Solar prices and savings in Delhi NCR
For many homes, a 3 kW rooftop system is the point where savings and subsidy work hardest together. Verde Solaire's published price is ₹1,99,000 to ₹2,10,000 before subsidy; the estimated net cost is ₹91,000 to ₹1,02,000 in Uttar Pradesh and ₹43,000 to ₹54,000 in Delhi. Delhi also offers a generation incentive of ₹3 per unit for five years.
These figures give you a useful starting point, not a vague sales promise. Your final written quote follows a site survey and identifies the branded panels, inverter, structure, installation work and paperwork support included in your system.
Find the savings plan for your city
Your electricity board and state incentive affect the process and your final out-of-pocket cost. Select your city to see the savings and paperwork that apply to your roof.
Noida
PVVNL
Prices and subsidy
Delhi
BSES Rajdhani (BRPL) · BSES Yamuna (BYPL) · Tata Power-DDL
Prices and subsidy
Greater Noida
NPCL
Prices and subsidy
Ghaziabad
PVVNL
Prices and subsidy
Choose a system size that matches your bill
The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000. That is why 3 kW is a popular choice, while 5 kW often suits homes with higher usage. Start with your twelve-month average bill, not just your peak summer bill.
1 kW solar system price with subsidy
The smallest subsidised size: two panels, about 110 units a month, and why most homes are quoted 2 or 3 kW instead.
Read
10 kW solar system: price, subsidy, savings
A 10 kW rooftop system is quoted per site; the subsidy is fixed at ₹78,000 central plus ₹30,000 from Delhi or UP, for about 1,088 to 1,125 units a month.
Read
2 kW solar system price with subsidy
2 kW rooftop solar is ₹1,35,000 to ₹1,50,000 on the published list: ₹45,000 to ₹60,000 net in Noida, ₹55,000 to ₹70,000 in Delhi, about 220 units a month.
Read
3 kW solar system: price, subsidy, savings
3 kW rooftop solar: ₹1,99,000 to ₹2,10,000 on Verde Solaire's July 2025 list, ₹91,000 to ₹1,02,000 after subsidy in Delhi and UP; 330 to 340 units a month.
Read
5 kW solar system: price, subsidy, savings
A 5 kW rooftop system suits homes using about 400 to 600 units a month. See the price, subsidy, roof space and expected generation for Noida and Delhi.
Read
Rooftop solar price in Delhi, 1 to 10 kW
Delhi rooftop solar prices, 1 to 10 kW, in 2026: the ₹78,000 central and up to ₹78,000 Delhi subsidy, the ₹3 per unit GBI, and net metering by board.
Read
Rooftop solar price in Ghaziabad, 1 to 10 kW
Rooftop solar in Ghaziabad in 2026: published prices for 1 to 10 kW, the ₹78,000 central and ₹30,000 UP subsidy applied, PVVNL net metering and payback.
Read
Rooftop solar price in Noida, 1 to 10 kW
What rooftop solar costs in Noida in 2026: published prices for 1, 2, 3, 5 and 10 kW, the ₹78,000 central and ₹30,000 UP subsidy applied, PVVNL net metering, savings and payback.
Read
Rooftop solar price in Varanasi, 1 to 10 kW
What rooftop solar costs in Varanasi in 2026: published prices for 1 to 10 kW, ₹78,000 central and ₹30,000 UP subsidy applied, PUVVNL net metering and payback.
Read
Solar panel price in Greater Noida, 1–10 kW
Rooftop solar in Greater Noida in 2026: published prices for 1 to 10 kW, ₹78,000 central and ₹30,000 UP subsidy applied, NPCL net metering, bills and payback.
Read
What a quality solar quote should make clear
The published ranges include panels, inverter, the mounting structure, net metering, installation and warranty. When you compare quotes, check that each one states:
- The panel make, model and wattage, and whether the cells are on the ALMM List-II, which has been mandatory for subsidised systems since 1 June 2026.
- The inverter make, model and rating, and its warranty in years.
- The structure: material, height above the roof, and the wind rating.
- Cabling, earthing and the AC and DC distribution boxes, which some quotes leave out and bill later.
- The net-metering application and inspection, including who pays the meter charges. In Delhi there is no application fee for domestic systems up to 10 kW.
- GST at 5% (since 22 September 2025, down from 12%), shown separately.
- What is not included: civil work, load enhancement, a battery.
Verde Solaire's quotes name every component and separate the subsidy, so you can see the amount you pay and what protects that investment. Read how we work to see how we guide you from survey and financing to installation, net metering and subsidy processing.
Plan your solar savingsChoose your city and likely system size to estimate your cost, subsidy, savings, payback and EMI before you request a quote.Open the toolQuestions people ask
Start with a clear plan for your savings
Get a free roof assessment and a written quote for branded equipment. We will also explain the loan, installation, net-metering and subsidy steps.
