the subsidy caps at 3 kW and every kilowatt beyond it is unsubsidised, and accept a small residual bill; others step up for the extra headroom. The 3 kW vs 5 kW comparison sets out that trade-off in full. **What size solar system suits a 700-unit-a-month home?** About 6 to 7 kW, above Verde Solaire's published ladder of 1, 2, 3 and 5 kW, so the price is quoted per site after a survey. The 10 kW price page and a free roof evaluation are the next steps for a home in this range. **Should I size my solar system on my highest summer bill?** No. Size on the twelve-month average, not the June peak. A home that reads 250 units in winter and 800 in June averages around 450; a system bought for the summer peak alone spends the cooler months exporting credit rather than saving money.